Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
An Investigation of Disposal Options for Arsenic Trioxide Produced from Roasting OperationsBy Lunt D
Arsenic is classified chemically as a metalloid. That is, it has properties intermediate between those of metals and non-metals. Like non-metals, it combines with many metals to form arsenides (eg
Jan 1, 1991
-
Computer Based Design of Rehabilitated Strip Mine LandformsBy Roe P, Lowell A
This paper outlines software development and design work carried out by Mincom Pty Ltd in collaboration with Capricorn Coal Management (CAPCOAL) for computer based design of rehabilitated strip min
Jan 1, 1991
-
The Formation of the Quartz-Gold-Telluride Veins of the Emperor Mine, FijiBy Walshe JL, Solomon M
The Emperor vein system lies on the eastern margin of the Tavua volcanic structure. This is of Miocene age and occurs in basalts(the Mba Volcanics) probably underlain at about 2 km by calcite-rich
Jan 1, 1987
-
Virtual Hailage Trucks: Improving the Safety of Surface MinesBy Denby B, Hollands R. Schofield D
Surface mines are in operation worldwide, the vast majority employ large haul trucks for the transfer of material both to the outside world and around the site. The sheer size of these trucks and th
Jan 1, 1998
-
Flotation Process Response of Ok Tedi Flourine Bearing MineralsBy Manlapig EV, Mackinnon IDR, Laudr DW
Orebodies at Ok Tedi contain a number of different fluorine bearing minerals. Some of these minerals report to concentrate and are responsible for the presence of the penalty element, fluorine, wit
Jan 1, 1997
-
Urban Geology and its Relationship to Intraplate Earthquake Risk - Lessons from the 1989 Newcastle ExperienceFor the past five years the University of Queenslandhas, through its various workshops, been preaching to Australia that there was a potentially hazardous situation from earthquakes for urban Australi
Jan 1, 1990
-
Post Pillar Cut and Fill Stoping at the Dolphin Mine of King Island ScheeliteBy Bedford D. J
The post pillar cut and fill stoping method has been adopted by King Island Scheelite for the extraction of the main Dolphin orebody. The orebody is a massive, tabular deposit varying from 10 to 50
Jan 1, 1977
-
Rehabilitation of the Lake George Mine at Captains Flat NSW ù 25 Years OnBy J Brisebois
The derelict Lake George Mine is located at Captains Flat in NSW, acommunity of approximately 450, which lies some 43 km southeast ofQueanbeyan. It straddles the Molonglo River, which flows toQueanbey
Jan 1, 2003
-
Spontaneous Combustion of Some Queensland CoalsBy Cudmore JF, Rowlands D
Incidents associated with spontaneous combustion of coal have resulted in the loss of many lives and considerable capital and equip- ment. Nevertheless, the factors controlling the propensity of coa
Jan 1, 1981
-
Experience With Production in a Gassy Environment, Oaky North MineProblems associated with gas management become more significant as exploitation of coal reserves in the Bowen Basin in Australia becomes deeper. At Oaky North mine, relocation of production from one a
Jan 1, 2005
-
Mineralogy and Geology of the Serpentinite Associated Hitura Ni-Cu Deposit, Finland: Implications for BeneficationBy Penttila V
The Paleoproterozoic Hitura Ni-Cu deposit in western Finland is in an ultramafic igneous complex composed of two subvertical plug-shaped bodies embedded in intensely migmatised felsic gneisses. The
Jan 1, 1996
-
Interpretation of Field Stresses and Deformation Moduli from Extensometer Measurements in Rock TunnelsBy Redman P. G, McMahon B. K
A simple technique for evaluating the field stress ratio is presented, based on the results of extensometer or convergence tape measure- ments taken in an advancing tunnel. This tech- nique also yie
Jan 1, 1981
-
Morwell Open Cut: Mine SchedulingBy Brimblecombe P
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres
Jan 1, 1989
-
Resin Bonded Bolting in French Coal MinesRoof bolting with resin bonded bolts has been developed extensively in French coal mines. There are three aspects of this development: 1. The reason for and the care used in the development of roof
Jan 1, 1971
-
The Application of Spectrometric Coal Lithology Logging in Brown Coal MiningBy Smith Z, Huppert P, Charbucinski J
The paper describes a spectrometric method and apparatus developed for lithology logging in brown coal formations. The nuclear spectromet- ric technique developed is able to delineate coal/sand/clay
Jan 1, 1989
-
The Evaluation of Laboratory High Tension Roll Separation Results with Particular Reference to the Mineral Sands IndustryLaboratory high tension roll separation and the commercial machines available for this purpose are discussed. The shortcomings of these machines are indicated and a machine that overcomes some of
Jan 1, 1972
-
Heap Leaching at Camel Creek MineBy Menne D. M, Ladyman R
Camel Creek Mine operated by Lynch Mining Pty Ltd is located 65 km west of inghain and 160 kin north west of Townsville in North Queensland. (Figure 1). The Camel Creek gold mineralisation was disco
Jan 1, 1994
-
Areation Catalysts for Upgrading Reduced Ilmenite to Synthetic RutileBy Bailey S, Avraamides J
Laboratory-scale experiments were conducted in a mechanically stirred aeration vessel to determine the rusting abilities of aerated water in the presence of various catalysts compared to the industr
Jan 1, 1996
-
An Assessment Of Vehicles Used In Underground Trackles Mining Operations At Cobar Mines Pty. LtdBy Palmer W. T
The successful re-opening of the Cobar min- eral field was dependent upon the success- ful introduction of highly productive, low cost mining. Mechanised cut and fill stop- ing with incline access wa
Jan 1, 1973
-
Application of SMELT-2 Package to a Study of Continuous Converting in Sirosmelt ReactorsBy Denholm W. T
The SMELT-2 package is specifically designed to perform on-line simulation of smelting processes. This paper describes its application to the simulation of continuous matte converting followed by r
Jan 1, 1989