Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Appropriate Mining System for Residual Coal Around End?slopes in Chinese Surface Coal Mines

    By Takashi Sasaoka

    A great deal of coal will be left under the final end-walls in Chinese surface coal mines because of lower slope angle in shoveltruck mining systems and larger mining depths. In traditional surface mi

    Jan 1, 2013

  • SME-ICGCM
    Merging Coal Mine Geologic Hazard Mapping with Mine Production Rates—Industry Experience

    By Kevin Andrews, Scott Nelson, Terry Hamrick

    "In the process of Geologic Hazard Mapping (GHM) for underground coal mining, geologists evaluate the effects of various geologic and geotechnical conditions to assist with optimization of mine produc

    Jan 1, 2018

  • SME-ICGCM
    Numerical Modeling Of "Stiff" Backfill in the Coeur D'Alene Mining District (17e85e0c-8155-492f-9c87-d2b9dd6611c4)

    By Ed Van Eeckhout

    As part of a U.S. Bureau of Mines-sponsored project on the utilization of "stiff' backflll to minimize potential rock burst hazards, a finite element study was undertaken to predict stresses and

    Jan 1, 1984

  • SME-ICGCM
    Underground Measurement of Gateroad Stability at the Depth Around 1000m

    By Zbigniew Lubosik, Andrzej Walentek, Stanislaw Prusek, Aleksander Wrana

    "The Carboniferous coal measures, mined across Europe including the major European underground coal mining countries of Poland, UK, Germany, and Czech Republic, suffer from increasing extraction depth

    Jan 1, 2015

  • SME-ICGCM
    Ground Control of Longwall Top–Coal Caving Faces within Thick Coal Seams

    By Jinwang Zhang, Zhaohui Wang, Jiachen Wang

    "Thick coal seams (seam height larger than 3.5 m) account for a large portion of the proven coal reserves of China, and underground thick coal seam mining provides about 50% of the Chinese annual coal

    Jan 1, 2017

  • SME-ICGCM
    Roof Stability Mapping to Forecast Ground Conditions at an Illinois Basin Coal Mine

    By Phil R. Ames, Anil K. Ray, Murali M. Gadde, John A. Rusnak

    "Many factors can be responsible for coal mine roof falls including, mining geometry, stress conditions and local geology. In the Illinois Basin coal mines, roof instability is commonly attributed to

    Jan 1, 2010

  • SME-ICGCM
    Numerical Modeling of Stress Distribution of Gateroads Subjected to Dynamic Pressure of Longwall Mining in the Immediate Overlying Seam, a Case Study

    By Ximeng Li

    The entries that are subjected to dynamic pressure are much more difficult to maintain due to repeated disturbance. A case study of an entry stress distribution was performed using the FLAC3D program.

    Jan 1, 2013

  • SME-ICGCM
    The Effect of Discontinuities Characteristics on Coal Mine Stability and Sustainability: A Rock Fall Prediction Approach

    By Nikzad Oraee, Parham Khajehpour, Kazam Oraee, Arash Goodarzi

    "Rock fall related accidents continue to occur in coal mines, although artificial support mechanisms have been used extensively [1]. Roof stability is primarily determined in many underground mines by

    Jan 1, 2015

  • SME-ICGCM
    Strata Behavior Monitoring of the Sub-Inclination Fully Mechanized Top-Caving Face in Steeply Dipping Extra Thick Coal Seam

    By Dongfeng Yun, Zhu Liu, Wendong Cheng, Zhendong Fan, Dongfang Wang, Yuanhao Zhang

    "For the purpose of studying the strata behavior due to multislicing top coal caving longwall mining along-the-strike direction in steeply dipping extra thick coal seams, the shield support pressures

    Jan 1, 2016

  • SME-ICGCM
    Evolution Characteristics of Pressure-Arch in Disturbed Overburden During Shallow Horizontal Coal Mining

    By Shuren Wang, Wenbing Guo, Paul C. Hagan, Yanhai Zhao

    "The overlying strata is often destroyed in large scale during shallow coal seam mining, and the sliding instability of the caved roof seriously threatens the safety of the mining field. The typical s

    Jan 1, 2018

  • SME-ICGCM
    Investigation of Pillar Loading Considerations in Determination of Pillar Stability Factors for Longwall Gateroad Design

    By Heather E. Lawson

    Recent field data providing measured pillar loading from a deep western mine revealed that an increased load transfer distance existed compared to expected values (Larson et al., 2012). Additionally,

    Jan 1, 2013

  • SME-ICGCM
    Field Measurements of Overburden Strata Deformation Response to Longwall Mining

    By Xinzhi (Thomas) Du

    "In order to monitor the overburden strata deformation over a longwall mining area in the Pittsburgh Coal Seam, three boreholes were drilled across the longwall panel. Each borehole employed multiple-

    Jan 1, 2018

  • SME-ICGCM
    Strata Control Investigations During Fully Mechanized Coal Pillar Extraction in Indian Coalfield

    By Rajendra Singh

    Considering the importance of a fully mechanized depillaring operation, the Indian coal mining industry has introduced a number of such depillaring operations at depths of cover ranging from 60 m to 3

    Jan 1, 2014

  • SME-ICGCM
    Stability Analyses and Remediation of Two Mined?Out Coal Seams Adjacent to a Building

    By Gennaro G. Marino

    As part of the development of a shopping center in West Virginia, a significant bench had to be cut into a mountainside that was over 700 ft. high. As a result, a steeply stepped, over 400-ft.- high w

    Jan 1, 2013

  • SME-ICGCM
    Numerical Model Calibration for Simulating Coal Ribs (da729951-bd49-415c-b364-03a4e38bfd9c)

    By Michael Murphy, Khaled M. Mohamed, Berk Tulu

    "Failures of coal ribs are major hazards in underground coal mines. For the period of 2010 to 2014, rib falls were the leading cause of groundfall fatalities and accounted for 35% of all groundfall-re

    Jan 1, 2016

  • SME-ICGCM
    To What Extent the Mechanical Properties of Coal Play Role in Coal Mine Bumps? A Comparison Between Bump and Non?Bump Prone Coal

    By Gamal Rashed

    Coal bump is a sudden manifestation of the release of strain energy stored in a coal pillar (Peng, 2008). It is a very serious mining hazard that adversely affects the safety and productivity of the m

    Jan 1, 2014

  • SME-ICGCM
    Theoretical Analysis and Field Application of Solid Backfilling Method for Preventing Hard–Roof–Induced Rock Bursts

    By Nan Zhou, Jixiong Zhang, Qiang Zhang

    "Mining activities under hard roof could easily induce rock burst. Based on the geological conditions of widespread hard roof in China, this paper discusses the type, mechanism of occurrence and preve

    Jan 1, 2015

  • SME-ICGCM
    Analysis of the Design and Performance Characteristics of Pumpable Roof Supports

    By Timothy Batchler

    "Pumpable roof supports are currently being used to provide a safe working environment for longwall mining. Because different pumpable supports are visually similar and installed fundamentally in the

    Jan 1, 2016

  • SME-ICGCM
    Design Of A Roof Truss Bolting Plan For Bear Mine

    By C. P. Mangelsdorf

    Between June of 1975 and November of 1978 Stateham and Radcliffe of the Denver Research Center of the Bureau of Mines in cooperation with officials of the Bear Coal Company of Somerset. Colorado Condu

    Jan 1, 1984

  • SME-ICGCM
    Damage and Permeability Evolution Mechanisms of Coal under Unloading Condition

    By Zhengdong Liu, Kaizhong Zhang, Zhaonan Jiang, Yuanping Cheng, Biao Hu, Qingquan Liu, Ranpeng Wang

    "Major coal mining areas in eastern China have entered into the deep mining state. Gas pre-drainage, which has been successful at shallower depths, is not suitable at greater depths because of complex

    Jan 1, 2017