Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Demolition by Controlled Blasting of a Building in Cadiz (Spain)

    In this work, is being described the developing of the study for the demolition by controlled blasting project of a building of reinforced concrete, in the center of a spanish city. Synthetically, it

    Jan 1, 1977

  • ISEE
    Sealine Trenching with Explosive Technology

    By John J. Ridgeway

    Habits take us where we were yesterday and attitudes tend to keep us there. Until recently, little had been accomplished to improve conventional explosive energy for use offshore. But with the special

    Jan 1, 1977

  • ISEE
    Emperical Characterization of Oil Shale Fragmentation Experiments

    By P Wapner, C Lo Edwards, S CO Schmidt, J N. Johnson, R Oliver

    Shale oil recovery rates that can be achieved in underground in situ retorts can be strongly influenced by the shale breakage and fragment-size distribution achieved during rubblization. Since the fra

    Jan 1, 1979

  • ISEE
    Regional Observations of Mining Blasts by the GSETT-3 Seismic Monitoring System

    By Brian W. Stump

    The cessation of testing of any nuclear explosive devices in all environments is the goal of the Comprehensive Test Ban Treaty. In order to assure compliance with such a treaty, an international monit

    Jan 1, 1997

  • ISEE
    The Desensitization and Malfunction of Coal-Mine Explosives

    By Michael S. Wieland

    Underground coal-mine explosives (permissibles) can be substantially degraded by the underground stress waves from the explosion of neighboring borehole charges. This cross-borehole interaction genera

    Jan 1, 1987

  • ISEE
    Full-Face Blast Rounds in Shaft Sinking with Electronic Delay Detonators - a Critical Appraisal

    By B Mohanty

    Full-face blasting rounds have been used to excavate a 4.6-mdiameter shaft at Atomic Energy of Canada Limited's Underground Research Laboratory near Pinawa, Manitoba. Both standard pyrotechnic delay d

    Jan 1, 1990

  • ISEE
    Reduction of Vibration in a Low Frequency Zone at Construtora Sultepa EV Quarry

    By D. C. Valdemeri, Oppermann J. P. Z., R. G. Schaarschmidt, C. S. Mendonca

    This case study was conducted in an aggregate company, located at Estância Velha town, RS, Brazil. The study was based on the results of vibration monitoring mainly in terms of PPV (peak particle velo

    Jan 1, 2015

  • ISEE
    Charleroi Locks and Dam - Old River Wall Explosive Demolition - Final Stage - Phase 2

    By David Harrison, Brian Harrison

    The Army Corps of Engineers completed the Charleroi Lock and Dam in 1932. It is located on the Monongahela river approximately 22 miles (35k) south of Pittsburgh in Charleroi, Pennsylvania. It is comp

    Jan 1, 2018

  • ISEE
    Diagnostics of Production Blasts in a Deep Underground Mine

    By F. Malek

    An extensive blast monitoring program has been carried out to study explosive performance and the effectiveness of blast designs in production blasts in a deep underground mine. Comprehensive monitori

    Jan 1, 2013

  • ISEE
    An Investigation on Cracking of Glasspanes Due to Air Overpressure

    By Bharat B. Dhar, M D. Nabinllah, A J. Prakash

    The study is an approach made in simulating air overpressures induced by surface blasting from those produced during gallery blasting in the laboratory, and experiments conducted on a portable window

    Jan 1, 1994

  • ISEE
    Vibration and Air Blast Levels of Natural Phenomena and Normal Activities Compared to Levels of Blasting

    By Judy Konya Bowles, Calvin J. Konya

    Blast vibration and air blast are commonly blamed for damages to residential as well as commercial structures. Mining and construction companies are often required to spend monies in court defending t

    Jan 1, 1992

  • ISEE
    Application of Lightning Detection and Warning Systems within the Explosives and Blasting Environment

    By William C. Geitz, Dan Fitzgibbon

    Lightning has always posed a serious threat to blasting operations, especially within the mining and construction industries. In recent years, technological advancements in communications systems and

    Jan 1, 1991

  • ISEE
    Computer-Aided Blast Fragmentation Prediction

    By G E. Exedaktylos, Y Zhou

    The complex and non-linear nature of blast fracturing has restricted common bract design primarily to empirical approaches. The code developed for this investigation simulates the pattern of interacti

    Jan 1, 1989

  • ISEE
    Environmental Effects of Blasting Operations in Subfluvial Strata

    By Zoltan Susanszky

    This paper discusses problems encountered when blasting under rivers for pipeline crossings. Many pipelines have recently been laid under the Danube River. Great care had to be taken to determine limi

    Jan 1, 1977

  • ISEE
    Open Pit Blasting in India

    By D D. Garg, D A. Wasson

    Open pit blasting in India uses two types of explosives. First there are bulk explosives for wet and dry holes, and there are packaged explosives. The Indian open pit coal mining is projected to use 1

    Jan 1, 1995

  • ISEE
    Multiple Raise Round Blasting Technique

    By Dave I. McGregor

    The Multiple Raise Round Blasting Technique (MRRBT) is a safe, efficient, cost effective method of blasting thee will use existing mine personnel. The MRRBT, developed from the conventional 'drop rais

    Jan 1, 1994

  • ISEE
    A Decade of Blasting at Martin Marietta Cement

    By J T. Keim

    Members and guests of the Society of Explosive Engineers, it's indeed a pleasure for a longtime practical user such as myself to have the ears of so many explosive experts for a few minutes just to ex

    Jan 1, 1978

  • ISEE
    Priming Procedures Employed at the Tallya Quarry

    By Janos Foldesi, Calvin J. Konya

    The determination of the number of primers necessary to efficiently initiate an explosive column charge is essential to good blasting. If the number of primer is insufficient, the total energy stored

    Jan 1, 1976

  • ISEE
    Evaluation of Propagation Sensitivity of Commercial Explosives in Large Diameter Holes

    By RR Vandebeek, A W. Bauer

    The Canadian Explosives Research Laboratory regularly evaluates the properties of commercial explosives for authorization under the Canada Explosives Act. Propagation sensitivity is normally measured

    Jan 1, 1987

  • ISEE
    Specialized Blend and Delivery Equipment Optimize Emulsion/ANFO Applications

    By Thomas F. Mechtenberg, Michael S. Powell

    In the past several years many coal operators and stone producers have reduced drilling and blasting cost by utilizing Bulk Emulsion/ANFO blends. For many operators the cost of equipment to handle ble

    Jan 1, 1990