Search Documents

  • AUSIMM
    A Simulation Study on Two-Stage Grinding with High-Pressure Roller Mills

    A Simulation Study on Two-Stage Grinding with High-Pressure Roller Mills By the application of high-pressure roller mill (HPRM) in the field of mineral processing, computer simulation can be used to

    Sep 13, 2010

  • CIM
    Impact of Operating Conditions on Emissions from Mine Haul Trucks Operating in the Oil Sands Region of Alberta, Canada

    By R. J. Schafer-Frentz, T. G. Joseph, M. Curley

    "Greenhouse gas emissions—specifically of carbon dioxide—are a concern in Canada, where industrial sectors such as mining are stringently regulated for carbon release. Cumulative emissions are positiv

    Jan 1, 2019

  • SME
    Reflections on ilmenite roasting and magnetic separation

    By N. R. Allen, J. D. Steenkamp

    Oxidative roasting is applied on an industrial scale to beneficiate ilmenite concentrates from South African East Coast heavy minerals deposits - the aim is to increase the magnetic susceptibility of

    Jan 1, 2005

  • NIOSH
    RI 3453 Relative Air Dustiness During Cycle Of Operations At Mount Weather Testing Adit ? Introduction (df2df58f-379d-486b-93fa-fed333849f65)

    By John A. Johnson

    For the purpose of comparing the amounts of dust produced by various mining operations, samples of atmospheric dust were collected during a complete cycle of drilling, blasting and mucking at or near

    Jan 1, 1939

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009

  • CIM
    High Performance Cu-Ti Alloy Wires Prepared By Over-Aging and Intense Cold-Drawing

    By Takayuki Takasugi, Naoya Masahashi, Yasuyuki Kaneno, Satoshi Semboshi, Yusuke Kadoi

    Cu–Ti alloy wires doped with and without a small amount of Ni were fabricated by over-aging and using intense drawing procedures. For both the Cu–Ti alloys with and without Ni doping, the over- aged m

    Jan 1, 2019

  • NIOSH
    Assessment And Evaluation Of Noise Controls On Roof Bolting Equipment And A Method For Predicting Sound Pressure Levels In Underground Coal Mining

    By Rudy J. Matetic

    Over-exposure to noise remains a widespread and serious health hazard in the U.S. mining industries despite 25 years of regulation. Every day, 80% of the nation’s miners go to work in an environment

    Jan 1, 2006

  • NIOSH
    OFR-73-84 Testing Of A Fragmentation System For A Hard Rock Mining Machine

    By Thomas Brunsing

    The program was carried out to develop deep kerfing and core breaking techniques to be incorporated into the design of a field prototype hard rock mining machine. The field machine is designed to mine

    Jan 1, 1983

  • IOM3
    Layered mine waste co-mingling for mitigation of acid rock drainage

    By J Hadijigeorgiou, R. W. Lawrence, R Pouling

    The layered co-mingling method involves the disposal of waste rock with the addition, at predefined construction stages, of layers of dewatered mine tailings. The resulting waste structure displays bu

    Apr 1, 1996

  • AIME
    Producing – Equipment, Methods and Materials - Effect of Anisotropy and Stratification on Pressure Transient Analysis of Wells with Restricted Flow Entry

    By H. Kazemi, M. S. Seth

    The effects of anisotropy and stratification on flow behavior and production performance of oil and gas wells have been studied by numerous authors.1-3 Lefkovits et al.l studied the performance of tot

    Jan 1, 1970

  • DFI
    Critique of Specifications for Deep Mixing

    By George Filz, Peter R. Cali

    "Unnecessarily restrictive specifications could be limiting the cost effectiveness of deep mixing (DM) applications and therefore limiting use of DM on projects where there are other options. Excessiv

    Jan 1, 2015

  • CIM
    Man-Less Underground Mining ? Hurdles on the way to Make Dreams Come True

    By Jacek Paraszczak

    For mining companies facing strong international competition and unfavorable commodities? prices, automation of underground operations has got a potential to increase productivity and help cut cost. H

    May 1, 2001

  • NIOSH
    IC 6543 Mining Practices, Methods, And Costs At Elkoro Mines, Jarbidge, Nev. ? Introduction

    By John Furness Park

    This paper, which describes the mining methods and practices at the Jarbidge mines of the Elkoro Mines Co., is one of a series of papers being issued by the United States Bureau of Mines on mining met

    Jan 1, 1931

  • NIOSH
    Mining And Quarrying Trends In The Metal And Nonmetal Industries (1fbce22d-0e62-47f3-8d72-9aff3f7e6c80)

    By Franklin D. Cooper

    The value of nonfuel raw mineral production in the United States for 1977 increased over that of 1976 by 5%, from $16.7 billion to $17.5 billion. Metals declined by 5% from $6.1 billion to $5.8 billio

    Jan 1, 1980

  • SME
    Ground Observation System (GOS): A Web-Based Data Information Center for Ground Control Monitoring

    By E. C. Westman, W. R. Thomas, W. J. Conrad, A. J. R. Russell

    "Understanding ground control problems continues to remain a focus of the mining engineering community. To aid mine operators and engineers in identifying and responding to ground control issues, the

    Jan 1, 2015

  • AIME
    A Technical Study Of Coal Drying

    By G. A. Vissac

    MOISTURE in coal must be considered as an impurity, just the same as ash, from the standpoint of utilization of the coal. Being incombustible, it reduces directly the heating value of the coal, and in

    Jan 1, 1949

  • IIMP
    Trazadores litogeoquímicos de fertilidad del magmatismo vinculado a pórfidos de Cu (-Mo, -Au) en el sur del Perú, del Jurásico al Mioceno

    By Alonso Marchena, William Martínez, Joel Otero

    En Arequipa, Moquegua y Tacna se han definido diversos arcos magmáticos. En los arcos jurásico, paleoceno y oligo-mioceno ocurren pórfidos de distintas características, los cuales presentan diferencia

    May 22, 2019

  • NIOSH
    IC 8761 Preliminary Economics Of Mining A Thick Coal Seam By Dragline, Shovel-Truck, And Scraper Mining Systems

    By Michael J. Bertoldi

    The purpose of this Bureau of Mines report is to describe the methods and establish the basic economics for dragline, shovel-truck, and scraper mining systems. An overall view of the techniques of pre

    Jan 1, 1977

  • SME
    Tunnel Protection by Ground Improvement Prior to Track Lowering

    By Ronald E. Triplett, George K. Burke, Bernard H. Voor

    To accommodate larger double-stack rail cars through a tunnel, the existing active tracks were to be lowered. The tunnel is an elliptical, horseshoe-shape with concrete base support, removal of which

    Jan 1, 2001

  • NIOSH
    OFR-76-77 Investigation Of The Various Factors Affecting The Response Of Passive Configuration Track Etch Dosimeters To Working Level Hour Exposure In Radon And Radon Daughter Atmospheres

    By D. B. Lovett

    The work described in this report was directed toward identifying and devising methods to minimize the previously observed variability between working level hour exposures and the alpha particle track

    Jan 1, 1976