Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sulfur speciation analysis in cyanide leach solutions with liquid chromatographyBy C. Nesbit, N. Duru
During the cyanide leaching process of gold and silver, ores that come from the transition zones which typically con-tains low levels of sulfide may produce one or more of the following reduced sulfur
Jun 1, 2024
-
Aramid's Place in Underground Coal MiningBy Ronald P. Wright
ARAMIDS UNDERGROUND COAL MINING
Jan 1, 1993
-
Kinetics of atmospheric leaching from a Brazilian nickel laterite ore allied to redox potential controlBy S. D. F. Rocha, A. L. A. SANTOS, E. M. A. BECHELENI, F. P. C. Silvas
Hydrometallurgical processes are needed to extract nickel (Ni) when it is disseminated in mineral matrix. High-pressure acid leaching (HPAL) and atmospheric acid leaching (AAL) are alternatives, and A
-
Augmentation Of Small-Hole Rock Drilling With Water JetsBy Gerald Zink
The work described in this paper is sponsored by the Bureau of Mines for the purpose of accelerating the drilling of roof bolt holes and reducing the quantity of materials needed to fill each hole. A
Jan 1, 1978
-
Three-Dimensional Ventilation Modeling of a Large-Opening Stone Mine Using COMSOL Multiphysics - SME Annual Meeting 2025By K. V. Raj, VASU GANGRADE
Airflow in large-opening stone mines is largely dependent on the natural ventilation due to the large cross- section area of the opening. The openings of such stone mines are typically twice or thrice
Feb 1, 2025
-
Benefits Associated With Two-Stage Spiral Cleaning At McClure River Preparation PlantBy S. Horton, F. L. Stanley, P. J. Bethell
Introduction The McClure River Processing Plant is located at McClure in Dickenson County, VA. The plant was originally constructed in 1979 as a 600 st per hour facility. The plant is fed by coals
Jan 1, 1992
-
Control Of Crushing Circuits Will Reduce Capital And Operating CostsBy Malcolm D. Flavel
As indicated in the introduction to this paper, it is a sequel to that which I gave to the last annual meeting in Atlanta in march. This paper goes further into aspects of crushing and screening, prim
Jan 1, 1977
-
Digital Work Preparation Tool for Underground Construction Tasks—Planning and Optimizing Projects - RETC2023By Julia Herhold
The demand for sustainable and profitable/efficient projects within the tunneling and other underground engineering sectors grows rapidly. Construction tasks play a key role within the project conduct
Jun 13, 2023
-
A Tactical Ground Control Approach For Preparing Copper Cliff Mine – South Side’s 810 Orebody For Continued Mining At Depth - RASIM 2022By Chris Groccia, Damodara R. Chinnasane
Vale is in the process of resuming mining in the lower 810 ore body (810 OB) below 4130L at Copper Cliff Mine – South Side. Production in the lower 810 OB had continued until it was temporarily ceased
Apr 26, 2022
-
Technology Development and Competitive Advantage: Sustainable or Short Term?By John O. Marsden
Technology development has played a crucial role in the minerals industry throughout history. The development of new technology allows mankind to produce metals and minerals at progressively lower cos
Jan 1, 2004
-
The Upper Hidden Basin Diversion Project Design and Construction at Terror Lake—Kodiak, Alaska - NAT2024By Jennifer King, Julius Strid, Steve Brandon
The Upper Hidden Basin Diversion (UHBD) tunnel was driven approximately 1.2 miles by the drill-and-blast method primarily through massive granite bedrock geology for the Kodiak Electric Association, I
Jun 23, 2024
-
Ore Control Data Driven Method for Estimating the Bulk Ore Sorting Value at Base Metal Open Pit MinesBy Miguel Carrera, Jose Arnal, Julian Ortiz, Maarten Haest, Fouad Faraj
ShovelSense is a complete solution for bulk ore sorting at the mine face that combines robust shovel bucket mounted X-ray fluorescence sensors, with real-time material classification, fleet management
Jun 25, 2023
-
The use of Atmospheric Monitoring Systems in Dieselized Coal MinesBy Mark J. Schultz, William J. Francart, Gary J. Wirth
Atmospheric Monitoring Systems (AMS) utilizing carbon monoxide sensors have demonstrated their superiority over thermal type fire sensors for early fire detection in underground coal mines. After prov
Jan 1, 1995
-
Markets And Opportunities For Natural Mined Gypsum From MexicoBy T. Harris
Exports of crude gypsum from Mexico currently comprise about 60% of all domestic shipments, and about 25% of the imported material consumed in the U.S. wallboard industry. However, of growing importan
Jan 1, 1996
-
Modification Of Steam Generating Units For Low Sulphur CoalsBy Clarence Hardy Long
In January of 1969 the United States Department of Health, Education and Welfare, through the National Air Pollution Control Administration, published a series of Air Quality Criteria (4'S) and C
Jan 1, 1970
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022
-
Modeling spatial variance and investigating the effects of variability on intact rock strength and stability of entries in a longwall mineBy Danqing Gao, Brijes Mishra
Heterogeneity in rock formation affects both rock behavior and strength. Spatial variance of rock properties is an important characteristic of rock that addresses the heterogeneity of mechanical and p
-
A Process Engineering Evaluation Of The Crossflow SeparatorBy G. T. Adel
Hindered-bed separators are often used in the minerals processing industry to classify particles according to size and density. A new technology, known as the CrossFlow, was recently developed to ove
Jan 1, 2001
-
Single Time Period Production Scheduling Of Open Pit MinesBy B. Elevli, M. D. G. Salamon
Production scheduling of an open-pit mine is one of the most important steps in open-pit mining. The mine's production schedule defines the distribution of cash flows and, as a result, directly i
Jan 1, 1992
-
Simulation of Recovery of Upper Remnant Coal Pillar While Mining the Ultra-Close Lower Panel Using Longwall Top Coal CavingBy Pengfei Wang, Guorui Feng
"With the depletion of easily minable coal seams, less favorable reserves under adverse conditions have to be mined out to meet the market demand. Due to several historical reasons, a large amount of
Jan 1, 2019