Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Design, Installation and Commissioning of the Northparkes MinesÆ Lift 2 Ground Handling System

    By I Ross

    The ground handling system needed for the second lift of the underground block caving operation at Northparkes Mines had to link into the existing infrastructure. Production requirements indicated tha

    Jan 1, 2005

  • AUSIMM
    Application of Geostatistics to the Analysis of Seismic Data

    By Just G. D

    The results of a geostatistical analysis of geochemical data obtained from field measurements are described in the paper. Q values derived from seismic signal rise times for different travel paths in

    Jan 1, 1988

  • AUSIMM
    Applications of Downhole Electromagnetics in Extensional Exploration in the Nickel Mines of Kambalda

    Kamhalda is located within the Yilgarn Craton of Western Australia, specifically in the Norseman - Wiluna greenstone belt. Numerous nickel sulphide deposits have been mined at Kambalda with I I mine

    Jan 1, 1997

  • AUSIMM
    Tarnagulla Gold Mine

    By L Faulkner

    The Tarnagulla Gold Project in Central Victoria, Australia, was developed and operated by Reef Mining NL between 1994 and early 2000, producing 53 000 ounces of gold from the Nick OÆTime Shoot, a sing

    Jan 1, 2008

  • AUSIMM
    Partial Automation of a Dragline Working in Conjunction with a Hopper/Crusher/Conveyor Overburden Removal System

    By Susanto A

    As part of the current NERDDC funded project studying Dragline/Hopper/ Crusher/Conveyor systems for overburden removal, an investigation was carried out to assess the feasibility of automating the

    Jan 1, 1989

  • AUSIMM
    Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise Mine

    By G MacSporran, I Sheppard

    The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o

    Jan 1, 2003

  • AUSIMM
    The Application of Physical Modelling Techniques to Problems in Tunnelling

    By Enever J, Walton R, Wold M

    Photoelastic and equivalent material model ling techniques for studying stresses and defor- mations and modes of failure in geological and engineering structures are described. The appli- cation of t

    Jan 1, 1976

  • AUSIMM
    Burden Movement Experiments Using the Hybrid Stress Blasting Model (HSBM)

    By G Chitombo, M Ruest

    In surface mining, studies of the kinematics of blasted rocks using high speed film/video image analysis have allowed the estimation of the starting time, direction and magnitude of visible movement o

    Jan 1, 2007

  • AUSIMM
    Improvements in Process Control and Instrumentation at Batu Hijau

    By B Dunstan, F Wirfiyata

    PT Newmont Nusa Tenggara (PTNNT) operates the Batu Hijau copper and gold mine and process plant on the island of Sumbawa, Nusa Tenggara (Barat)  NTB, Indonesia. The plant consists of a nominal ca

    Jan 1, 2009

  • AUSIMM
    Coal - Paper No. 8 Use Of Optimal Techniques To Minimise Moisture Retension In Fine Coal Filtration

    By Sergeant G. D, Norman J. R

    The importance of reducing the moisture content of fine coal, the nature of the retained water and the means of its removal are discussed. A statistical technique, using a balanced block design, was

    Jan 1, 1969

  • AUSIMM
    Aspects Of Stimulating Iron Ore Induration

    By Clark K. N

    The need for and advantages of simulators in iron ore pellet induration research are described. The approaches to simulation and the techniques to carry it out are discussed in detail covering dryi

    Jan 1, 1974

  • AUSIMM
    Use of Landform Evolution Models to Assess Uncertainty in Long-term Evolution of Post-mining Landscapes

    By G R. Hancock, J B. C Lowry, T J. Coulthard

    A reconstructed landscape may exert long-term influences on its surrounds and behave in ways that may not be predictable given uncertainties regarding climate, soil and vegetation interactions (Evans,

    Jun 28, 2016

  • AUSIMM
    Development in Elevated Temperature Ground of the 500 Orebody Mount Isa Mines

    By T Davis

    The 500 orebody in the upper levels of Mt Isa Mines in north-west Queensland was mined by sublevel caving and block caving from 1962 to 1969. The hot and reactive rock mass of this orebody provided si

    Jan 1, 2008

  • AUSIMM
    Improving Coal Mining Production Performance Through the Application of Total Production Mangement

    This paper describes the application of the Total Productive Management (TPM) technique as a performance improvement initiative for a coal mining operation. It discusses the objectives of TPM, with th

    Jan 1, 1998

  • AUSIMM
    Principles of Rock Bolting Formation of a Support Medium

    By Hoskings AD

    Bolting forms a prestressed elastic layer of rock which is capable of supporting loads at right angles to the bolted surface. Investigations on rock bolting made with a number of different models g

    Jan 1, 1971

  • AUSIMM
    Computer Simulation to Aid Open Cut Plant Selection

    The paper describes a computer model developed within the State Electricity Commis- sion of Victoria for use in open cut planning. The purpose of the model is to simulate all the typical occurrence

    Jan 1, 1982

  • AUSIMM
    Vibration Control in Construction Blasting

    A resume covering currently accepted views on blasting vibration measurement, human response, and criteria for damage is presented as background information for readers who are not conversant with

    Jan 1, 1976

  • AUSIMM
    Application of Synthetic Rainfall Data to Long-term Modelling of a Rehabilitated Landform

    By G R. Hancock, D Verdon-Kidd, M J. Saynor, J B. C Lowry, T J. Coulthard

    The ability to simulate the stability of post-mining landscapes over time scales ranging from decades to millennia is a critical element in the assessment of closure designs for uranium mines. Landsca

    Jun 28, 2016

  • AUSIMM
    Innovative approaches to dust pollution management in mining operations – a comprehensive image-based identification and evaluation system

    By S F. Wang, J J. Yin

    Dust pollution poses a persistent challenge within mining processes, giving rise to a spectrum of concerns, including occupational diseases, mechanical degradation, diminished visibility, and the pote

    Sep 1, 2024

  • AUSIMM
    A Review of the Coal and Iignite Resources of Western Australia

    By Wilson AC

    Permian coal from Western Australia's only producing coalfield at Collie is the dominant fuel used in generating electricity for the State's interconnected grid. Collie coal is sub-bitum

    Jan 1, 1986