Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Metasomatic Norms and Mass Balance Chemico-mineralogic Models of HydrothermalAlteration SystemsBy Xiaolin Cheng, A. J. Sinclair
"Norm calculation procedures originally designed principally for igneous rocks are very rigid in their application and, in general, do not utilize important alteration minerals. For instance, volatile
Jan 1, 1995
-
Metasomatic Norms and Mass Balance Chemico-mineralogic Models of Hydrothermal Alteration SystemsBy Xiaolin Cheng, A. J. Sinclair
"Abstract - Norm calculation procedures originally designed principally for igneous rocks are very rigid in their application and, in general, do not utilize important alteration minerals. For instanc
Jan 1, 1995
-
Study on Acoustic Wave Propagation in Fractured Rock Mass under High In-Situ Stress of Model Test and Damage Constitutive Relation (da00ca07-9cc1-45ad-9211-b9f1f4c94af2)By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo
The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under hi
Jan 1, 2015
-
Improving Ore Quality in Mine to Mill Using Through-Conveyor Real Time Elemental AnalysisApplications of proven real time, through-conveyor elemental analysis technology and benefits achieved will be discussed using case studies in base metals, iron ore and phosphate operations. PGNAA (Pr
Jan 1, 2016
-
Training Operators ? A Diligent ResponsibilityAccountability for profit realized or lost, and responsibility for continued safe operation are the main impetus behind operator training. Efficiency in operation enables production at lower unit cost
Feb 1, 2008
-
Study of Flotation Process Variables Combining Metallurgical and Pentlandite Liberation DataBy G. Heinrich
Size by size recoveries and pentlandite liberation data from image analysis were used to evaluate plant tests of pentlandite flotation and pentlandite/pyrrhotite middlings flotation from pyrrhotite in
Jan 1, 1993
-
Current Mg Production Technologies, Where Should They Head?By R. Harris
The vacuum thermal route for magnesium production today accounts for roughly 80% of the global production of magnesium despite significant investment in the competing electrolytic technologies, This i
Jan 1, 2006
-
Hard Gold AlloysBy Rainer Süss
An investigation was carried out by Mintek to investigate the influence of a range of alloying additions (vanadium, cobalt, zirconium, antimony and germanium) on the formability and hardenability of a
Oct 1, 2003
-
The Contribution of the Classifiers to Comminution and Separation Processes in Mineral Processing"Classification is an important aspect of mineral processing plants and if not operated efficiently can compromise both the throughput and recovery of the circuit. This paper discusses the benefits th
Jan 1, 2016
-
Quantitative Estimation of Dilution and Ore Loss Resulting from Block Estimation Errors and a Specified Cut-off GradeBy T. A. Postolski, A. J. Sinclair
"Abstract - Where block (selective mining unit) grade distributions can be determined, the effect of average random errors of block grade estimates on metal recovery can be evaluated quantitatively. T
Jan 1, 1998
-
Mine and Tailings Effluent Treatment at the Kimberley, B.C. Operations of Cominco Ltd. (641e0bef-605a-4287-82ae-93ec545560c0)By W. J. Kuit
"Complex facilities which provide for the collection, management and treatment of effluents emanating from the Sullivan mine and concentrator tailings were made operational in October, 1979. Key featu
Jan 1, 1980
-
Pulp-Lifter Flow Modeling Study in a Pilot Scale Mill and Application to Plant Scale Mills (a5b0bae6-30bd-456f-96a6-c4fcba893c43)By Simon Pelletier, Jose Delgadillo, Dave Page, Pramod Kumar, Raj Rajamani, Dilek Alkac, Martin Fillion
"In general, many past works examine mill load, mill power, shell lifter design etc with a view to improving the mill capacity. On the contrary, only a handful of papers have addressed the transport o
Jan 1, 2012
-
Where Are We Going In This Hand Basket?By Lawrence Devon Smith
What is a Failed Project? For mining projects, some key indicators of a ?failed? project are: ? Cost is more than it should be (particularly capital) ? Schedule ? It takes longer to build than exp
May 1, 2010
-
Exploring High Speed Gas Metal Arc Welding of Thin Wall Aluminum ComponentsBy Michel Guillot
Gaz metal arc welding is commonly used for producing large frames and assemblies. Even for light aluminum and thin wall assemblies, the GMAW technique is increasingly preferred over the GTAW technique
Jan 1, 2011
-
Fundamental Study on E-Scrap Recycling Technique Using Alkaline MediumBy A. Kishimoto, Yoshida Honmachi, T. Uda, Y. Taninouchi
Recycling of e-scrap is often performed by utilizing a pyrometallurgical Cu smelting process. Several valuable metals, including precious metals, can be efficiently recovered through the Cu smelting p
Jan 1, 2019
-
Radiometric Profiles of Uranium Dispersal Pattern Adjacent to Cretaceous Phosphatic Sediments in Wadi Qasser Al-Hallabat Basin, Central SyriaBy M. Al-Hilal, G. Rajja, A. Al-Ali, Y. Jubeli
Abstract -A radiometric survey was carried out over clastic sediments in the immediate vicinity of some phosphatic sediments of Cretaceous age in the Wadi Qasser Al-Hallabat basin of central Syria. Th
Jan 1, 1998
-
Evaluation of Crystal Growth Inhibitors to Reduce Encapsulation of Gold in Leach SlurriesBy Rolf Andreas Lauten, Guy Kluck
"Formation of scales may have important detrimental effects in many mineral processing applications. A well-known problem is the need for frequent maintenance to remove scale from processing equipment
Jan 1, 2016
-
Automatic Control of Free Cyanide at Yvan-Vézina PlantBy S. Caron, M. Bourassa, J. Châteauneuf, L. Tardif
"Since many years, the Yvan-Vézina gold plant custom mills and processes different ore types that show different behaviors. Because of this, cyanidation control is more complex than for a typical mill
Jan 1, 1998
-
The Effects of High Antimony in ElectrolyteBy Bradford C. Wesstrom
An overview of the challenges encountered at the Freeport McMoRan El Paso Copper Refinery with higher concentrations of antimony electrolyte will be shared. The observations will cover the detrimental
Jan 1, 2014
-
Long-Term Mine Production Scheduling Optimization and Strategic Planning Under Complex Operational ConstraintsBy Kadri Dagdelen
Recent trends of the mining project show that there will be more and more mechanized, largescale mining operations with complex process options to make low grade deposits economically feasible to deve
Oct 1, 2009