Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Comparative Study Of Ppv Analysis Of Tunnel Rounds Using Both Non Electric And Programmable Electronic DetonationBy Andrew Wetherelt
Blast vibrations are of paramount importance in a society where ever increasing development is putting more stringent requirements on their control. Increasing civil development and more complex extra
Jan 1, 2007
-
The Effects of Various Wet-Hole Loading Methods on Powder FactorBy Neal Lee
Often the effects of wet boreholes are not taken into consideration when designing a blasting program to exhibit a certain amount of explosive energy per unit of rock such as design by powder factor,
Jan 1, 2011
-
Median and Mean in the Kuz-Ram ModelBy CVB Cunningham
"The Kuz-Ram model as originally proposed included an error in assuming that the mean fragmentsize predicted by Kuznetsov’s equation was actually the 50% passing size. In 2003 Spathis began discussion
Jan 1, 2016
-
Recent Projects - Emergency Bridge BlastingBy Brent Blanchard
As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur
Jan 1, 2003
-
Minimising Coal Damage and Loss Due to Cast BlastingBy Tapan Goswami
The main objective of the blasting phase in a coal mining operation is to maximise the coal recovery. However, coal loss due to blasting is a serious problem. The Australian Coal Association Research
-
Minimising Coal Damage and Loss Due to Cast BlastingBy Tapan Goswami
This paper discusses the importance of coal mapping, the rock properties of the roof and floor interface of the coal seam, and the significance of loading and initiating designs in minimising coal dam
Feb 1, 2020
-
Fewer Surprises When You Measure the SizesBy Tom C. Palangio
Commercially available online particle size analyzers (OPSA) are in their third decade of development (Palangio, T.C., 1985), (Franklin, J. A., Maerz, N.H., 1987), (Maerz, N.H., Franklin, J.A., and Co
Jan 1, 2016
-
Using An Anfo/coal Blended Blasting Mixture For Commercial Blasting ApplicationsBy Dennis Wilzbacher, John Wiegand
In an effort to reduce the cost of bulk explosives, Vigo Coal Company found that the addition of coal mined at their Friendsville Mine, not only reduced explosive costs, but also appeared to actually
Jan 1, 2007
-
Ore guiding in underground mining using MWD and machine learningBy J. Sanchidrián, A. Fernández, P. Segarra
The combination of chemical analysis techniques as XRF and measurement-while-drilling (MWD) technology in underground mining is a novel approach to gather comprehensive on-line information about physi
Jan 1, 2024
-
Perimeter Control Utilising Electronic DetonatorsBy John Wall
The use of electronic detonators in civil tunnelling applications, to reduce vibration is small firings has been successfully utilised for a number of years. As part of the mining industry’s commitmen
Jan 1, 2012
-
Blasting Near a CrusherBy Scott G. Giltner, Alex Schwenk
Blasting within 250 ft of a crusher was successfully executed through the application of electronic detonators, 3-D imagery, signature hole analysis, custom loading of blast holes. The blast was well
Feb 1, 2020
-
Demolition of Churchill House in Belfast, IrelandBy Dick Green
During the recent troubles in Northern Ireland due to terrorist activities, there have been many buildings demolished or damaged by improvised explosives. This article explains about the Demolition of
Jan 1, 2006
-
Application of the NIOSH-Modified Holmberg-Persson Approach to Perimeter Blast DesignBy Chick Kerkering, Stephen Iverson
Perimeter control blasting is common in civil construction projects but not as common in mining. A poorly designed and executed underground mine development blast design can result in unwanted wall ro
Jan 1, 2008
-
Electronic Accuracy Achieved with Non-Electric Initiation (7a8110cb-addf-409b-b1cc-4a8ccdd15ad7)By Sandy Tavelli, Thomas L. Barkley
This discussion will present a case study in developing solutions to a metropolitan quarry’s public relations, legal, environmental, and productivity problems. It details an extensive and detailed pro
Jan 1, 2004
-
Full-Scale Testing of Delay Timing Effects on Rock Fragmentation in the Shock Collision RegionsBy M R. Hettigner, J Nawrocki, C E. Johnson, P G. Cahill
This study evaluates the effects of both short inter-hole and intra-hole delay times on rock fragmentation and throw. Full-scale test blasts were analyzed at a granite quarry in Talbotton, GA. This an
Jan 1, 2017
-
Drilling and Blasting OptimizationBy Jorge Flores, Benjamin Cebrian
Blast Optimization at a high altitude mine operation involves not only the selection of the right drilling designs and explosives but also the circumstances of operators working at low oxygen levels a
Jan 1, 2015
-
Blasting Next to an Unsupported Road using Electronic DetonatorsBy Tony Rorke, Sydney Thabethe
A large overburden blast was carried out at Douglas Colliery, Middelburg Mine Services, close to a national road in South Africa. The road is a busy route between Witbank and Bethal and damage to the
Jan 1, 2004
-
Pneumatic Stemming of Horizontal Holes with Particulate MaterialBy Clay McNail, Paul N. Worsey, John Schillie
"This paper is the result of undergraduate student research over the period of 2 semesters at UMR, which was focussed on developing a practical way to pneumatically stem horizontal boreholes, mostcomm
Jan 1, 1999
-
Impact of Open-pit Blasting on the Stability of Adjoining Multiseam Workings of Underground Coal MineBy Ajoy Singh
A study was conducted to investigate the damage potential to underground multi-seam openings caused due to vibration generated by open-pit coal mine blasting. The objective was to recommend optimal ex
Jan 1, 2012
-
Implementation of an Integrated Quality Assurance and Control System Applied to High Complexity Blasting Open PitBy Regina Rocha, Miguel Humpire
One of the challenges within unitary mining operations is blasting, which has a significant downstream impact on the following processes, which is why mining companies ensure the results of the blasti
Feb 6, 2023