Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Use of the Attainable Region Method to Optimise a Milling and Leaching Process

    By G. Danha, D. Glasser, D. Hildebrandt, N. Hlabangana

    "In this work, we apply a method known as the attainable region (AR) technique in order to optimize the milling and leaching process of a low grade gold ore. No work on the application of the AR optim

    Jan 1, 2016

  • CIM
    Mine Reclamation in a Changing Regulatory Environment

    By David H. Searle

    This paper will discuss the common trends existing in various Canadian jurisdictions for the closure and reclamation of mines. Included will be a discussion of the requirement to post security as well

    May 1, 2006

  • CIM
    The Wellington Lake Power Project

    By E. M. Stiles

    THE Wellington Lake power plant of the Consolidated Mining and Smelting Company of Canada, Limited, about 25 miles from Goldfields, Saskatchewan, is the second hydro-electric project operating in that

    Jan 1, 1940

  • CIM
    COM 2015 - 54th Dynamics Properties of 320 M3 Air-Forced Mechanical Flotaion Machine

    By Y. Q. Li, Z. C. Shen, C. H. Zhao

    The dynamic properties of the KYF-320 flotation machine which is one of the biggest flotation machines in the world were tested and then verified by the computational fluid dynamics (CFD) simulation.

    Jan 1, 2015

  • CIM
    Modernization of Cominco's zinc plant and lead smelter at Trail, British Columbia (10278aa3-742e-4f4e-9e62-6cedf484fe18)

    By C. A. Sutherland

    "Smelting of copper-gold ore from nearby Rossland mines started at Trail in the 1890s. As ore from the Rossland mines became exhausted, lead smelting of hand-sorted galena ore from other British Colum

    Jan 1, 1988

  • CIM
    Modernization of Cominco's zinc plant and lead smelter at Trail, British Columbia

    By C. A. Sutherland

    "Smelting of copper-gold ore from nearby Rossland mines started at Trail in the 1890s. As ore from the Rossland mines became exhausted, lead smelting offhand-sorted galena orefrom other British Columb

    Jan 1, 1988

  • CIM
    Metallurgical Dust Collection in the Open Hearth and the Sinter Plant

    By A. C. Elliott, A. J. Lafreniere

    THE Hamilton Works of The Steel Company of Canada is a fully integrated steel plant with an annual capacity of three million tons. Located on the south shore of -Hamilton bay, it is in the centre of H

    Jan 1, 1962

  • CIM
    Undercutting at the King Mine of Asbestos Corporation, Limited

    By C. G. Harris, R. Sluyter

    The purpose of an undercut is to undermine a block of ore which will then proceed to cave into draw holes just below the undercut. Undercut-ting is the final and most vital phase in the development of

    Jan 1, 1960

  • CIM
    A New Rheoforming Processing Of Semi-Solid Aluminum Alloys

    By J-L. Tang

    A new rhcoforming processing of Al alloys with component shaping systems apart from slurry preparation systems is experimentally exploited, using the reversible multilevel-speed electromagnetic stirre

    Jan 1, 2007

  • CIM
    Non-isothermal reduction kinetics of EAF dust-based pellets

    By J. Lobel, M. Bourassa, J. A. Kozinski, B. Peng

    Non-isothermal kinetics studies of the reduction phenomenon of electric arc furnace (EAF) dust generated in stainless steelmaking have been carried out. The dust was mixed with carbon as a reducing ag

    Jan 1, 2001

  • CIM
    Investigations of Conveyor Belts Condition in the Institute of Mining Engineering at Wroclaw University of Technology

    By R. Blazej

    Machinery Systems Division (MSD) in the Institute of Mining Engineering at Wroclaw University of Technology specializes in belt conveying systems analyzing, calculating and design. Within the division

    Aug 1, 2013

  • CIM
    World Reserves of Lead and Zinc

    By C. O. Swanson

    "OUR INTEREST in estimates of world reserves of lead and zinc is focussed mainly on the information they give about the sufficiency of metal supplies for the future. However, we soon realize that the

    Jan 1, 1960

  • CIM
    Minto Copper-Gold Project IOCG or What?

    Sherwood?s Minto Project ? High grade copper copper-gold deposit ? Yukon Territory, Canada ? Development underway ? Permitted ? Production by mid mid-2007 ? 40 40-50m lbs Cu plus Au/Ag by by-pr

    May 1, 2006

  • CIM
    Pressure Acid Leaching of Non-Ferrous Smelter Slags for the Recovery of Their Base Metal Values

    By W. Curlook, V. G. Papangelakis, M. Baghalha

    A pressure acid leaching process has been developed for the extraction of metal values, nickel, copper, cobalt and zinc, from base metal smelter slags. The basic concept contemplates cooling the smelt

    Jan 1, 2004

  • CIM
    Geology and exploration history of the gold mineralization in the star lake area, saskatchewan

    By W. L. Murphy

    The Star Lake property, located 115 km northeast of La Ronge, Saskatchewan is underlain by metamorphosed andesitic tuffs and flows which have been intruded by the dioritic to granitic Star Lake Pluton

    Jan 1, 1986

  • CIM
    Government and the Mining Industry

    By Allan F. Lawrence

    "I AM SURE you do not expect from me any learned dissertation on the problems and opportunities of the mining industry. Y our program committee must have recognized my limitations when issuing the inv

    Jan 1, 1968

  • CIM
    Designing New Feed and Discharge End Liners for Dry Ag Mills at the Gol-E-Gohar Iron Ore Concentration Plant

    By S. Banisi, A. Haji-Zadeh, A. R. Hasankhoei, M. Maleki-Moghaddam

    At the concentration plant of the Gol-E-Gohar Iron Ore Company (Iran) three 9m × 2.05m AG (Autogenous) mills (fixed speed) are used in parallel in a dry operation. The test works conducted in a scale

    Jan 1, 2016

  • CIM
    Modification of the Sarcheshmeh Copper Complex Flotation Circuit in Response to a Reduction in Feed Grade

    By S. Banisi, E. Arghavani, A. Akbari, Gh. A. Parsapour, S. Darvish Tafvizi

    The new copper processing plant of the Sarcheshmeh copper complex consists of two parallel circuits. After a primary crushing, the ore is sent to a SAG mill and the product is further ground in a ball

    Jan 1, 2016

  • CIM
    Some Major Structures of the Canadian Shield

    By J. Tuzo Wilson

    Abstract A division of part of the Canadian Shield into provinces believed to represent former mountain belts is attempted, special emphasis- being laid upon radioactive age determinations, the rel

    Jan 1, 1949

  • CIM
    Alkalic intrusion hosted copper-gold mineralization at the Lorraine deposit, north-central British Columbia

    By T. S. Heah, S. T. Bishop

    "The Lorraine property is located in the northern Intermontane Belt, north-central British Columbia. The property is underlain by intrusive rocks of the Duckling Creek Syenite Complex, an Early Jurass

    Jan 1, 1995