Search Documents

  • ISEE
    Presplitting and Controlled Blasting Techniques

    The objective in control blasting is to reduce overbreak to control the final pit wall slope, shaft, drift, ditch, bench, etc. to the final planned excavation limit.

    Jan 1, 1990

  • AIME
  • SAIMM
    Management Of Subsidence Associated With The Mining Of The Roof Of The Sishen Cave. An Application Of The Slope Stability Radar

    By Glen Mc Gavigan

    The roof of the Sishen cave is being mined in order to exploit 6.8Mt of high grade ore. The cavity is filled with quartzite backfill in order to support the roof in the event of collapse. The cave d

    Jan 1, 2006

  • SME
    A century of mining safety and health research A century of mining safety and health research A century of mining safety and health research

    By John A. Breslin

    The year 2010 will mark the 100th anniversary of the beginning of the research efforts by the U.S. government to improve the health and safety of miners working in the United States. This research

    Jan 1, 2010

  • AUSIMM
    Pulverizing Goals

    Brief descriptions of several types of unit pulverizeI' are given and the functioning of the components that crush, carry, dry and classify the coal is considered. A distinction is drawn between

    Jan 1, 1957

  • AUSIMM
    Bioleaching of Weathered Saprolite - Heavy Metal Adaptation Mechanisms of Aspergillus foetidus

    Bioleaching of Weathered Saprolite - Heavy Metal Adaptation Mechanisms of Aspergillus foetidus Nickel laterite ores remain important to the future supply of Ni and Co as they contain the bulk of know

    Sep 13, 2010

  • AUSIMM
    Undercutting to Surface Breakthrough – Cadia East Panel Cave (Stage 1)

    By B Mobilio, M Secheny, J Rachocki, G B. Sharrock, A Jäger, J L. Lett, I Brunton, G W. Capes

    Establishment of the Cadia East Panel Cave Stage One (PC1S1) commenced with the firing of the first bell in early 2011. Production began with the completion of the undercut in May 2014. PC1S1 used a p

    May 9, 2016

  • DFI
    Lessons Learned From Installation Of ACIP Piles In Various Geologic Settings Of The NYC Region

    By Frank J. Arland

    Augered-Cast-in-Place piles have been used successfully for many deep foundation applications. The four case studies discussed herein describe ACIP pile projects where problems developed during ACIP p

    Jan 1, 2004

  • SAIMM
    A Comparison of Limit Equilibrium and Numerical Modelling Approaches to Risk Analysis for Open Pit Mining

    By H. T. Chiwaye

    Risk analysis is an important step in the design of rock slopes in open pit mining. Risk is defined as the product of the probability of slope failure and the consequences of the failure, and is gener

    Jan 1, 2010

  • SME
    Sales Comparison Valuation Of Development And Operating Stage Mineral Properties

    By Trevor R. Ellis

    Minerals appraisers/valuers often find great difficulty in attempting to employ the sales comparison approach to the market value appraisal of development and operating stage mineral properties. An im

    Jan 1, 2011

  • DFI
  • SME
    An Overview Of The S & K Copper Mine Heap Leach, SX-EW Process Monywa Project, Myanmar

    By D. J. Kunz

    Myanmar Ivanhoe Copper Company Ltd. (MICCL) has been operating the Sabetaung- Kyisintaung (S&K) Project producing LME Grade A Copper Cathode using the Heap Leach-SX-EW Process since 1998. The minerali

    Jan 1, 2001

  • NIOSH
    IC 8694 Mine Power Distribution - Proceedings: Bureau Of Mines Technology Transfer Seminar, Pittsburgh, Pa., March 19, 1975 (04360c92-be8f-4a90-b0f4-005942847afa)

    The papers contained herein summarize results of various recent Bureau of Mines investigations in the area of mine power distribution systems. They are based on information from Bureau personnel, cont

    Jan 1, 1975

  • AUSIMM
    Amphibole Au-Cu Skarn and Massive Sulfide Replacement at the Peak Deposit, Eastern Interior, Alaska

    By P Illig, R Newberry

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Recent exploration efforts in Eastern Interior, Alaska have discovered significant ca 72 Ma

    Mar 18, 2015

  • DFI
    Design And Construction Of Bored Piles And Diaphragm Wall For MHA Headquarters Complex, Singapore - Synopsis

    By N. S. Yet

    This paper shall present the design and construction of bored pile and diaphragm wall for the proposed MHA complex in Singapore. The work was carried out by L&M Foundation Specialist Pte Ltd and PWD C

    Jan 1, 2000

  • AUSIMM
    A Cathode Headbar for Zinc Electrolysis: Developments at Risdon, 1917-1957

    By Bain J. H

    Since zinc was first deposited at Risdon in February, 1917, provision of the most economical cathode assembly has been a subject of extensive research, the major problems being corrosion and efficient

    Jan 1, 1958

  • TMS
    Synthesis and Characterization of Pure and Doped Nanocrystalline Zinc Oxide

    By Rashmi Ramesh

    Zinc oxide nanoparticles and nanostructures form an active area of research in the recent years. It can be doped to modify electronic, optical and other properties. Synthesis and characterization of z

    Jan 1, 2010

  • AIME
    Drilling - Equipment, Methods and Materials - Stresses at Intersection of Tubes: Cross- and T-Joints

    By A. A. Toprac

    The recurring problem of joint failures in ofjshore structures, coupled with the catastrophic collapse of many of these structures during Hurricane Hilda (1964), hay forced reconsideration of techniqu

  • SAIMM
    Relating High-Resolution Tilt Measurements To The Source Displacement Of An M2.2 Event Located At Mponeng Gold Mine

    By P. Share

    As part of JAGUARS (JApanese-German Underground Acoustic emission Research in South Africa), high-resolution tiltmeters were installed during 2007 at Mponeng gold mine, South Africa, in an attempt to

    Oct 1, 2013

  • AUSIMM
    Paper No. 182. Modern Methods in Mine Surveying.

    THE art of mine surveying has made very great progress in recent years, and is still advancing, perhaps faster than any other branch of surveying. The scope of the mine surveyor's duties has grea

    Jan 1, 1909