Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - SummaryBy William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;By Robert A. Field
Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t
Jan 1, 1997
-
Problems Of Cast In Situ Driven Piles Added To Existing Piles And Built Near A Standing StructureBy L. F. Albert
The paper describes solutions given to foundation problems during the reconstruction of a power plant set on fire, located adjacent to several still Working Units. After a detailed site and laboratory
Jan 1, 1989
-
Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, IndiaBy Deepak B. Deshpande
This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site
Jan 1, 2002
-
Design-Build of Watertight Underground Structures for Tunneling in Miami, Florida - The Norris Cut Utility Relocation ProjectBy Eugene Mirsky, Eloy Ramos, May ElKhattab, John Wise, Terrence Carroll, Jose Torres
In 2017, Nicholson Construction Company completed a $72.1 million design-build contract for Miami Dade Water and Sewer Department to replace an existing 54-inch diameter pre-stressed concrete force ma
Jan 1, 2018
-
Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? IntroductionBy Brian R. Zuckerman
The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State
Jan 1, 2002
-
Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:By Robert W. Bergwall
The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T
Jan 1, 1997
-
The Analysis Of FEM On The Anchorage Consolidation For Stabilizing A Tunnel With Thick Overburden ? SynopsisBy J. M. Pei
In this paper, the nonlinear finite element analysis is used to study the support system of a tunnel which is designed to pass through deep-embeded stratum. The rock mass is rather intact, though a se
Jan 1, 2010
-
Biodegradable Hydraulic Fluid in the Deep Foundation Industry - SynopsisBy S. H. Miller
Biodegradable hydraulic fluids can save tens or hundreds of thousands of dollars in fines and clean up costs in the event of a hydraulic fluid leak or spill. When properly selected, applied, maintaine
Jan 1, 2000
-
Establishement Of Bearing Capacity And Integrity Of Cast-In-Place Piles By Means Of Dynamic Pile Tests ? SynopsisBy H. Meseck
Dynamic pile test methods to establish the bearing capacity of driven piles were developed in the USA more than 20 years ago. In the Federal Republic of Germany, the first dynamic pile tests were carr
Jan 1, 2010
-
Ground Support for Shafts and Underground Construction Using Artificial Ground Freezing – Sophia Spoortunnel Rotterdam (Nl) – Cern Geneva (CH) – Leipzig (DE) – Berlin (DE)By Helmut Hass, Marco Ziller
"Abstract: 1 Sophia Spoortunnel Marco Ziller, Trevi S.p.A.:For the construction of 14 cross passages connecting the twin tunnels of the Sophiaspoortunnel the Artificial Ground Freezing technique was a
Jan 1, 2014
-
Recent Advances In Large Diameter Diaphragm Wall ShaftsBy Benoit Virollet
Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr
Jan 1, 2006
-
Foundation Base Material Strength Assessment for Drilled Pipe Piles using Force and Displacement DataBy Patrick J. Hannigan, Geir Veslegard, Frank Rausche, Rozbeh B. Moghaddam
A common type of deep foundation used in Norway to support bridge structures is the drilled pipe piles (piles) filled with concrete reinforcement after installation. The standard installation practice
Jan 1, 2018
-
Deep Soil Mixing for Contaminated Soil Remediation at a Superfund SiteBy Larry Stearns, Lori Tiefenthaler
Remediation of contaminated soil represents a significant market for application of Deep Soil Mixing (DSM). Eighty-one percent of U.S. Environmental Protection Agency (EPA) Superfund Program’s site re
Jan 1, 2018
-
Monitoring And Quality Control Of A 100 Metre Deep Diaphragm WallBy D. A. Bruce
To check the feasibility and the quality of a very deep diaphragm wall, a tern of adjacent panels has been constructed, up to a depth of 100 m, in the Milan sandy gravelly soil by means of a hydraulic
Jan 1, 1989
-
Slurry Walls In Building Construction - Urban ConditionsBy Louis Donolo
New buildings in today's urban environment, especially in down-town areas, invariably involve the construction of multiple level basements. Used for parking, storage and commercial space, these u
Jan 1, 1987
-
The Effects Of System Components On The Deflection Of MSE Retaining WallsBy Scott C. Vollmer
This paper seeks to examine some of the technical factors influencing the deflection of Mechanically Stabilized Earth (MSE) retaining walls based on the authors' field observation of numerous str
Jan 1, 2003
-
Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load TestingBy Tatsunori Matsumoto
In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were
Jan 1, 2006
-
Careful And Controlled Underpinning Methods In Restoration Of Damaged Houses In The Old Town Of StockholmBy T. Iwanowski
Stress wave measurements and calculations are often used to make a safe determination of the bearing capacity and the integrity of driven piles. Some applications to the restoration of old buildings i
Jan 1, 1991
-
Experiences With Heavy Drop Hammer Testing Of Rock-Socketed ShaftsBy Frank Rausche
Since the early 1980s, when the Road Construction Authority of Victoria authorized the dynamic proof testing of roughly 100 drilled shafts of 1.5 m diameter and typically 60 m length in Melbourne Aust
Jan 1, 2006