Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Slag Cleaning of Outokumpu Direct-to-Blister Flash Smelting Slags

    By J. Tuominen

    Outokumpu Direct-to-Blister Flash Smelting is currently in operation in two smelters, a third one is under construction and a fourth one is in the design phase. The two smelters in operation are the G

    Jan 1, 2007

  • CIM
    Investigating the Influence of Mechanical Anisotropy on the Fracturing Behaviour of Brittle Clay Shales with Application to Deep Geological Repositories

    By Andrea Lisjak Bradley

    Clay shales are currently being assessed as possible host rock formations for the deep geological disposal of radioactive waste. However, one main concern is that the favourable long-term isolation pr

    Jan 1, 2015

  • CIM
    BIM For Facility Management: Design for Maintainability with BIM Tools

    By R. Liu

    As Building Information Modeling (BIM) becomes widely adopted by the construction industry, it holds undeveloped possibilities for supporting Facility Management (FM). Some FM information systems on t

    Aug 1, 2013

  • CIM
    Larger Tonnages, Larger Crushers? (4b90a2d7-e545-4b9a-86f4-a36122e857a0)

    By K. L. Boyd

    "Can the increasing tonnages of ore and waste mined today be accommodated simply by using bigger and better crushers? This paper reviews the latest primary crushing and large cone crusher designs. It

    Jan 1, 2017

  • CIM
    New Construction at Tadanac, British Columbia

    By Unknown

    We are indebted to the Consolidated Mining and Smelting Company of Canada Limited for the several pictures in this issue showing the progress made in new construction at Tadanac and at Bonnington Fall

    Jan 1, 1925

  • CIM
    Optimizing water management at Gregg River Coal Mine

    By G. Beckstead, L. F. Sawatsky, R. Nutbrown, D. Long, G. Gould

    "This paper presents a case study for optimizing water management at Gregg River Coal Mine located near Hinton, Alberta. The optimization study was derived based on a review and assessment of existing

    Jan 1, 1997

  • CIM
    Hot Workability Differences of 7000 Aluminum Alloys With and Without Copper Additions

    By P. Leo

    The Al-Zn-Mg alloys (e.g. 7004, 7020) are employed for land transport and architectural applications whereas the Al-Zn-Mg-Cu alloys (e.g. 7075, 7050) provide the high strength aircraft alloys. The Cu

    Jan 1, 2011

  • CIM
    Factors affecting the conversion of calcium cyanamide to black cyanide

    By R. A. Bergman, C. A. Pickles, J. M. Toguri

    "Black calcium cyanide is utilized mainly as a reagent for gold extraction. It is produced by reacting calcium cyanamide, sodium chloride and calcium carbide at temperatures in the range of 1200°C to

    Jan 1, 2002

  • CIM
    Flotation (ae65e301-8126-448b-9a0d-a71a3c0ab790)

    By P. G. Claridge, G. P. Holmes, M. A. Redfearn

    "IntroductionThe purpose of this chapter is to describe current practices in operation and maintenance of flotation circuits in Canadian mineral processing plants. The chapter consists of five section

    Jan 1, 1989

  • CIM
    Information technology in mining: An overview of the Mining IT User Group

    By M. G. Lipsett

    "The Mining Information Technology User Group considers information to be a strategic enabler to improved business performance in mining. This ad hoc group has been meeting since 2000 to share knowled

    Jan 1, 2003

  • CIM
    A review of dry cover placement on extremely weak, compressible tailings

    By A. T. Jakubick, A. MacG. Robertson

    This paper reviews key issues related to the placement of dry (soil) covers on extremely weak, compressible fine tailings. The design and construction of soil covers on such tailings often presents a

    Jan 1, 2000

  • CIM
    System drivers in the performance of auxiliary ventilation systems

    By I. R. Muirhead, S. Frimpong

    "The mechanization of mining operations in underground coal mines has led to faster cutting rates of coalfaces with increased levels of emission of gaseous and particulate contaminants in the workings

    Jan 1, 2003

  • CIM
    Process Integration and Optimisation of the Boddington Hpgr Circuit

    The current mining operations at Newmont Boddington Gold Mine (NBG) commenced in 2008, and commissioning of the processing plant started in the latter half of 2009. Metso Process Technology and Innova

    Jan 1, 2012

  • CIM
    Data is not the Problem? Good Decisions are the problem.

    Today?s Topics ? Data to decision value chain ? Practical Considerations ? Example ? Before / After DSS ? Quick Decision Support Demo Practical Considerations ? More data is not necessarily bett

    May 1, 2008

  • CIM
    How One Sell-Side Analyst Values Mining Stocks

    By Greg Barnes

    Agenda ? The Mining Stock Life Cycle ? Current Environment ? Valuation ? Golds ? Valuation ? Base Metals ? Case Study ? Quebrada Blanca Hypogene Commodity Investment Cycle ? Macro-Economic Indi

    May 1, 2010

  • CIM
    Gas dispersion measurements in flotation machines

    By J. A. Finch

    "Gas dispersion in flotation defines the efficiency of the process once the chemistry has been established. There are three measurements, superficial gas velocity, gas holdup, and bubble size, which a

    Jan 1, 2002

  • CIM
    Wastewater Treatment at Hudson Bay Mining and Smelting Company Limited, Flin Flon, Manitoba

    By R. V. Typliski, G. J. Labarre

    "Hudson Bay Mining and Smelting Co., Limited, Flin Flon, Manitoba, Canada, has developed a metallurgical wastewater treatment system employing two-stage lime neutralization, sludge recirculation and c

    Jan 1, 1980

  • CIM
    Simulation and Formability of Automotive Aluminum Alloy Sheet and Tube

    By J. T. Chen, S. Winkler, M. J. Worswick, O. Orlov

    This paper presents a review of research conducted at the University of Waterloo concerned with the application of aluminum alloy sheet and tube in automotive structures and body panels. The research

    Jan 1, 2006

  • CIM
    Field experiments of fault activation in shales

    By Y. Guglielmi, C. Gout, P. Henry, P. Dick

    The key questions about fault reactivation in shales concern the potential enhanced fluid displacement through a previously low-permeability aseismic shale formation. Here we selected a critically-str

    Jan 1, 2015

  • CIM
    Structure of the Ferderber gold deposit, Belmoral Mines Ltd., Val d'Or, Quebec

    By L. Vu, V. Popov, J. Beland, R. Darling

    "The Ferderber gold deposit is of Archean age. It consists of a series of gold-bearing quartz lenses within a shear zone that crosscuts the central part of the quartz dioritic Bourlamaque batholith. O

    Jan 1, 1987