Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Measurement of Solids in Coal Slurry Lines with an Impedance Cell Technique

    By Abraham B. K, Jensen B, Gillies A. D S

    The aim of the research was to investigate the feasibility of using an impedance cell and ratio-transformer bridge to measure solids content in coal slurry pipelines. It appeared that this technique

    Jan 1, 1995

  • AUSIMM
    Spoilpile Reclamation Trials at Callide Coal Mine of Thiess Bros.

    By Bell LC

    Overburden removal, mining and reclamation are now accepted as the basic operational steps involved in the winning of coal by open cut methods. To attain the lowest operational cost, the recontour

    Jan 1, 1978

  • AUSIMM
    The Ore Deposits of the South-East Missouri Cobalt-Copper-Lead-Zinc District û Mineralogy, Ore Textures, Applied Mineralogy and Ore Controls

    The south-east Missouri cobalt-copper-lead-zinc district is the worldÆs largest lead producer and a significant producer of by-product zinc, copper, cobalt, silver and cadmium. Current production in t

    Jan 1, 2008

  • AUSIMM
    An Evaluation of Fracture Toughness of Coal Measures Rocks

    By Pathan AG

    This research work is concerned with an investigation of the fracture toughness of sandstone, siltstone, and coal. Tensile failure trades have been examined with three different specimen geonetrie

    Jan 1, 1986

  • AUSIMM
    Design of Roof Support of the Sydney Opera House Underground Parking Station

    By Best R. J, Poulos H. G

    The method for design of primary roof support for the large todoidal cavern constructed to house the Sydney Opera House parking station is presented. The cavern was constructed with 5 m of rock cover

    Jan 1, 1993

  • AUSIMM
    Integrated Approach to Assessing Mine-Related Impacts on the Sustainable Management of Water Resources ù Case Study: Three Mile Creek, Collinsville (Northern Bowen Basin, Queensland)

    By D L. Richardson, B Tiedt, C D. Morgan

    Following residentsÆ concerns that the ongoing operations of Collinsville Coal (CCP) mine may be resulting in the release of contaminants, including products of acid mine drainage (AMD), into downstre

    Jan 1, 2003

  • AUSIMM
    Comminution: Past Developments, Current Innovation and Future Challenges

    Comminution of solids is surely one of the oldest technologies which even in this day and age of DNAs, chips and space exploration continues to challenge our scientific acumen and engineering ingenuit

    Jan 1, 1992

  • AUSIMM
    Discontinuity Analysis in Open Cut Exposures - Examples from Selected Central Victorian Sites

    By Fowler T. J

    Examples are provided of discontinuity analysis at selected sites in central Victoria. Discontinuities are rock fractures of low tensile strength, including bedding, foliations and joints, which are

    Jan 1, 1997

  • AUSIMM
    Short Term Mine Management Systems û An Integrated Approach to Blast Design, Grade Control, Stockpile Management and Reconciliation

    An integrated computer system (the Short Term Mine Management System) has recently been developed by B.H.P. Steel Long Products Division in Whyalla, South Australia for use in their open pit iron ore

    Jan 1, 1990

  • AUSIMM
    Risk Elements Characteristics of Mining Investments

    The exploration and mining risks are investigated and compared to the risks of smelting, secondary processing and other normal industrial activities. This study concentrates on the risk before, or

    Jan 1, 1986

  • AUSIMM
    Ongoing Geological Input into a Mature Mining Operation - Essential Contributions from the Graduate Level

    By I J. Holland

    Located in North West Queensland, XstrataÆs Mount Isa Copper Operations (MICO) is one of the largest underground mines in Australia with annual production exceeding six million tonnes of ore with aver

    Jan 1, 2007

  • AUSIMM
    Extraction of Gold in Hallide Media

    By Davis A, Song J

    A review of the literature indicated that several studies have been reported on the dissolution of gold using iodide/iodine, bromide/bromine leaching systems. Although the reagent costs are much che

    Jan 1, 1992

  • AUSIMM
    Museum Station -Structural and Architectural Design

    By Simpson D, Skopakow J

    This paper is one of the series of papers relating to the Melbourne Underground Rail Loop and specifically describes the structural and architectural design of Museum Station. Structural arrangeme

    Jan 1, 1981

  • AUSIMM
    Some Aspects of Longwall Ventilation in Australian Coal Mining

    By Savidis G

    The characteristics of 'Z' (Back-over run) and 'R' (Reverse) ventilation systems are dis- cussed in relation to their suitability for longwall mining. Experience in European mines

    Jan 1, 1983

  • AUSIMM
    Flow Maldistribution in the Iron Blast Furnace

    By Propser M, Szekely J

    Flow maldistribution in the iron blast furnace has been studied analytically by the use of the vectorial form of the Ergun equation and experimentally via packed columns and a cold model of a blast f

    Jan 1, 1975

  • AUSIMM
    Cross Wellacoustic Tomography to Locate Abandoned Underground Mines and Subsidence Failure

    The U.S. Bureau of Mines has developed a prototype cross well acoustic logging system and complementary tomogr`aphic image reconstruction software for the detection and delineation of abandoned und

    Jan 1, 1992

  • AUSIMM
    Using Millimetre Wave Radar to Monitor In-Stope Backfilling at Olympic Dam Mine, South Australia

    By S Youds

    The backfilling operation at Olympic Dam mine supports a 9.8 Mtpa underground Long Hole Open Stoping (LHOS) operation. It involves a combination of Cemented Aggregate Fill (CAF), surface rockfill and

    Jan 1, 2002

  • AUSIMM
    Design of the Melbourne City Link Tunnels

    By S Porter, R Woodall, N Weeks

    Nelsen, Porter and Wilson (1996) provided some preliminary concepts for the design of the Melbourne City Link tunnels. At that time, the City Link project was in the early design phase whereas now it

    Jan 1, 1999

  • AUSIMM
    Pressure filtered tailings – environmental and cost benefits

    By R Williams, P Godwin

    In a time of changing rainfall patterns and in the light of recent tailings dam failures, there is closer environmental scrutiny for proposed tailings dam construction or expansion. Therefore the elim

    Sep 11, 2017

  • AUSIMM
    Regional Geotechnical Studies as an Aid to Surface Mine Planning - A Case Study from the Bowen Basin, Queensland, Australia

    By Grimstone LR, Leach JHJ

    An analytical technique is described to identify areas of structural disturbance to coal and interseam strata in coal measures. It is based on exploration borehole data which records seam intersec

    Jan 1, 1986