Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Segregating tailings – effects on density and water retention

    By K Seddon

    Segregation of tailings on deposition can occur as a result of a) sub-aqueous deposition, and b) sub-aerial deposition at lower solids concentrations (i.e. when the solids concentration is less than t

    Jul 23, 2018

  • AUSIMM
    Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLAC

    By B Ghahreman‐Nejad, M Munro

    Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an

    Jul 1, 2021

  • AUSIMM
    Experience with Capping of Tailings Storage Facilities for Decommissioning Projects in Australia

    By W Ludlow, C Harrington

    This paper presents an overview of the design and construction challenges to implement capping systems on Tailings Storage Facility’s (TSF) based on recent projects in Australia. Key aspects discussed

    Jul 23, 2018

  • AUSIMM
    A Method for Determination of Strength of Coal Mass

    By Qixiang Y

    The strength of coal mass saturated with gas is an essential parameter in studying the mechanism of gas and coal outburst,and its prediction method. Up to now, there has not been a method for dete

    Jan 1, 1992

  • AUSIMM
    Smoothed Particle Hydrodynamics Modelling of Blast-induced Fracture Processes in Naturally Jointed Rock Medium

    By D Deb, R Pramanik

    This paper presents a generalised methodology in smoothed particle hydrodynamics (SPH) framework to analyse dynamic failure process of rock mass having natural joint under blast-induced stress wave an

    Aug 24, 2015

  • AUSIMM
    Acid Progress for Alumina Extraction

    The CSIRO acid alumina employs the essential steps of digestion, hydrolysis and calcination to produce pure alumina from ores too high in silica or too low in grade for the Bayer process. The two latt

    Jan 1, 1963

  • AUSIMM
    Mineral Resource Classification - It's Time to Shoot the 'Spotted Dog'!

    By P T. Stoker, A Allman, D P. Carville

    Classification of mineral resource estimates is one of the most important responsibilities of the Competent Person. In recent years, classification decisions have been driven more by the detailed bloc

    Jan 1, 2006

  • AUSIMM
    Computational Simulation for Mineral Processing

    By Jancar T, de Guzman M M, Matthews B, Tu J. Y

    The use of computational simulation to predict the performance of existing equipment or for the design of improved mineral processing equipment will be referred to as Computational Mineral Processi

    Jan 1, 1995

  • AUSIMM
    Recovery of Fine Free Gold

    Spiral separators have been used to treat heavy mineralsands in Australia for some 35 years. During the last five years the logical extension of this technology has been torecover cassiterite from all

    Jan 1, 1986

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Coal for Blast Furnace Injection

    By Scaife PH, Cripps Clark J, Cameron DB

    Tuyere coke samples have been taken through the tuyere openings of B.H.P. International Blast Furnaces since 1978 with Whyalla No. 2 Blast Furnace taking samples on a regular basis since 1982. The

    Jan 1, 1987

  • AUSIMM
    The Bunyip Lateritic Nickel-Cobalt Deposit, Cawse Nickel-Cobalt Operations, Kalgoorlie, Western Australia

    By S M. Denn

    The Cawse nickel-cobalt operation is situated 50 km NW of Kalgoorlie in Western Australia, at latitude30o22'30'' south and longitude 121o08'30'' east on the Kalgoorlie 1:

    Jan 1, 2000

  • AUSIMM
    Phreatic uncertainty in the unsaturated zone of tailings storage facilities: an examination of two Australian case studies

    By E J. Coyle, L A. Millington

    Tailings storage facilities are geotechnically complicated structures that develop heterogeneous strength profiles and varied porewater conditions. The monitoring of porewater pressures is one of the

    Jul 1, 2021

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
  • AUSIMM
    The Influence of Resource Rent Taxation on Mining and Investment Strategies (00c54f1a-fdde-4053-a7a6-f1d4319b313e)

    By Stewart Gillies AD

    Resource rent taxes are taxes which only become effective at such a time as a pre-determined rate of return has been achieved by an operation. Resource Rent Taxes have from time to time been consider

    Jan 1, 1995

  • AUSIMM
    Martabe Gold Mine, Indonesia: a positive solution for positive reconciliation

    By M Angus, S Konopa, A Virisheff, S Crispin

    A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther

    Nov 21, 2018

  • AUSIMM
    Pillar Recovery Adjacent to Stabilised Rock Fill at the Ballarat Gold Project

    By D P. Sainsbury, J Western, B L. Sainsbury, V Mutton, P E. Petrie

    Remnant rib pillars at Castlemaine Goldfields Ltd’s Ballarat Gold Project have been sterilised by the placement of loose rock fill in production stopes. The application of selectively injecting low-vi

    Nov 5, 2014

  • AUSIMM
    Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit Mines

    By P Moarefvand, M Osanloo

    The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela

    Sep 26, 2011

  • AUSIMM
    Practical Statistical Tools for Managers

    The correct design and effective operating strategies of metallurgical plants require a constant analysis of data gathered for process control, or for due accountability. Conventional, oldfashion stat

    Jan 1, 2002