Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Leaching Practice at Denison Mines an Historical Review

    By E. LaRocque

    "Denison Mines Limited has been processing uranium ore in the Elliot Lake area since May of 1957. The ore body is located i11 the Huronion sediments on the north limb of the Quirke Lake syncline. Mine

    Jan 1, 1979

  • CIM
    Hoist rope improvements through thermo plastic enhancement

    By Bill Parnell

    "Friction winders and double drum winders have been used in the vertical shaft mining industry for over 100 years. In that time, there have been many changes made in the electronic and mechanical fiel

    Jan 1, 1995

  • CIM
    A Focus on Variability within the Orebody for Improved Design of Flotation Plants

    By Glenn Kosick, Roger Amelunxen, Glenn Dobby

    "The variability in flotation response within an orebody is often a significant problem to address during the design phase of a flotation circuit. In addition, for existing operating plants, the reaso

    Jan 1, 2002

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • CIM
    Gravity Concentration from Bench Scale to Plant

    By R. O. Burt

    "Gravity Concentration, the oldest form of Mineral Processing, remains of major importance to the Industry. Current applications of Gravity Concentration are briefly examined.The Paper details one app

    Jan 1, 1984

  • CIM
    Stratigraphic and Structural Constraints on Limestone Exploration: A Case Study from Northern New Brunswick, Canada

    By I. Dimitrov, S. R. McCutcheon

    "Industrial-grade limestone is found in both the Lower Silurian La Vieille Formation and Upper Silurian LaPlante Formation of the Chaleurs Group in northern New Brunswick. Currently, between 150 000 a

    Jan 1, 2007

  • CIM
    Applications of Engineering Analysis to Improve Tire Management

    By Jie Zhou

    Mining mobile equipment is becoming larger in order to lower operation cost and increase productivity; however, their performance characteristics are often limited by the tire capabilities. Although c

    May 1, 2006

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Iron Sulfide Minerals in Thiosulfate-Gold Leaching: Some Problems and Solutions

    The negative effects of pyrite and pyrrhotite on thiosulfate gold leaching have been investigated. Possible remedies to reduce some problems are discussed. In a gold bearing pure silicate ore, 92% of

    Jan 1, 2005

  • CIM
    Hydraulic Excavator versus Electric Rope Shovel Performance

    By J. Sammut, T. G. Joseph, R. Andreev, M. Curley

    "Decisions regarding mining method and subsequent choice of excavator must take into account the quantitative factors of productivity, availability, and capital, operating, and maintenance costs. Dig

    Jan 1, 2019

  • CIM
    Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine

    By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh

    "The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.

    Jan 1, 1999

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part II Underground Transport and Stope Placement

    By Jamie Archibald

    The Department of Mining Engineering at Queen?s University conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview pote

    May 1, 2009

  • CIM
    Stacking of Potash Mill Tailings (a53a3fa3-c9c5-495d-81ff-6d030f92ec59)

    By P. G. Roden, G. A. Maki, P. J. Fullmann

    "In October 1984, Rocanville Division began using a stacking system to handle potash mill tailings. Previous to this date, mill tailings were slurried to the top of the tailings pile and allowed to de

    Jan 1, 1986

  • CIM
    Sill pillar recovery at the Louvicourt mine

    By D. Fleury

    "This paper describes the challenges of mining a sill pillar under various types of paste backfill quality. From 1994 to 2002, Louvicourt mine produced approximately 12,600,000 t grading 3.5% Cu, 1.5%

    Jan 1, 2005

  • CIM
    The New Red Lake Mine: Narrow Vein Mining in Deep, Burst-Prone Ground

    By Pierre Rocque

    The Red Lake Mine is located approximately 600 km northwest of Thunder Bay. This 545 tpd (600 tons/day) underground narrow vein gold operation is set to produce in excess of 14.8 tonnes (475,000 ounce

    Oct 1, 2001

  • CIM
    Suivi non-destructif de l?évolution de la résistance mécanique des remblais cimentés en pâte: application de la résistivité et de la micro-sismique en laboratoire

    By Serge Ouellet

    Résumé Six modèles métriques de remblai cimenté en pâte (RCP) ont été suivis durant 120 jours par l?utilisation de deux méthodes géophysiques non-destructives : la résistivité et la micro-sismique.

    Feb 1, 2008

  • CIM
    Economical Benefits of Autogenous Grinding

    By Seppo Lähteenmäki, Pertti Koivistoinen, Jaakko Levanaho

    "This paper describes the benefits and disadvantages of fully autogenous grinding when compared to grinding with steel grinding media. The study is a real case study based on a low tonnage, high grade

    Jan 1, 2000

  • CIM
    EKATI Safety Guarantee A Conversation for an Extraordinary Possibility

    By Richard Morland

    Some simple and fundamental objectives To challenge and inspire our people to embrace safety as a value ?A stand for safety as a value ?A stand for our people ?A stand by our people ?Prevent harm

    May 1, 2010

  • CIM
    Sulphur Compounds and Metal removal using Bioprocess Technology

    By Andre L. De Vegt, Cees J. N. Buisman

    "For the past eight years Paques has been engaged in the development and installation of treatment systems based on biotechnological processes to remove sulfur compounds from water, air and gaseous st

    Jan 1, 1997

  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011