Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Les Mines Selbaie Story Organization of administrative and technical services

    By R. C. Bryce

    "Accident prevention has been an on-going priorty for five years. In 1987, adherence to the ILCI five-star rating loss control program was started, and a first star was awarded. Extensive training pro

    Jan 1, 1990

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    Grade Control and the Life of Mine Plan

    By Mike McKevitt

    We are trying to promote a concept and a change in management?s approach to the iterative process of grade control. This is important as grade control must routinely try and achieve the long term obj

    May 1, 2009

  • CIM
    Materials management at Brenda Mines Ltd.

    By G. Sperlins

    "IntroductionBrenda Mines Ltd. is a low-grade open-pit mining and milling operation located near Peachland, B.C. Brought into production in late 1969, the plant treats an average of 30,000 tons per da

    Jan 1, 1982

  • CIM
    Flin Flon Open Pit

    By M. A. Roche

    The property of the Hudson Bay Mining & Smelting Company, Limited is located at Flin Flon lake, 85 miles northwest of The Pas, Manitoba, on the Manitoba-Saskatchewan boundary. The area is at latitude

    Jan 1, 1933

  • CIM
    A Study on Measuring of Reinforced-Concrete Structure by 3D Laser Scanner and Making Design of Pre-Cut Interior Finishing Components with Polygon Model

    By Kosei Ishida

    To achieve renovation work without noise, the authors developed techniques of manufacturing pre-cut interior finishing components for renovation work. In this paper, to achieve the system of pre-cut

    Aug 1, 2013

  • CIM
    Water-only cyclone circuits

    By D. L. Johnston

    "Function and ApplicationsWater-only cyclones, (WOC) are a dynamic mineral separator which cause minerals to separate in a water medium by virtue of difference in specific gravity. Figure 1 shows diag

    Jan 1, 1989

  • CIM
    Surface stabilization of tailing disposal areas at Wabush Mines, Labrador

    By Edgar L. Horner

    "The objectives of the Wabush Mines tailings stabilization program are to control dust Ii/t-off and to rehabilitate the disposal area. The evolution of the program started with test plots in 1970, the

    Jan 1, 1981

  • CIM
    Making it Work: Canadian Institute of Mines

    Overview of Presentation Why Enter Agreements with First Nations Making it Win-Win ?The Principles The Process Making the Process Work Resource Agmts Defined Resource Agreements are legall

    May 1, 2009

  • CIM
    Casing Integrity of a Typical Pre-Salt Wellbore under Local Salt Dissolution Conditions

    By E. Poiate, P. A. L. P. Firme, D. Roehl, M. A. Carrion, A. M. Costa

    Drilling high-pressure/high-temperature wells in salt rock formations is still a challenge for the energy industry. Creep and solubility is part of the salt rock physical-chemical behaviour, which mus

    Jan 1, 2015

  • CIM
    "Solution Mining" of Sodium Sulphate

    By W. A. MacWilliams, R. G. Reynolds

    "This paper describes, for the first time, a patented method of extracting sodium sulphate from a natural deposit in Western Canada. The method resembles, but is not, strictly speaking, solution minin

    Jan 1, 1973

  • CIM
    Successor corporation rules-an update

    By Robert B. Parsons

    "The February 18, 1987, Federal Budget contains a proposed amendment which would simplify somewhat the ""successor corporation"" rules in the Income Tax Act. Despite this amendment, though, the import

    Jan 1, 1987

  • CIM
    Effects of strontium on the oxidation behavior of aluminum-magnesium alloys

    By Ozdemir. O.

    Magnesium additions to aluminum enhance strength and hardness, lowering density, and improving corrosion resistance. However, during melting and casting processes, significant amounts of magnesium are

    Jan 1, 2004

  • CIM
    Gamma-ray Logging and Radioelement Distribution in the Fort à la Corne Kimberlite Pipe 169

    By B. A. Kjarsgaard, C. J. Mwenifumbo

    "Abstract - Natural gamma-ray measurements were made in the GSC Smeaton drillhole as part of the borehole geophysical classification of kimberlite pipe 169. In addition, forty samples of Cretaceous se

    Jan 1, 1999

  • CIM
    Reducing Titanium Ignition Risk with Overpressure Control in Pressure Oxidation

    By T. Krumins, L. Zunti, R. Frischmuth

    Titanium and titanium alloys are commonly selected for pressure oxidation autoclave vent piping and pressure control valve components, as well as autoclave internals, in high-temperature operations. I

    Jan 1, 2014

  • CIM
    Mineralogical Study of Arsenic-Bearing Species in Copper Roaster Calcines to Aid Process Development

    By J. Oliveira, A. R. Barnes, R. Pandher

    Sub-stoichiometric roasting of arsenic-bearing copper ores is a well established practice. However, ores containing calcium commonly prove challenging where very low arsenic levels are desired, but th

    Jan 1, 2014

  • CIM
    Percolation and Agitation Leaching of an Oxidized Copper Ore

    By D. G. Cerigo, D. M. Bryce, P. H. Jennings

    This paper summarizes the results of an experimental and economic study undertaken to evaluate the feasibility of treating an oxidized orebody of about 10 million tons, grading about 0.75 per cent cop

    Jan 1, 1968

  • CIM
    The testing, design, construction, and implementation of cemented rockfill (CRF) at Polaris

    By Steve Dismuke, Tom Diment

    In December 1994, Polaris decided to investigate the use of cemented rockfill (CRF) to supplement the existing frozen rockfill system. Extraction plans for the remaining ore reserves required a backfi

    Jan 1, 1996

  • CIM
    Mineral Liberation Analysis of Brunswick CuPb Rougher Flotation Streams

    By William Petruk, Donald Leroux, Michael Cooper

    "Brunswick's primary flotation circuit (CuPb) produces a low grade concentrate containing considerable amounts of undesirable sphalerite and pyrite. To determine the cause of the poor selectivity, a s

    Jan 1, 1996

  • CIM
    Hydrodynamic Assessment of Full-Scale Copper Electrowinning Cell

    By W. Yang, R. Rajasingam, K. Mohanarangam

    "Copper Electrowinning (EW) is a complex electrochemical process that involves the production of LME grade copper from copper rich electrolyte. The process involves the deposition of the copper ions o

    Jan 1, 2016