Implementation Of Linear Programming Model For Optimum Open Pit Production Scheduling ProblemBy Edgar Urbaez
Production scheduling is one of the most important factors affecting mine planning. A program -Mine Scheduler -that aids mining engineers with the setup of an optimum open pit production scheduling al
Jan 1, 1999
-
A Core Bend Specimen With Chevron Edge Notch for Fracture Toughness MeasurementsBy Finn Ouchterlony
INTRODUCTION Much of present fracture toughness testing con¬cerns chevron notched specimens (Newman Jr., 1984) since these, in principle, require neither fatigue precracking nor more registration t
Jan 1, 1986
-
Fundamental Aspects Of Gold Cyanide Adsorption On Activated CarbonBy C. Klauber, H. G. Linge, W. G. Jones
The carbon-in-pulp process for gold processing depends on the adsorption of dissolved Au(CN)2- from solution onto activated carbon. Our work shows that coconut and peat based carbons have the same mec
Jan 1, 1989
-
A Summary Of Experimental Findings On Solution Methods For Mine Ventilation NetworksBy Jeong-Heum Kim, Jan M. Mutmansky
The primary purpose of the research summarized in this paper was to experimentally investigate the performance of numerous mine ventilation network iterative solution procedures under controlled condi
Jan 1, 1991
-
Comparison Of Two Simulators For Belt System Design (PREPRINT NUMBER 89-97)By S. D. Thompson
Conveyor belt haulage has become the preferred mainline transport method in under-ground coal mining, especially for multi-unit mines. Optimum designs for belts (width and speed) and surge bins (place
Jan 1, 1989
-
Direct Reduction and Beneficiation of Iron Ores Containing Titanium, Manganese and Chromium Oxides and Alkaline Metal SulfatesBy A. G. Oppegaard
Most iron ores treated by the R-N direct reduction process yield metallic iron products considerably lower in titanium, manganese, and chromium oxides and alkaline metal sulfates/sulfides than were co
Jan 1, 1958
-
Site Evaluation For Cavability And Underground Support Design At The Climax MineBy John T. McDonough
The Climax Mine of AMAX's Climax Molybdenum Division is currently producing approximately 34,000 tons of molybdenum ore per day from two underground levels (see Figure I), and initial design is u
Jan 1, 1977
-
The Use Of High Pressure Roll Grinding For Optimization Of Copper LeachingThis paper provides a summary on the use of the POL YCOM high pressure grinding roll (HPGR) for increasing extraction in copper leaching. The energy-efficiency and significant hydrometa1lurgical benef
Jan 1, 1996
-
An Ion Exchange Method For The Utilization Of Waste Hydrochloric Acid ? IntroductionBy P. Hadzeriga
Ion exchange techniques have been growing fast and spectacularly in all phases of Science for the last two decades, but still its acceptance as a unit operation in Metallurgy is resisted. Mainly this
Jan 1, 1964
-
Dynamic Modeling & Simulation of a Sag Mill for Characterization of Mill ChargeBy V. Srivastava, T. Ghosh
"Modeling and Simulation of SAG Mill has been widely used in design and optimization of mill performance in terms of its power draw, processing capacity and product size distribution. However, these m
Jan 1, 2017
-
Augmented-reality system for training of heavy-equipment operators in surface miningBy Amy McBrayer, Vladislav Kecojevic, Juan David Valencia Quiceno, Dragan Bogunovic
The mining industry’s commitment to innovation reflects a history of adopting technological advancements to enhance workplace safety, environmental sustainability and vocational training. The objectiv
Feb 1, 2025
-
Mechanical Roof Pulling Technique For Evaluating The Effectiveness Of Roof Bolting SystemsBy Chi-shing Wang
The U.S. Bureau of Mines has been developing the mechanical roof pulling technique as a method for evaluating the effectiveness and the comparative advantages and disadvantages of various roof bolting
Jan 1, 1974
-
CYANIDE RECOVERY BY THE SART PROCESS FOR THE Loso-MARTE PROJECT, CHILEBy C. A. Fleming, K. W. Sarbutt, P. K. MacPhail
The SART process has been developed for Teck to treat barren solution from the cyanidation/CIP process that has been developed for the Lobo-Marte project in Chile. The objective of the process is to
Jan 1, 1998
-
A New Geotechnical Classification System For Greek Soils Providing Strength Parameters EstimationBy Ch. Arvanitidis
This work concentrates on investigating the development of a geotechnical classification method for the Greek soils, which can readily provide a rough but usable estimate of the main strength paramete
Jan 1, 2006
-
Progress Report Of A Reclaimed Wetland On Phosphate Mined Land In Central FloridaBy J. D. Carson
A 0.60 km2 (150 acre) wetland was reclaimed by Agrico Mining Company as part of a 1.48 km2 (366 acre) reclamation program in southwest Polk County, Florida approved by the Florida Department of Natura
Jan 1, 1983
-
Challenges in the Design of Segmentally Lined Tunnels for Combined Sewer OutfallsBy Anthony Harding, Rodolfo D. Aradas, Juan M. Fernandez, Darío Tsingas
"The adoption of tunneled combined sewerage interceptors and outfalls leads to design linings which are often subject to internal pressures that are larger than the external pressures, resulting in si
Jan 1, 2016
-
Continuous pilot-scale testing of column flotation for recovery of fine coalBy J. G. Groppo, B. K. Parekh
A series of performance studies were conducted using countercurrent column flotation to recover a marketable clean coal product from existing preparation plant fine waste streams. The test work was co
Jan 1, 1991
-
Remote Sensing Of Water Pollution Problems In Karst Terrain ? IntroductionBy James H. Williams
More than 100,000 residents of Springfield and surrounding communities live on karst (sinkhole) terrain on the Springfield Plateau in southwestern Missouri. The city occupier much of the headwaters ar
Jan 1, 1970
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
Transloading: A Case Study Of The Tucker Hill Perlite Project And Its Transloading TerminalBy Charles N. Speltz
The cost of transportation of industrial minerals frequently is higher than the cost of the product. When a mine, industrial-mineral plant, or customer is served by a single railroad, because of the l
Jan 1, 1999