Search Documents

  • ISEE
    Drill and Blast Instrumentation for Troubleshooting Underground Up-Hole Stoping

    By Braden Lusk, Tristan Worsey, Nathan Rouse, Kyle Hall

    Loading explosives up hole has challenges that are typically not seen in down hole explosive loading. Most explosives applications are not up hole. Lack of experience and technology can cause signific

    Jan 1, 2018

  • AIME
    Howe Memorial Lecture - Last Twenty-five Years in Metallography

    By William Campbell

    FiRst I must express my deep appreciation for the honor of being privileged to give the Howe Memorial Lecture this year and at the same time my feeling of inadequacy to do justice to the subject. T

    Jan 1, 1926

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • NIOSH
    RI 2957 Smelting In The Lead Blast Furnace - II. - The Gases From The Top Of The Lead Blast-Furnace.

    By G. L. Oldright

    This paper is the second of a series that is to appear on smelting in the lead blast furnace. The objects of this investigation are to determine the conditions obtaining within the blast furnace by di

    Jan 1, 1929

  • SAIMM
    Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analyses

    By H. Jang, Y. Kawamura

    Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter

    Jan 1, 2015

  • NIOSH
    IC 9412 The Materials Flow Of Mercury In The United States

    By Stephen M. Jasinski

    This report describes the materials flow of mercury in the United States. It examines the mining and production of mercury and the manufacturing, uses, and ultimate disposal of mercury. Materials flow

    Jan 1, 1994

  • AUSIMM
    Computer-Based Design of Open Cut Mines

    Three stages are involved in the complete design and evaluation of an open cut mine. These are:1. design of the optimu,m ultimate pit, and selectionof the optimum mill capacity,2. development of produ

    Jan 1, 1970

  • AUSIMM
    Working within the Current Legislation and Economic Environment: What are the Implications for Efficient, Productive and Safe Operations?

    This is what I term ... the graveyard end of any Conference. It's almost over. Those of you remaining are either all talked out or past the information overload stage.

    Jan 1, 1997

  • SME
    The Next Decade Of Change - Mining's New Future Management, Metrics, Methods, Machines, Maintenance, Money

    The reduced need for traditionally trained and educated personnel in the mining industry is systemic to the changing mining industry. Our universities and other training institutions are doing just fi

    Jan 1, 2011

  • IOM3
    Mineral exploration practice in Ireland

    By R. W. Schultz

    Mineral exploration carried out in Ireland since the mid-1950s has resulted in the discovery of ore deposits that are now in production atTynagh (Pb-Zn-Cu-Ag), Silvermines (Zn-Pb) and nearby Ballynoe

    Dec 1, 1971

  • SME
    Use Of Precast Concrete Segments For The Price Road Drainage Tunnel Tempe, Arizona

    By William D. Leech, Ronald E. Romley, Gary N. Sheppard

    The Price Road Drainage Tunnel was constructed for the Arizona Department of Transportation (ADOT) in 1988 and 1989 to provide surface water drainage for the proposed outer Loop Highway (SR 117). The

    Jan 1, 1991

  • AUSIMM
    Identifying and Dealing with Outliers in Resource Estimation

    By C De-Vitry

    In skewed distributions seen in many geochemical data sets, samples at the extreme ends of the distribution are often termed ‘outliers’. Samples considered as outliers can often make exploratory data

    Aug 18, 2014

  • SME
    Forensics Of Difficult Ground Conditions Leading To Advanced Solutions For Recovery Of An Abandoned Tunnel Project

    By Faruk Oksuz, Phillip L. Covell, Martin Doll

    A series of difficult ground conditions causing high groundwater inflows and hazardous gas intrusion abruptly halted the construction of a 6.4-meter (21-foot) finished diameter and 1,890 meters (6,200

    Jan 1, 2007

  • CIM
    The ACACIA Reactor Improving Gravity Recovery!

    By Ish Grewal

    The ACACIA Reactor - Introduction What is it? The Acacia Reactor is a fluidized bed high intensity cyanide leaching system. Purpose for its existence? The Acacia Reactor was developed to treat hig

    May 1, 2002

  • SME
    Improving The Performance Of Minerals Beneficiation Plants ? I. General Principles - Introduction

    By R. E. J. Putman

    Rising demand, artificial market conditions, increased overseas competition, and a fluctuating international situation have brought ever increasing pressures to bear on the nonferrous metals industrie

    Jan 1, 1967

  • AUSIMM
    The Air Comparison Pycnometer for Rapid Iron Determinations

    The Beckman Air Comparison Pycnometer is as accurate as the specific gravity bottle for the determination of the volume of fine powders, or particles, up to 50 c.c. in volume. The determination using

    Jan 1, 1963

  • SME
    The Next Great Chapter; Caterpillar Finalizes Purchase Of Bucyrus

    When Caterpillar announced that it had purchased Bucyrus for $8.8 billion, it was billed as the next great chapter in the history of mining. Surely, when the history books are written, it will be reme

    Jan 1, 2011

  • AUSIMM
    The Petrology and Paleoenvironmental Setting of Coal at Waitewhena Coalfield û Relationships Between Paleoenvironment, Coal Type and Analytical Data

    Lower Miocene Maryville Coal Measures at Waitewhena Coalfield, in the Taranaki coal region, include seams of sub-bituminous coal up to 4 m thick. During coalfield exploration Fletcher Challenge Ltd dr

    Jan 1, 1987

  • SME
    Copper Precipitation And Cyanide Recovery Pilot Testing For The Newmont Yanacocha Project

    By S. Acar, M. Botz

    Introduction In 2007, Newmont Mining Corporation will begin construction of a milling and cyanidation leaching circuit for the Yanacocha site in Peru. Ore to be processed in the circuit contains a r

    Jan 1, 2007

  • SAIMM
    Detection of systematic errors in the data used for mass balancing using the Movazen© software, M.R. Yarahmadi, S.R. Mortazavi, and S. Banisi

    By S. Banisi, M. R. Yarahmadi, S. R. Mortazavi

    Nowadays the development of automatic on-line sampling systems has enabled large amounts of data to be available to plant managers. These data are inevitably prone to random and sometimes systematic e

    Jan 1, 2020