Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Tolt Pipeline Under-Crossing of the Snoqualmie River

    By Dennis Molvik, Omar Fulton, Chris D. Breeds, Don Gonzales

    The Tolt Pipeline No. 2, West Snoqualmie Valley project, is part of a water supply project linking the Tolt reservoir in East King County to the City of Seattle through a nominal 2.13 m (7-ft) inside

    Jan 1, 2003

  • SME
    Technical Note - Flotation Of Low-Grade Birnin Gwari And Alawa Graphite, Nigeria.

    By G. G. O. O. Uwadiale, M. A. Kollere, M. A. U. Nwoke

    Birnin Gwari and Alawa graphite deposits were upgraded by flotation. Using 0.5 kg/t kerosene and 0.25 kg/t sodium silicate, flotation concentrates grading 90.7% and 88% Cg with recoveries of 86.2% and

    Jan 1, 1998

  • SME
    A Real-Time Framework at the Industrial Desktop

    By Osvaldo A. Bascur, J. P. Kennedy

    Companies have installed powerful desktops for their personnel and instrumentation and control systems in their plants. These desktops are, in many cases, connected to a company intranet. Still, proce

    Jan 1, 1999

  • SME
    Estimation of pre-mining conditions for trace metal mobility in mineralized areas: An overview

    By Charles N. Alpers, D. Kirk Nordstorm

    A variety of approaches have been used in the recent literature for the estimation of pre-mining (or natural background) metal concentrations in areas affected by mining. The following is a list of so

    Jan 1, 2000

  • SME
    Impact Of Control Parameters On Shearer-Generated Dust Levels (d1a2d171-424d-4a4b-afcc-224df2ebf29f)

    By A. E. Prokop, J. P. Rider

    Previous research on continuous mining operations has shown that significant interactions exist between dust-control parameter application and the resulting respirable dust levels. However, simply inc

    Jan 1, 2003

  • SME
    Mixed Face Tunnel Excavation Using Floating Crown Bar And Modified Spiling Methods

    By Joginder S. Bhore, Francis M. Keville, David E. Puza, Roger C. Borggaard

    A portion of the Massachusetts Bay Transportation Authority's Red Line Extension through Somerville, Massachusetts consists of 1,553cm (5,092 LF) of hard rock tunneling 6.7m (22 ft.) diameter hor

    Jan 1, 1981

  • SME
    Laboratory evaluation of shield dust entrainment in high-velocity airstreams (f1c7e8d5-6daf-4be6-a7d2-022a85a6cb07)

    In conjunction with steady increases in production levels, longwall operators have applied greater quantities of ventilating air and spray water in an effort to control respirable dust and/or methane.

    Jan 1, 2002

  • SME
    The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022

    By B. Catalano, D. Ifrim

    The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel

    Dec 1, 2022

  • SME
    Construction of the East-West Cross Drift Tunnel at the Yucca Mountain Site

    By Brian Fulcher, John Eastlund, J. B. Copeland

    Following the completion of the 7,600 m primary access tunnel by Kiewit/Parsons Brinckerhoff (K/PB) in April 1997, an exploratory East-West Cross Drift Tunnel was constructed at the Yucca Mountain Pro

    Jan 1, 1999

  • SME
    Improving the characteristics of fine dolomitic-limestone tailings by agglomeration with selected materials

    By M. C. Rockwell

    There are about 1.8 Mt (2 million st) of discarded dolomitic-limestone tailings from the Gays River lead/zinc mining operation in Nova Scotia currently stockpiled in a tailings pond at the mill site.

    Jan 1, 1987

  • SME
    Design for the Cross City Tunnel, Sydney

    By Harry R. Asche, Manfred K. Lechner

    The Cross City Tunnel comprises 2km of a new underground traffic route in Sydney, Australia. The route is very complex, involving some six separate tunnels and three underground Y-junctions. For al

    Jan 1, 2003

  • SME
    Phosphate Raw Materials Of Tennessee

    By Robert E. Hershey

    The phosphate industry is the fourth-ranking mineral industry in Tennessee; it has an annual value of 13,000,000 and a yearly production of almost 2,000,000 tons of phosphate ore. Tennessee, at presen

    Jan 1, 1960

  • SME
    Treating Those Dirty, Dastardly, Stray SO2 Off Gases

    By Steven M. Puricelli

    In recent times, smelter off gases treatment plants have become more efficient and environmentally friendly. Where in the past it was acceptable to process only high strength, treatable furnace gases,

    Jan 1, 1998

  • SME
    A Long Downhill Haul ? Introduction

    By D. J. Crawford

    The Lucerne Valley Operations of the Minerals, Pigments and Metals Division of Chas. Pfizer & Co., Inca, are located about 5 miles south of the town of Lucerne Valley, California. These operations con

    Jan 1, 1967

  • SME
    Leaching And Recovery Of Gold From Black Sand Concentrate And Electrochemical Regeneration Of Bromine

    By J. A. McKeown, B. M. Sanders, A. Dadgar, R. H. Sergent

    This paper describes the leaching of gold with Geobrom® 3400 from a very rich (6.2 kg/tonne) black sand concentrate and its subsequent recovery by ion exchange resins and solvent extraction. The disso

    Jan 1, 1990

  • SME
    Satisfying Apparent Temperature Requirements in Mobile Refuge Alternatives Using Vapor Compression Refrigeration and Expendable Desiccant

    By K. Deaton

    "INTRODUCTION A packaged cooling system is being developed for refuge alternatives (RAs) that meets MSHA qualification guidelines for deployment in coal mines. This system will allow full occupancy ra

    Jan 1, 2017

  • SME
    Lining And Finishing Eisenhower Memorial Tunnel

    By Werner A. Ruemmele

    Eisenhower Memorial Tunnel, called Straight Creek Tunnel during construction is located 60 miles west of Denver, Colorado at 11, 160 ft. elevation. It is 8, 510 feet long, and carries two lanes of 1-7

    Jan 1, 1974

  • SME
    Conceptual And Symbolic Modeling Of Steep Slope Contour Mining

    By J. H. Gasper

    The overall success of steep slope (>20°) contour mining is dependent upon many factors. The major factor is the selection of the mining method that best suits the premining site conditions both envir

    Jan 1, 1991

  • SME
    Environmental Problems Of Oil Shale Development

    By John W. Rold

    These encompass all adverse effects of oil shale mining, processing, and ancillary developments on the environment. Specific problems concern: land, vegetation, wildlife, water, air, population growth

    Jan 1, 1972

  • SME
    New Ways to Use Information in Industrial Plants

    By Osvaldo Bascur

    Large metallurgical complexes have more data than a small city and much of it is "real time," changing rapidly as internal and external conditions evolve. As corporations buy and sell assets and reeng

    Jan 1, 2000