Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Application of the Coal Mine Roof Rating, Derived from Drill Core, in the Roof Support Design of a Coal Belt Conveyor TunnelBy John Rusnak
The Coal Mine Roof Rating (CMRR) is a practical rock mass classification system for use in design of mine openings. Data can be obtained for this purpose from exploration drill cores if simple geotech
Jan 1, 1998
-
Progressive Hangingwall Caving And Subsidence Prediction At The San Giovanni Mine, ItalyBy R. Balia
The upper part of the "Contatto Ovest" orebody, at the San Giovanni Pb-Zn sulphur mine (Sardinia, Italy), is mined by a sublevel caving method. With increasing mining depth, a progressive caving of th
Jan 1, 1990
-
Control Of Roadway Closure In Underground Coal Mines By Sidewall Weakening TechniqueOne of the problems associated with the maintenance of roadways in underground coal mines is that of dealing with roadway closure. Sidewall weakening technique is based on the transference of the h
Jan 1, 1990
-
Advancements in the Use of High-Modulus Polymer Mining Grids to Speed Longwall RecoveryBy Thomas A. Bailey
Since the advent of longwall mining, various methods and materials have been used during relocation to control the intrusion of the gob in the shield/panline area. (figure 1) Controlling this gob is c
Jan 1, 2006
-
Characterization of Internal Insertion Pressure During Installation of Fully Grouted BoltsBy Luis Giraldo
The installation procedure of fully grouted rebar bolts requires that the bolt be pushed through the resin grout until it is fully inserted in the borehole. Resin grout is a highly viscous fluid that
Jan 1, 2006
-
An Application Of Fem Back Analysis Method To Mine RoadwayKnowledge of initial ground pressures or in-situ stresses and mechanical properties and geological conditions is of great importance in drivage and maintenance of a mine roadway. Field measurements
Jan 1, 1990
-
Aspects of Chain Pillar Design in Relation to Longwall MiningBy B Whittaker
The paper examines the role of chain pillars in longwall mining layouts as used in several countries. The application of chain pillars in relation to their expected design role is discussed. An import
Jan 1, 1987
-
Sublevel Caving Mining Method for Extra-Thick Coal SeamsBy H. Nan
Using the case of Qianqiu Mine, Yima Coal Mining Administration, theoretical analysis, laboratory physical simulation, and underground observation were performed to study the major parameters for full
Jan 1, 2006
-
Mining Through In-panel Entries and Full-face Recovery Room WithoutBy John Smyth
Mining through in panel entries and the full face recovery method has been successfully practiced at U.S. Stwl, Mine 50. Suppat of the cut-through entries and recovery room is critical. Traditionally,
Jan 1, 1998
-
Application Of Time Domain Reflectometry To MiningBy Kevin M. Connor, Malcolm J. McPhersqn
Examples are presented in which Time Domain Reflectometry (TDR) was employed to locate deformation of rock masses induced by mining. The first example involved motoring the propagation of overburden f
Jan 1, 1984
-
Effects of In-seam and Near-seam Conditions and Asymmetric Pillar Loading on Coal Pillar StrengthBy Daniel W. H. Su
The importance of incorporating fundamental principles of rock material response and failure mechanics into a pillar strength design model has been demonstrated. To accurately assess pillar strength,
Jan 1, 1997
-
Roadway Strata Management in the New South Wales Underground Coal Mining IndustryBy Rob Thomas
Strata management is a critical and now necessary requirement in the New South Wales underground coal mining industry. As a formal and structured process, strata management allows ground supp
Jan 1, 2007
-
Multiple Seam Mining Interactions ? A Case StudyBy Khaled Morsy
The studied mine extracts the Sewickley seam using room-and-pillar method. The overburden at study site ranges from 400 to 800 ft. Eight years earlier, the Pittsburgh seam was mined 80 ft underneath t
Jan 1, 2006
-
A Method For Determination Of Strength Of Coal MassBy Guo Junfeng
The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst, and its prediction method. Up to now, there has not been a method for determi
Jan 1, 1992
-
Convergence And Load Measurements In An Underground Mine In [Türk±ye]By A. G. Pasamehmetoglu
This paper describes the conver¬gence and load measurements carried out in inclined seams at five longwall faces, two of which were supported by hydraulic props and the other three by conventional tim
Jan 1, 1992
-
Factors Influencing the Occurrence of Coal Pillar Bumps at the 9-Right Section of the Olga MineBy David C. Oyler
The Bureau of Mines conducted research at the 9-Right Section of the Olga Mine to determine the cause of bumps and aid in the development of appropriate control techniques. The purpose of this paper i
Jan 1, 1987
-
Microseismic Monitoring In The Sydney CoalfieldBy G. R. Corbett
Between 1977 and 1984, No. 26 Colliery, at Glace Bay in the Sydney Coalfield, suffered from a series of 37 rock/gas outbursts. These events were characterized by the complete pulverization of a sandst
Jan 1, 1994
-
Coal Pillar Life Prediction in the Vaal Basin, South AfricaBy J. Nielen van der Merwe
This investigation was done to develop a method to predict the lie of coal pillars. It has long since been known that coal pillars deteriorate over time, but there was no method to quantify the deteri
Jan 1, 1998
-
Catastrophic Collapse Of Highwall Web Pillars And Preventative Design MeasuresBy Karl Zipf
In highwall mining, once a sufficient number of web pillars are developed, they can fail catastrophically in a domino-type failure, posing a safety hazard to highwall miners and sterilizing mineable r
Jan 1, 1999
-
Comparative Studies In The Mechanics Of Grouted Roof BoltsBy Stephen P. Signer
To improve the understanding of the support interaction mechanics between grouted bolts and coal mine roofs and to help lay the foundations for improved design and evaluation techniques, the 0.8. Bure
Jan 1, 1988