Search Documents

  • ISEE
    Controlled Blast Induced Liquefaction of Water Saturated Sands Using 250 m Long Horizontal Holes and Electronic Detonators

    By M. Ganster, H. Krenn

    The mission of the project is the fast and cost-effective rehabilitation of decommissioned lignite mining and coal upgrading facilities. This is necessary to ensure the successful future utilization o

    Jan 1, 2013

  • ISEE
    Blasting and Comminution Choices for the Management of the Mining Business

    By Alexandre Passos, Giorgio De Tomi, Tatiane Marin, Dennis Cremonese, Jacopo Seccatore

    "In the mining industry, rock excavation is the first phase of the comminution process. Downstreamoperations such as secondary breaking, crushing and milling terminate the process, reducing the size o

    Jan 1, 2016

  • SME
    L-73 Tunnel, Woodbury, Minnesota

    By Michael B. Gilbert

    The Woodbury L-73 Tunnel involved the design and construction of a 96-inch tunnel driven through 8,080 lf of very difficult ground conditions. Anticipated ground and groundwater conditions consisted o

    Jan 1, 2008

  • SME
    Shaft Sinking on the MetroWest Water Supply Tunnel Project

    By A. J. Stewart, M. Guay, J. W. Critchfield, A. P. Hoddeson

    The MetroWest Water Supply Tunnel project includes three main work shafts, excavated primarily in rock. Shaft L is 9.8 m (32 ft) diameter and 124.1 m (407 ft)deep. Shaft E is 7.0 by 12.8 m (23 by 42 f

    Jan 1, 1999

  • SME
    What it’s worth : A review of 1986 mineral royalty information

    By H. Lyn Bourne

    This is the fifth annual tabulation of mineral royalty information. This tabulation, like the previous editions, includes all of the earlier data. There are also 60 new entries. In addition to royalty

    Jan 7, 1987

  • NIOSH
    RI 8273 Longer-Than-Seam-Height Drill Development Program

    By G. K. Derby

    Five different types of drilling systems were developed under the flexible drill program that was initiated by the Federal Bureau of Mines to protect roof bolter operators. The systems were designed f

    Jan 1, 1978

  • TMS
    Experimental And Numerical Modeling Of The Flow Field In An Industrial Bronze Caster ? Improving The Numerical Model

    By S. Eck

    In previous work the influence of the casting speed on the flow field and the shape of the solidification front in an industrial 0.82 x 0.25 x 0.8 m³ bronze caster had been investigated. Both numerica

    Jan 1, 2009

  • AUSIMM
    Pit Water Management in a Mine Planning Cycle, Olympic Dam Case Study

    By D Barclay, S Mercer, S Wright

    Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I

    Jan 1, 2009

  • SME
    Michael Karmis: An Interview With the 2002 SME President

    Your thoughts on the current status of the global minerals industries? The global economic, technological, social and political changes of the last two decades of the 20th century resulted in the e

    Jan 1, 2002

  • IIMP
    Punto de equilibrio, herramienta de toma de decisiones en operaciones mineras

    By Armando Díaz

    Anteriormente, el objetivo de las organizaciones empresariales era la optimización de los procesos productivos a través de una limitada eficiencia en el mercado. Sin embargo, esta situación ha cambiad

    Sep 13, 2001

  • AUSIMM
    Size Separation Pretreatment and Alumina Recovery from Bayer Red Mud

    Size Separation Pretreatment and Alumina Recovery from Bayer Red Mud

    Sep 13, 2010

  • NIOSH
    Development Of Demonstration Hardware For Medium Frequency Mine Wireless Communication System – Executive Summary

    By Larry G. Stolarczyk

    [STATES REPORT Mining Research Mine Health and Safety Research for Period Ending 30 September 1980 PROGRAM Wireless MF Communication System DATE STARTED January 1980 TPO (USBM) Robert

  • AUSIMM
    Technology of Electrolytic Reduction of Alumina by the Hall-Heroult Process: III. The Anode Reaction During Electrolytic Decomposition of the Alumina

    The literature pertaining to the electrochemical reaction at the anode during electrolytic reduction of alumina by the Hall-Heroult process is not in universal llgreement about the gaseous product. Th

    Jan 1, 1967

  • CIM
    A Model Study of the Resistance to Air Flow of a Rectangular Mine Shaft

    By Cedric E. Gregory

    "A study of model rectangular mine shafts has been made in the wind tunnel, with the aim of reducing air-flow resistance elements to a practicable minimum. An analysis of Table 7 shows an indicated av

    Jan 1, 1973

  • AUSIMM
    The Development of Processes for the Treatment of Crude Ore, Accumulated Dumps of Tailing and Slime at Broken Hill, New South Wales

    The following paper on the development of processes for the treatment of crude ore, accumulated dumps of tailing and slime at Broken Hill, has been prepared by a committee of the Broken Hill Branch of

    Jan 1, 1930

  • AUSIMM
    The Application of Table Flotation to the Removal of Arsenopyrite from Galena Concentrates and Silica from Lime Sands

    This paper deals with the application of table flotation to two unusual mineral dressing problems. Both problems involved the removal of interfering minerals at sizes too coarse to normal froth flotat

    Jan 1, 1954

  • AUSIMM
    Determination of Traces of Tellurium in Rocks by Atomic Absorption Spectroscopy After Volatilization with Synthetic Pyrite

    This method determines tellurium at concentrations down to 0·01 p.p.m., with geochemical accuracy. Tellurium is volatilized from the rock at 800°C in the presence of sulphur from decomposing

    Jan 1, 1969

  • AUSIMM
    Contouring of Mining Properties with the Aid of the Tacheometer

    On the more important mines it is almost essential to have a general plan of the surface. A special feature of this plan should be the indication thereon of a suitable arrangement of contour lines, ei

  • SAIMM
    Air Pollution Control System Upgrade At Tubatse Ferrochrome

    By Luthie Els, Chris Coetzee, Roedolf Koekemoer, Casper Els, Olof Vorster, Frank Fereday

    Three electric arc furnaces (EAFs) were constructed by Union Carbide at Tubatse Ferrochrome (TFC) in1975. This plant was expanded to four furnaces at the East Plant in 1985 and the gas cleaning system

    Jan 1, 2007

  • AIME
    Ozark’s Haulage System Gets the Lead Out

    By C. E. Gerity

    Near Bunker, Mo., in the New Lead Belt, Ozark Lead Co. operates a 6000 tpd lead-zinc mine. Mined ore is transported to the surface in three mechanized and automated steps. The mine is developed by

    Jan 11, 1972