    Computers And The Planning Of Dragline Mines

    By Peter N. Calder, J. L. Workman

    There are many opportunities for computers to assist in dragline mine planning. Three important areas particularly lend themselves to computer assisted study. These are overall mine design and plannin

    Jan 1, 1989

  • SME
    The Cost And Benefit Of The Phase 2 Investigation For The Reach 4 Tunnel, How A Roll Of The Dice Came Up BIG In Las Vegas

    By Ray Brainard

    The subsurface investigation for the Reach 4 Tunnel was expected to be completed in a single phase. This assumed that data from two nearby previous tunnels, combined with limited new subsurface inform

  • SME
    Prediction Of The Penetration Rate Of TBM Using Adaptive Neuro Fuzzy Inference System (ANFIS)

    By K. Oraee

    Rate of penetration of Tunnel Boring Machines (TBM) has a significant role in the planning, measurement of productivity and performance of any tunneling project. In this paper, the application of Adap

    Jan 1, 2012

  • SME
    Using Steel Fibers to Reinforce Final Shotcrete Linings

    By Thomas Schwind, Pamela S. Moran

    For short tunnels, a reinforced cast-in-place lining is not economical and shotcreteis a logical substitution. In the past, reinforced shotcrete linings have been constructed with lattice girders and

    Jan 1, 2005

  • SME
    Simulation Modeling Validates Load and Haul Requirements at Cortez Gold Mines

    By W. L. Jacobsen, T. L. Dyer

    Cortez Gold Mines completed a feasibility study for a new openpit gold mine in north central Nevada. The production schedule calls for a peak in material movement. This schedule is based on current op

    Jan 1, 2007

  • SME
    Playing Fields: Level And Otherwise

    By M. Rieber

    Building on earlier work, an analysis relevant to international (Australasian) minerals trade is developed which accounts for both the impetus of globalization and national reaction or protection. At

    Jan 1, 2002

  • SME
    Discussion - Performance evaluation of indicator kriging in a gold deposit

    By Y. C. Kim, I. S. Roditis, P. K. Medhi

    P. Mousset-Jones I found the article most interesting and timely. I consider it imperative that mine case studies like this one are undertaken and published so that the practicing mining engineer and

    Jan 3, 1988

  • SME
    Study On Leaching Vanadium From Roasted Residue Of Stone Coal

    By D. He

    In China, the total reserves of vanadium, reported as V2O5, in stone coal is 118 Mt (130 million st). Recovering vanadium from such a large resource is very important to China?s vanadium industry. The

    Jan 1, 2008

  • SME
    Improving The Capture Of Coarse Particles Using Bubble Clusters - Preprint 09-083

    In the present study, we have investigated the conditions for the formation of bubble clusters and the effect of well-defined agitation on the stability of clusters. A specially designed cell was used

    Jan 1, 2009

  • SME
    Analysis Of Failure Modes For Fully Grouted Resin Bolts

    By K. Heasley, A. Yassien, A. Khair, S. Peng

    There are three major components of a fully grouted roof bolt which primarily determine its ability to develop and sustain load: the steel rebar, the resin annulus, and the rock/grout interface. The u

    Jan 1, 2004

  • SME
    Earthmover Tires – Big Tires, Big Shortages

    By Tim O’Neil

    The earthmover tire shortage has been a case of bust and boom for the tire industry. Tire producers were unwilling to invest ahead of the mining boom. In their defense, though, the metals sector of

    Jan 1, 2006

  • SME
    Ventilation efficiency is it cost effective?

    The efficiency of a coal mine ventilation circuit is usually measured by the ratio of the sum of the face quantities divided by the quantity supplied by the fans. Other types of systems use the power

    Jan 1, 2009

  • SME
    Performance Analysis Of Different Estimation Methods On Conditionally Simulated Deposits (0cbc8d79-eac1-4ce3-b58c-f46ab73f673b)

    By A. Arik

    An accurate estimation of mining block grades continues to be a challenging task for ore reserve practitioners. Two of the factors that affect the accuracy of the estimates are the estimation method u

    Jan 1, 2000

  • SME
    Handling Infiltration Into Underground Structures

    By Edward D. Graf

    Once the heavy work of mining, supporting and completing an underground structure is finished, there is frequently the problem of handling unwanted water infiltration into the opening. Methods of cont

    Jan 1, 1987

  • SME
    Management styles and employee attitudes will change, but US mining will still need export trade

    By Steve Karl

    Introduction Technological advances in mining and processing have started the domestic mining and mineral industry back on the road to competitiveness. A massive trade deficit, however, coupled

    Jan 3, 1987

  • SME
    Coal Mining Subsidence and Golden Eagle Habitat

    By Val E. Payne

    Issues between resource utilization and resource preservation often develop in connection with coal mining. One such conflict exists in eastern Utah where PacifiCorp and Energy West Mining Company are

    Jan 1, 1986

  • SME
    The QIT Madagascar minerals deposits - geology, mining & mineral processing

    By M. Mead, J. Dumouchel, W. Yule, J. Giroux

    The QMM mineral sands of South East Madagascar contain approximately 1,900 million tonnes of mineable sand with a total heavy mineral (THM) content of roughly 4.5wt%. The QMM deposits are the world’s

    Jan 1, 2005

  • SME
    Design of Rock Shafts Adjacent to Heavily Loaded Columns

    By Nikolas K. Sokol

    Underground construction often requires working within a very congested urban environment, including excavating shafts adjacent to highly sensitive and multistoried structures, sometimes even within s

    Jan 1, 2008

  • SME
    Nutley Quarry Trunk Sewer Project

    By Michael V. Mergentime, Prakash M. Donde

    The Nutley Quarry Trunk Sewer Project is a good example of a tunnel that went through difficult and complex ground. The 2 m (7ft.) diameter and 840 m (2,750 ft.)long tunnel passed through soft ground,

    Jan 1, 2001

  • SME
    A Subsidence Prediction Model for Longwall Mine Design

    By Vladimir Admek, Paul W. Jeran, Michael A. Trevits

    It has' been found that lithological conditions over the Pittsburgh Coal bed cause the subsidence coefficient to vary within the area of the subsidence trough. This precludes the use of European

    Jan 1, 1986