Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Operations and Control of 32 Feet Diameter SAG Mills at Ok TediBy Katom M
Each of the two 32 feet diameter Semi Autogeneous Grinding (SAG) mills at Ok Tedi's copper and gold concentrator was treating at best 1500 tph at about 65 per cent mill availability in 1988. Th
Jan 1, 1997
-
Application of Borehole Imagery in Iron Ore - Examples from the Hamersley Group, Western AustraliaThe borehole televiewer is a downhole geophysical logging device that produces continuous, oriented, 360¦ images of the drill hole wall. Two types of borehole images are currently being generated at t
Jan 1, 2007
-
Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine ClosureBy K White, C Ferguson, M Harding
Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif
Jun 28, 2016
-
Managing mining fatality riskBy P Nissen, T Jenke, M Ralph, M Cattani, M Quinlan
The West Australian Government hold an annual ‘Mines Safety Roadshow’ around the State’s regions and the capital city, Perth. Each year presenters provide an update on legislation and safetyrelated th
Apr 16, 2024
-
Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and VariabilityBy S Rogers, D Stead, E Eberhardt
The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus
May 9, 2016
-
Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagementBy C N. Hatton, K Ward
Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con
Jul 1, 2021
-
A Cut-Off of Liberated and Selected Ore Minerals Optimisation Based on the Geometallurgy ConceptBy G Turner-Saad
An improvement to cut-off grade optimisation theory based on geometallurgy has been completed. The improvement fundamentally consisted of taking into account mineralogical and textural characteristics
Sep 5, 2011
-
Can biocements stabilise tailings storage facilities?By G Simpson, S Dressler, A E. Levett
Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings
Aug 2, 2023
-
Issues in Capital Raisings and DisclosureBy B Dodd
This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t
Nov 20, 2012
-
"The Biogeometallurgical Approach – the Information We Need to Increase the Sustainability of Mining"By B Dold
"Mining has still today high potential for improvement in the exploitation efficiency. Especially low-grade ores have very low recoveries. In Cu bioleaching operations from porphyry copper deposits ex
Jun 15, 2016
-
Dynamic influences of optimisation on emissionsBy P J. Bangerter, J Pan
Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such
Aug 2, 2023
-
Flotation control using froth stability: past, present and futureBy C Smith, J Cilliers, K Hadler
Unstable flotation froths, that burst before they overflow, produce no concentrate. Increasing the froth stability to improve recovery is therefore an obvious control strategy. Froth stability can be
Aug 29, 2018
-
Solubility of nitrogen and inclusion characteristics in high aluminium steelsBy M M. Pande, M Ishfaq
The effect of aluminium on nitrogen solubility was investigated by equilibrating melt comprising master alloy of Fe-Al with pure electrolytic iron in a controlled atmosphere (pure argon) at 1873 K. Ni
Jun 19, 2024
-
Waterview Connection – Temporary Works for Tunnel Boring Machine?LaunchingBy D Kubik, K The
The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by
Sep 17, 2014
-
Open Cut Mining Adjacent to Ephemeral Creek and Spring Systems ù Pilbara, Western AustraliaThe Pilbara region, located in the north-west of Western Australia, is significant as the second-largest source of iron ore on the planet. Iron ore mines owned and operated by Pilbara Iron are located
Jan 1, 2006
-
Independent Decline Haulage at Kanowna Belle Gold MinesIn May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w
Jan 1, 2002
-
Bulk Mineable Vein Type and Disseminated Gold Mineralization of the Fairbanes Mining District, AlaskaBy Caivin JS, Freeman CJ
The Fairbanks Mining District in central Alaska was discovered in 1902 and since then approximately 7.5 million troy oz of placer gold, 250,000 troy oz of lode gold, and several thousand short ton
Jan 1, 1987
-
Measuring the influence of a sublevel cave on open stoping at TelferBy J Maxlow, M J. Woods, M P. Sandy
The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel
Nov 29, 2022
-
Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agentsBy F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld
The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches
Jun 19, 2024
-
Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical CapabilityBy G McCullough, B Mutsaers, J Jessop
"*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become
Sep 29, 2013