Subsidence Prediction Influence Assessment and Damage ControlBy Y. Luo
An extensive subsidence research program conducted by the authors has greatly improved the accuracy and the capabilities of subsidence prediction under complicated mining and surface conditions. The t
Jan 1, 1997
-
Mapping Hazards With Microseismic Technology To Anticipate Roof Falls - A Case Study (ac4523c6-7bdb-4660-a1cb-20433a65c0ed)By Anthony Iannacchione
As the amount of new fractured surfaces or "damaged rock layers" within roof rock increases, the stability of the rock mass decreases. While direct measurements of this phenomenon are not easily made,
Jan 1, 2004
-
An Analytical Approach to Determine Stress Distribution in Longwall Chain PillarsBy James M. Kramer
This paper introduces an analytical approach for the determination of the vertical stress in the chain pillar system between two adjacent longwall panels. The development of this approach is based on
Jan 1, 1998
-
Design Considerations For Cable Truss Secondary Supports In Roadways Of Underground CollieriesThe purpose and current practice of cable trusses in underground coal mines is briefly outlined and details of various cable truss designs are presented. The main part of the paper describes the in-si
Jan 1, 1992
-
A Case History Investigation of Two Coal Bumps in the Southern Appalachian CoalfieldBy David Newman
The Southern Appalachian coalfield has a long history of coal bumps that are attributable to a unique combination of topography, geology, and multiple seam mining. The high pillar stresses that genera
Jan 1, 2002
-
Coal Mine Primary Support Selection: Tension Versus Non Tensioned Roof Bolt SystemsBy Kot Unrug
The selection of tensioned versus non-tensioned roof bolts, for primary coal mine roof support, has been debated for well over 25 years. The wide spread use of fully grouted rebar marked the beginning
Jan 1, 2004
-
The Use of NDT Methods to Determine the Condition of Rockbolt Support During the Recovery of a Previously Flooded Coal Mine Roadway at Thoresby CollieryBy Brian Clifford
Thoresby Colliery is in the process of recovering an old roadway that was flooded following the closure of an adjacent mine. The aim is to re-use the roadway as a gate road for a longwall retreat pane
Jan 1, 2002
-
Ground Control In Multiple Seam MiningBy Robert A. Stansbury
The No. 14 Mine of United States Steel Corp- oration is located at Munson, West Virginia, in &Dowell County. The mine was originally assigned 7,530 acres of Pocahontas 3, 4 and 5 Seams. Production beg
Jan 1, 1981
-
Geophysics For The Detection Of Abandoned Mine WorkingsBy Christopher Phillips
In light of recent events in the mining industry, there has been an increasing demand for technology to detect underground voids and abandoned mine workings. This paper summarizes the use of geophysic
Jan 1, 2003
-
Skin Failure Of Roof And Rib In Underground Coal MinesBy Eric R. Bauer
Skin failures of roof and rib in underground coal mines continue to be a significant safety hazard for mine workers. Skin failures do not usually involve failure of the support systems but result from
Jan 1, 1999
-
Enhanced Surface Control For Roof And Rib Support (8fec630d-2a24-4d9d-8993-15ef5bf95858)By Stephen C. Tadolini
The risk of injury caused by minor roof falls continues to increase in underground mining. Most ground control injuries result from small rock falls that occur in a supported area, but do not involve
Jan 1, 2001
-
Design And Planning Of Lower Seam Longwall GateroadsCase study data were analyzed to develop and quantify empirical stress transfer relationships between seams for both longwall and room and pillar mines. Layering in the innerburden and the distance be
Jan 1, 1995
-
Stability of Backfilled Cross-panel Entries During Longwall MiningBy Brad Seymour
In cooperation with Cyprus Twentymile Coal Co., researchers from the National Institute for Occupational Safety and Health (NIOSI-I), Spokane Research Laboratory, conducted a study at the Foidel Creek
Jan 1, 1998
-
Mining-Induced Stress Measurement With Hydraulic Borerole Pressure CellsBy Paul A. Lu
This paper proposes an unconventional, simple, and practical method of measuring mining-induced around stresses with hydraulic borehole pressure cells. The method is a direct ground stress measuring t
Jan 1, 1984
-
Estimation Of In-Situ Stress At Ikeshima Colliery Using AE And DRA MethodBy Hideki Shimada
A low cost methodology that allows the determination of in- situ stress using oriented core specimens has been investigated. The technique can be used to determine the stresses during the early stages
Jan 1, 2001
-
Stability Evaluation Of Alternative Designs Of Drift-And-Fill Stoping In Zhaoyuan Gold Mine, P. R. ChinaBy Xianming Zhou
Mining economics is such that too conservative in safety will result in a considerable penalty in mining cost. However, initial planning and design of a mining project often must be done without compl
Jan 1, 1989
-
Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois MineBy Kenny D. Basnett
An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with
Jan 1, 2011
-
Practical Rock Mechanics For Safety And Productivity ImprovementsBy M. Guana
Island Creek Corporation is predominately an underground mine operator deploying room-and-pillar and retreat longwall mining methods for extracting coal. Wide variations are encountered in overburden
Jan 1, 1988
-
Analysis Of Cable Bolt Performance Using Numerical ModelingBy M. Bouteldja
A finite element modelling approach is developed for the evaluation of the mechanical performance of cable bolts supports in underground mine structures. The modelling approach permits the simulation
Jan 1, 1999
-
Preventing Roof Fall Accidents - An Operation's ApproachBy Joe Zelanko
In order to prevent roof fall accidents and injuries, U.S. underground coal mine operators must develop and implement effective roof control strategies. Various tools are available to assist engineers
Jan 1, 2011