Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Lifter Design Using a DOE Approach with a DEM Charge Motion Model

    By Ian Orford, Peter Radziszewski, Lud Strah

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The AG mill was subsequently converted to SAG operation in May 1999 for a number of reasons. The mill ha

    Jan 1, 2003

  • CIM
    Barrick Goldstrike Grinding Expert System

    By Steve Custer, Tim Kahl, Sue Parker

    "The primary objective of the Barrick Goldstrike expert system is to achieve the desired liberation size for the autoclave circuit while maximizing throughput. In addition, when downstream limitations

    Jan 1, 2001

  • CIM
    Adaptable Inspection Sensor for Unpiggable Pipelines

    By P. Mundell, R. Torbin

    "There are many physical and operational obstacles in pipelines that make the passage of inspection robots impossible including:•,Small radius bends•,Low operating pressure•,Plug valves•,Large changes

    Jan 1, 2005

  • CIM
    Assessing the Performance and Efficiency of Fine Grinding Technologies

    By Jan E. Nesset, Colin Hardie, Peter Radziszewski, Donald P. Leroux

    "The successful introduction of new high intensity stirred milling technologies (e.g. IsaMill, SMDetritor) to the mining industry in recent years prompted Noranda-Falconbridge to initiate a study comp

    Jan 1, 2006

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    Dynamic Modeling and Virtual Prototype Simulation of the GAP-Oil Sands Interactions

    By Samuel Frimpong

    The interaction of oil sands with a ground articulating pipeline (GAP) system has been simulated with the dynamic model established in this work by combining the multi-body and soil dynamics with the

    May 1, 2004

  • CIM
    Wireless Communications in Mineral Processing Applications

    By Peter Metcalfe

    "Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen

    Jan 1, 2014

  • CIM
    Geology of the Ore Fault Ni-Cu Deposit, Bird River Sill Complex, Manitoba

    By P. Walford, C. Mealin, D. Good

    "The geology of the Ore Fault Ni-Cu deposit has been reinterpreted in the light of recent studies of the geology of the Neoarchean Bird River Sill Complex and the occurrence of economic Ni-Cu and Zn-C

    Jan 1, 2009

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    Chemcell Petrochemical Operations at Edmonton

    By J. A. Relf

    The construction of refineries and gas conservation plants in the general Edmonton area in the early 1950's made available large quantities of by-product liquified petroleum gases (LPG). These gases,

    Jan 1, 1962

  • CIM
    Goldcorp’s Penasquito Pyrite Leach Project

    Peñasquito is Mexico's largest gold producer, consisting of two open pits - Peñasco and Chile Colorado - containing gold, silver, lead and zinc. Over the next three years, mining activities in the pit

    Jan 1, 2017

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • CIM
    Drill-to-Mill Increased Mill Throughput at Barrick Goldstrike from Efficient Drilling and Blasting

    By Roy McKinstry, Mark Rantapaa, Thomas Bolles

    "More efficient drilling and blasting techniques have shown measurable improvements in throughput at the Barrick Goldstrike wet grinding mill.A decrease in throughput at the autoclave, due to increasi

    Jan 1, 2004

  • CIM
    Industry Requirements for Introduction of Alternate Energies with Emphasis on Hydrogen Fuel Cells

    By Fred Delabbio

    There are presently several issues that the mining industry is facing, such as underground air quality, deep mining and green house gas emissions, which could be addressed by the application of altern

    May 1, 2007

  • CIM
    Assessing the Total Cost of Representativity in Flotation Plants

    By D. Brand

    "The risk management objective of the AMIRA Code of Practice for Metal Accounting has seldom been systematically investigated in the literature up to the authors’ knowledge. Risk is defined in the Aus

    Jan 1, 2017

  • CIM
    Difficult Mining Conditions in 153 Orebody at a Depth of 4550 ft at Vale Inco?s Coleman Mine

    Vale Inco?s Coleman Mine 153 Orebody is a narrow vein deposit with a dip that varies from 30 to 70 degrees. It has a strike length of 1200-feet and the current mining extends from the 4250 level to 51

    May 1, 2009

  • CIM
    Implementing Best Practices of Metal Accounting at the Strathcona Mill

    By Donald Leroux, Asim Tuzun, Simon Gariépy, Luc Lachance, Hayley Halsall-Whitney

    "The importance of coherent material balance results has long been recognized by mining and metallurgical companies. Although this is still true nowadays, various stakeholders are increasingly concern

    Jan 1, 2012

  • CIM
    A feasibility study on the use of desulphurized tailings to control acid mine drainage

    By D. Bois, P. Poirier, B. Bussière

    Environmental desulphurization is an attractive alternative for the management of acid generating tailings. Bulk sulphide flotation is the most commonly used method to produce desulphurized tailings,

    Jan 1, 2005

  • CIM
    Meadowbank Mine Process Plant Throughput Increase

    By J. Allaire, P. N. Muteb

    The Meadowbank mine is operated by Agnico-Eagle Mines Ltd. and is located in the Kivalliq District of Nunavut in northern Canada. The process plant operates presently at a throughput of 11,500 tpd wit

    Jan 1, 2013

  • CIM
    The Effect of Choke Feeding a Gyratory Crusher on Throughput and Product Size

    By Dave Rose, Jacques McMullen

    "The Detour Lake mine is located 200 km northeast of Timmins, Ontario, Canada.The mill processes a free milling gold ore using both a gravity circuit and leaching with a state-of-the-art carbon-in-pul

    Jan 1, 2017