    Anchored Excavation Support Using SMW (Soil Mixed Wall)

    By Seth L. Pearlman

    A major excavation support case history for the Eastern approach to the Third Harbor Tunnel (THT) in Boston, MA is described, which uses an anchored Soil Mixed Wall (SMW). Both general and project spe

    Jan 1, 1993

  • SME
    Probable Cost Estimating and Risk Management

    By John Reilly

    Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti

    Jan 1, 2008

  • CIM
    A Feasibility Study on the Use of Desulphurized Tailings to Control Acid Mine Drainage

    By Mostafa Benzaazoua, Bruno Bussière, Philippe Poirier, Denis Bois

    "Environmental desulphurisation is an attractive alternative for the management of acid generating tailings. Non selective froth flotation is the most commonly used method to produce desulphurized tai

    Jan 1, 2004

  • CIM
    Truck Lift System

    ? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM

    May 1, 2003

  • SME
    Pre-Implementation Evaluation of VR as a Mine Safety Training Tool - SME Annual Meeting 2025

    By CASSANDRA L. HOEBBEL, Jennica L. Bellanca

    High-fidelity, immersive training is known for its learning and logistical benefits. While other industries have used virtual reality (VR) for decades, the same uptake has not been seen in mining. NIO

    Feb 1, 2025

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • ISEE
    Experience with and benefits from the use of 3D Stereophotogrammetry for blast design and control

    By Peter Moser, Mark Ganster, Andreas Gaich

    Surveying of a bench face before blasting is a pre-requisite for a proper blast planning and for a satisfying blasting result both in terms of safety and fragmentation. When surveying a bench face, pr

    Jan 1, 2007

  • IMMS
    Deep Ocean Seafloor Mineral Extraction ? Environmental and Social Responsibility for a New Industry

    By Samantha Smith

    Nautilus Minerals (Nautilus) is following the lead of the petroleum industry as it strives to tap vast offshore resources. Planning is well underway for the Solwara 1 Project in the Bismarck Sea, Papu

    Jan 1, 2010

  • IIMP
    Energy efficiency in the industry: A step to increase productivity

    By Elizabeth Cruz

    The paper point out innovative energy management techniques that lead to energy recovery and uses it back in the process as heat, mechanical work or power with a consequent impact on operating cost

    Sep 14, 2009

  • AIME
    Industrial Minerals Review – 1972 - Foreword

    By J. F. Havard

    The enterprises based upon the industrial minerals are diversified in geologic habit, mining systems, processing techniques and marketing methods. Nevertheless, in 1972 these enterprises faced many of

    Jan 1, 1973

  • SME
    Adaptive Environmental Management - "Reactive or Adaptive?"

    By Charles J. Kucera

    Today's highly publicized issues of resource development and environmental protection are not new. But recently these issues have been played one against the other, and some would have us believe

    Jan 1, 1979

  • SME
    Single-Shell Tunnel Lining with Reinforced Concrete Rings: Critical Loads and Damage Prevention

    By Fritz Grübl

    Modern shield TBMs allow tunnel drives through almost any type of ground. Thanks to high elaborated technical measures, significant subsidence of the ground surface can be almost entirely avoided.

    Jan 1, 2001

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • SME
    Plant Design, Practice Conference Attracts Processing Specialists

    By William R. Yernberg

    The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by

    Jan 1, 2003

  • AUSIMM
    Thermodynamics of Cobalt Oxide in Iron Silicate-Based Slags

    By S Jahanshahi, D R. Swinbourne

    The classical metal-slag-gas equilibrium technique was used to study the thermodynamic activity of cobalt, iron and their oxides in iron silicate based slags containing under controlled oxygen potenti

    Jan 1, 2000

  • CIM
    "Linatex Dewatering Equipment in Selected North American Applications"

    By T. A. Kirk

    "The Linatex Dewatering System is a compact, low capital and maintenance cost matched set of processing equipment suitable for solids recovery, dewatering and desliming sand-like materials in the rang

    Jan 1, 1978

  • AUSIMM
    Development and Validation of Ore Characterisation Test and its Use in Variability Campaigns of Comminution Circuits

    Development and Validation of Ore Characterisation Test and its Use in Variability Campaigns of Comminution Circuits Impact testing was developed by assessing the fragmentation characteristics of ore

    Sep 13, 2010

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010

  • DFI
    6000 Ton Osterberg Load Test Reduces Foundation Costs For Delaware River Tramway

    By Aly M. Mohammad

    The Delaware River Tramway will link civic and retail developments in Philadelphia, Pennsylvania and Camden, New Jersey. Twin 300-foot towers will anchor the cables at either side of the river. Four h

    Jan 1, 2002

  • ISEE
    Masterblaster Blasting Management System

    By Chris Uys, Johan Labuschagne

    Sishen Iron Ore Mine, located in the Northern Cape, is an open cast mine excavating approximately 100 million tons rock to produce 25 million tons of high grade haematite ore per annum. The size of th