Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Economic Optimisation of Pb-Zn Concentrates By Regrinding and Cyanidation of Silver from Zinc Concentrate

    By Carlos Avalos Casillas, Saul Ortiz Landeros

    The current work shows metallurgical results obtained at the Centro de Investigación y Desarrollo Tecnológico (Peñoles CIDT), as a continuation of the work first published in February 2012. With the a

    Jan 1, 2014

  • CIM
    Modified Stability Graph Method with a new Rock Stress Factor

    The Stability Graph Method is widely used in Canadian underground hard rock mines for open stope support design and is frequently used in the mine planning phase to assess the viability of stope geome

    May 1, 2011

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Unique Ceramec® Filter Technology Has Opened New Doors to Cost-Effective Dewatering

    By Bjarne Ekberg

    "The most economical way of dewatering mineral concentrates is to reduce the moisture content in the material mechanically using thickeners and filtration avoiding thermal drying whenever possible. In

    Jan 1, 2003

  • CIM
    Detection of Kaiser Effect in Marbles Under Tensile Stresses

    By Xie Qiang

    It is known that the stress state inside rock discs under Brazilian tests is neither simple compression nor tension, but a complex combination of both stress types, as well as for a beam subjected to

    May 1, 2009

  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • CIM
    Pump and Cyclone Design/Optimization to Maximize Grinding Circuit Efficiency: A Systematic Method

    By Robert E. McIvor

    "The design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit pe

    Jan 1, 2011

  • CIM
    The Management of the Development Process of the Structure of Large-Scale Production and Transportation Systems

    By Buse Florian

    This paper presents the specific features of the large-scale production and transportation systems (LSPTS), describing the main notions and characteristics of the LSPTS elements. A methodologically un

    Oct 1, 2009

  • CIM
    The Effect of Particle Production History on Gold Leaching

    By Jessica Egan, Daniel Hodouin, Claude Bazin

    "The recovery of gold by leaching is influenced by the size of the gold carrier particles and the chemical environment. Using the relationships between the leaching rate, infinite recovery and particl

    Jan 1, 2009

  • CIM
    Technological Advances in Telecommunications for Mines

    By Patrick M. Y. Waye

    As mines utilise more automation in mining operations to improve efficiency and safety, a corresponding increasing demand is placed on the transport of information. Some of the recent technological ad

    May 1, 2001

  • CIM
    From Tribulation to Triumph – Flotation Improvements at the New Lac des Iles Concentrator

    By Tom Olsen, Tom Ohrling, Peter Taggart, Chris Martin

    "North American Palladium commissioned the new concentrator at the Lac des Iles mine in the summer of 2001. The 15,000 tonnes per day mill replaced the existing 2,400 tonnes per day facility, as part

    Jan 1, 2003

  • CIM
    A Simple Method to Estimate Tensile Strength and Hoek-Brown Strength Parameter mi of Brittle Rocks

    By M. Cai

    A practical simple method is proposed to estimate the tensile strength (st) of strong brittle rocks from the strength ratio of R= sc/st = 8 sc/sci, where sc is the uniaxial compressive strength and sc

    May 1, 2009

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    Monitoring whole body vibration effects on ultra-class haulers

    By V. D. del Valle, T. G. Joseph, J. J. Berezan

    Aggressive driving patterns, rough and poorly maintained roads and pit floors, along with the occasional bump and poorly placed load from a shovel can create intense and sometimes serious vibration le

    Jan 1, 2004

  • CIM
    Stress Measurements at Great Depth at Craig-Onaping Mines, Sudbury Canada

    Reliable estimation of in situ stress is a major step in the analysis and design of underground excavations in rock, particularly for evaluating the stability of underground structures to prevent fail

    May 1, 2009

  • CIM
    The Design of Instruction to Introduce a New Technology: A Case Study in Canadian Mineral Processing

    By H. D. Stolovitch, M. L. Lavallée

    "An engineering system used to analyze and improve the performance of industrial grinding circuits has been adapted into a training program. The systematic approach to the design of training was appli

    Jan 1, 1992

  • CIM
    Rubber Lining of Autogenous Mills at Sherman Mine

    By R. W. Watson, H. D. Peer

    "This paper outlines the history of steel linings in the Autogenous Mills, the factors influencing the decision to convert to rubber lining, and the operating and cost experience with the rubber liner

    Jan 1, 1981

  • CIM
    Concepts for Co-Mixing Waste Rock and Tailings

    Conventional waste management practices produce two waste streams for the construction of separate disposal facilities. The design of tailings impoundments is usually controlled by physical stability.

    Nov 1, 2002

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010