Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Didipio Flash Flotation and Gravity Recovery CircuitBy M McGrory, A Rodolfo, J Paredes, L E. Manguba, K A Villaspir, G Webb, R Setiagani, H Cardenas
"OceanaGold’s Didipio operation has been in operation for three years. Integral to the flow sheet design is a flash flotation circuit treating a portion of cyclone underflow, consisting of an Outotec
Oct 10, 2016
-
Go with the flow – managing hydrogeological staff turnover at Ernest Henry mineBy C Hawtin, B Miller, D Ashton
Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we
Sep 20, 2017
-
Health Impacts Extend from the Life of a Mine to the Life of a Community - Knowledge GapsBy P Kirsch, P Jagals, D Viswanathan, J Shandro, R LaBouchardiere
The planning, design and operation of mines must include the development of positive environmental, community and land-use benefits if it is to achieve good corporate social responsibility and minimis
Jul 10, 2012
-
Subduction of Oceanic Plate -Its Realities- Summary of French-Japanese Cooperative "Kaiko" ProjectBrief summary of results obtained by a French-Japanese cooperative study on the bottom of trenches around Japan. The geophysical prospection, multi beam echo sounding and direct observation with s
Jan 1, 1987
-
Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New ZealandBy W Newns
This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.
Mar 8, 2011
-
Processing of Magnetite Iron Ores - Comparing Grinding OptionsBy A Jankovic, D David, P Payne
Although the majority of current steel production is supported by iron ore sourced from high-grade haematite deposits, the long-term growing demand for steel has led to higher raw material prices and
Jan 1, 2009
-
Thermal Modelling and Mitigation Measures for the Bogong Power DevelopmentBy D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
Sustainable Development Reporting in the Australian Minerals Processing IndustryBy A Bossilkov
Although environmental and sustainable development reporting has now become widespread in the Australian mining and minerals processing sector, there remains a great deal of diversity in reporting con
Jan 1, 2004
-
An initial review of conceptual alternative layouts for production areas in Kiirunavaara mineBy F K. Altuntov
The study presented in this paper is based on the Kiirunavaara underground mine located in the northern part of Sweden. The deposit is mined using the sublevel caving (SLC) mining method. This paper b
Mar 29, 2023
-
Flotation of Unclassified Ball Mill Discharge for the Recovery of the Lead and Zinc ConcentratesThe sulphide ore occurring in the North Mine at Broken Hill is of a complex nature, consisting of an intimate mixture of argentiferous galena, marmatite (zinc-iron sulphide), and gangue minerals. A ty
Jan 1, 1933
-
Ventilation contaminant characterisation for a greenfield projectBy A Hatt
This paper presents a case study of characterisation work undertaken at a greenfield exploration project to provide engineering and OH&S inputs for the design of a ventilation system. The paper discus
Oct 12, 2022
-
Metallurgical QA/QC – who needs it? The Olympic Dam experienceBy K Ehrig, V Liebezeit, E Macmillan
The results from metallurgical test programs are used in feasibility studies for design of new plants and brownfield expansions, in long term mine plans, and to make decisions in an operating plant. T
Sep 11, 2017
-
Application of Tracer Gas Flow Profiling to Improve Secondary Ventilation Practice – A Pilot StudyBy S Wilkinson, S Black, L van den Berg
"The mine ventilation system plays an important role in mitigating human exposure to diesel particulate emissions (DPM), exhaust gases and heat in underground mines. The mine’s secondary ventilation s
Aug 31, 2015
-
Tailing filtration practices in Mexican gold and silver minesBy S Gomez-Hernandez, P D. Munro
Filtered dry stack tailing storage facilities offer many advantages over thickened tailing storage facilities and yet, most of the mining companies still prefer the latter.Some of the advantages of fi
Aug 29, 2018
-
A Novel Approach to the Characterisation of Iron Ores and Concentrates Using Recent Advancements in Wavelength- and Energy-dispersive X-ray Fluorescence SpectrometersBy M Rayner, C Tsouris, A Komelkov
X-ray fluorescence (XRF) is a widely accepted technique for the elemental analysis of iron ores and their concentrates. Wavelength-dispersive, or WDXRF, and energy-dispersive, or EDXRF, spectrometers
Jul 13, 2015
-
Adequacy of Sampling and Volume Estimation for Premining Potential Acid Forming Waste Evaluation Using Statistical and Geostatistical MethodsBy A Garvie, D Kentwell, J Chapman
"Most new mining projects require an initial assessment of the locations and volumes of potential acid forming (PAF) waste that is likely to be moved and dumped in surface waste stockpiles. This requi
Jul 10, 2012
-
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel CaveBy A Coelho, D Bruce, H Grosser, C Parken, M Xia
Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank
Mar 15, 2021
-
Carbon kiln selection, operation and maintenanceBy J K. Claflin, S R. La Brooy, A M. Claflin
Rotary kilns have been in service in the gold industry to regenerate carbon for 65 years. At the time oxide ores with gold head grades of 8 to 10 g/t were being treated. Carbon could be regenerated ad
Aug 29, 2018
-
The use of collaboration and management to turn-around the performance of a failing copper mineBy M Jacobs
This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo
Jun 22, 2022
-
Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western AustraliaBy A D. Caccioppoli
Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits
Aug 22, 2011