    A Conceptual Approach to Discovering Knowledge from Construction Workflows

    By A. J. Antony Chettupuzha

    Electronic Product and Process Management [EPPM] systems provide the capability to establish and map information flow between different parties in a construction project as well as model project proce

    Aug 1, 2013

  • CIM
    Stamp-Milling and Amalgamation Practice at Goldenville, N.S. (fb013ab7-b931-4c07-a28c-bfdc18236a53)

    By E. H. Henderson

    MR. R. V. NEILY stated that he had at one time operated at Goldenville. The practice and results are much the same now as in the olden days. Inside plates were then found to be a source of trouble and

    Jan 1, 1935

  • CIM
    Managing Technical Drilling in the Resource Exploration Program

    By Ben Cottrell

    In this paper technical drilling is referred to as the process of collecting engineering and metallurgical parameters for subsequent mine design considerations. Throughout the development of a mineral

    Aug 1, 2013

  • CIM
    Automated Measuring and Tracking the Deformations of Concentrically Braced Frames

    Deformation is a critical indicator required to evaluate the structural safety, stability, and integrity. For example, the deformed shape of a building structure is a key parameter that needs to be me

    Aug 1, 2013

  • CIM
    The Navachab Optimisation History; Exceeding SAG Performance Benchmarks (f5436527-39a2-4fcf-bc24-e97b0f996808)

    By H. Wilhelm, W. I. van Drunick

    The Anglogold Ashanti (AGA) Navachab single stage SAG mill has provided an excellent setting for incremental optimization. Over the past decades, several interventions have resulted in marked improvem

    Jan 1, 2012

  • CIM
    EKATI? Diamond Mine ? Canada?s First

    By William C. Boggis

    EKATI? Diamond mine is located 300km northwest of Yellowknife and 200 km south of the Arctic Circle in the Northwest Territories of Canada. The site is a remote tundra area with continuous permafrost

    May 1, 2001

  • CIM
    The Factors Impacting Time and Cost of Flowsheet Development

    By M. Hawker, M. Kreuh

    The mining and metallurgy industry is known to be of cyclical nature associated with price volatility. As such, some years are quite lucrative and other years require mining companies to tighten their

    Jan 1, 2014

  • CIM
    Electrochemical Formation of RE-Ni (RE= Nd, Dy, Pr) Alloys in Molten Salts

    By R. Hagiwara, S. Kobayashi, K. Yasuda, T. Nohira, K. Kondo

    To establish a process for the electrochemical recovery of rare earth elements from used magnet scraps, the electrochemical formation of RE-Ni alloys in molten NaCl-KCl-RECl3 salt at 973 K was investi

    Jan 1, 2014

  • CIM
    The beneficiation of Canadian refractory silicate minerals - kyanite, sillimanite and andalusite

    By P. R. A. Andrews

    "The sillimanite group minerals, kyanite, sillimanite and andalusite are identified as alumino-silicate minerals with the common chemical composition AIP3.Si02' so that each possesses similar phy

    Jan 1, 1995

  • CIM
    Remarks on First-Aid and Mine-Rescue

    By G. W. Brooks

    This short article is quite different to the general run of papers that are presented to the Institute, but no apology is offered because I consider that first-aid and mine-rescue work are of equal im

    Jan 1, 1925

  • CIM
    Selective Metal Recovery to Offset Cost of Arsenic Removal with Sulphide Precipitation

    By Farzad Mohammadi, Patrick Littlejohn, David Sanguinetti

    Arsenic levels in metal concentrates are increasing as mining companies turn to developing low grade and complex ores. When arsenic bearing minerals are smelted, arsenic deports as gases which must be

    Jan 1, 2014

  • CIM
    The Continuous Automatic Cyanide Titrator

    By J. C. Ingles

    "A survey of possible methods for controlling cyanide concentration indicated that the simplest method would involve the use of a potentiometric technique. Such a method was suggested by a paper from

    Jan 1, 1965

  • CIM
    Energy Conservation through Liquid Oxygen Addition to the Dome Mill Leach Circuit

    "The Dome Mine, located in South Porcupine Ont. has been in operation since 1910 and is owned and operated by Placer Dome Inc. The current milling facilities were constructed in two phases with the fi

    Jan 1, 1993

  • CIM
    Field Instrumentation Studies in Cemented Paste Backfill

    By Murray W. Grabinsky

    The in situ performance of Cemented Paste Backfill (CPB) systems can be monitored to improve understanding of the paste?s behaviour and therefore optimize the geomechanical design of the cemented past

    May 1, 2008

  • CIM
    Monitoring Thickener Operation Using a Conductivity Probe

    By A. Probst, N. Moores, J. A. Finch

    "In 1994 McGill and INCO (Sudbury operation) initiated transfer of technology originally developed to detect level in flotation columns to thickeners. A conductivity probe was installed in a concentra

    Jan 1, 1998

  • CIM
    The Oxygen Meter at MacLeod Cockshutt Gold Mines Ltd.

    By W. A. Grell

    "The oxygen meter has been in use at MacLeod Cockshutt Gold Mines for over a year, At MacLeod about 200 tons per day of reground concentrate containing roughly 10% pyrrhotite and 20% pyrite is cyanide

    Jan 1, 1964

  • CIM
    The use of Multispectral Remote Sensing to Map Reclaimed Areas at Highland Valley Copper

    By Mark Richards

    Highland Valley Copper is a large, open-pit copper mine in the southern interior of British Columbia. Reclamation has been in progress on the site since 1987. Some 6,300 hectares will have been distur

    May 1, 2003

  • CIM
    Cadia Expansion – From Open Pit to Block Cave and Beyond (4a1cbd75-8ba9-4485-8c66-2de027979f5e)

    The Cadia mine is shifting from the open pit operation to the Cadia East underground block cave. The resulting increase in milled tonnes and the decrease in fines production through shifting to block

    Jan 1, 2012

  • CIM
    Integrated Advanced Grinding Control System at Newmont Ahafo (4ebdb86b-3410-4a78-94cd-dbe1c9ed39a6)

    By O. Guyot, A. Broussaud, M. Revalor, G. Legrand, D. Kok, E. Roux

    "The paper describes the advanced grinding control system implemented at Newmont Ahafo gold mine, Ghana in 2009 and 2010. It shows how the different components of the Advanced Process Control (APC) sy

    Jan 1, 2012

  • CIM
    Maximizing Performance of FRP Equipment in Copper Extraction

    By Jeffrey D. Eisenman

    FRP is a proven material for the solvent extraction processes of copper production. There is a history of successful applications of FRP piping and equipment in hydrometallurgical processing. The perf

    Jan 1, 2019