Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Cross-Borehole Geophysical Probing For Site CharacterizationBy R. J. Lytle
INTRODUCTION Prior to excavation in soil and rock, it is useful to know the subsurface structure. This is important information both for safety and for equipment scheduling reasons. It is useful to
Jan 1, 1979
-
Hydraulic Considerations For Leaching OperationsBy J. F. Lupo
Leaching operations combine both metallurgical and hydraulic processes to extract metals from the ore heap. In the design of leaching operations, metallurgical tests and simple hydraulic tests are oft
Jan 1, 2000
-
Climax High Capacity Processor – A Novel Design for Coal Pre-Combustion Cleaning – Preprint 97-74By J. V. Ghelarducci, M. A. Sharpe, D. G. Chedgy
This article presents a novel design, called the Climax, High Capacity Processor (HCP), for pre-combustion cleaning of coal. This design is particularly suitable for the plant capacities of 400 ~ 660
Feb 24, 1997
-
Second Manapouri Tailrace Tunnel Design and Construction ConsiderationsBy Brian Heer, David Young, Randall Essex
The Manapouri Power Station is New Zealand’s largest hydroelectric facility located on the South Island of New Zealand. Constructed in the 1960’s, it includes a 700 MW under-ground power station and
Jan 1, 1997
-
2009 Permeation Test Results For Grouts Made With Ultrafine CementsBy Raymond W. Henn
The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2
Jan 1, 2009
-
Austrian Method Of Tunnel Building In Very Heavily Squeezing Ground In Mountainous Terrain Theory And PracticeBy Horst Pöchhacker
The largest structure along the Tauern highway section between Salzburg and Villach is the 6.4-km-long Tauern Tunnel. The major geotechnical problems that came up surprisingly while driving the headin
Jan 1, 1976
-
Manila Aqueduct (Philippines) — The Construction of the Umiray-Angat Tunnel Project — A Success of Organisation and Technology Against a Unique Combination of the Most Adverse Conditions Ever Encountered in TunnelingBy Remo Grandori
The Umiray Angat 13,2 km long tunnel in Philippines have been bored through extremely variable and difficult ground conditions including a number of special events. In particular the following adve
Jan 1, 2001
-
Dynamic Response Analysis of a Reinforced Concrete Structure in Underground Coal Mine Environment with Various Strata Conditions - Mining, Metallurgy & Exploration (2023)By Taghi Sherizadeh, Kutay E. Karadeniz, Dogukan Guner, Samuel Nowak
Seals and build-in-place (BIP) refuge alternatives (RAs) are two main underground structures to isolate an area from the active working zones with different purposes. While seals are used to prevent m
Feb 8, 2023
-
Long-Term Stability Of Overburden Above Room And Pillar MinesBy Gennaro Gerald Marino
Vast improvement in methods of design and analysis of the long- term stability of overburden above room and pillar mines is needed. Improved methods are vital for planning and land development and for
Jan 1, 1986
-
Oil Mining : An Emerging TechnologyBy John S. Hutchins, David L. Wassum
Mining engineers are ready to take a big step into a new field-oil mining. To understand the subject, one must look at the world's oil supply and demand as well as petroleum technology successes
Jan 12, 1981
-
King County’s Project Delivery Approach for the Brightwater ProjectBy William W. Edgerton, Calvin Locke
INTRODUCTION King County, Washington operates a regions wastewater treatment system that provides treatment to 18 cities and 16 sewer districts in the greater Seattle metropolitan area. The system
Jan 1, 2005
-
The OCC Process: A New Method for Near Net and Net Shape CastingBy Hiroshi Soda, Atsumi Ohno, Hiroyuki Yamazaki, Alexander McLean
INTRODUCTION The method of heat removal during a casting process strongly influences the crystal morphology of the cast product and hence the metallurgical and mechanical properties of the solidif
Jan 1, 1990
-
The Relationship Between Porphyry Copper Deposits And Post-Orogenic VolcanismBy Paul Cameron Gilmour
Geologically, as distinct from economically, "porphyry copper (molybdenum, gold, silver, etc.) deposits" might be defined as large, disseminated and/or stock-work occurrences of copper-minerals, gener
Jan 1, 1972
-
Small Tunnel, Big Solution: The Pearl River CSO Storage And Conveyance Tunnel ProjectBy Gui DeReamer
Located on the Wabash River in the central portion of the state, the city of Lafayette, IN is relatively small compared to most cit-ies that incorporate tunnels into their combined sewer overflow (CSO
Jan 1, 2011
-
Microtunneling For Utilities Under Harold Railroad InterlockingBy William Reininger
Microtunneling provides a necessary solution for multiple utility crossings associated with the New York Metropolitan Transportation Authority Capital Construction Company?s (MTACC) Eastside Access Pr
-
Suggested and Prescriptive Means and Methods—Are They Really in the Owner’s Interest?By Gary Almeraris, Vincent Jr Tirolo
Traditionally, “Means and Methods” were the sole responsibility of Contractors. However, because of a number of litigious projects in the 1970s, Owners and their Engineers began including Suggested Me
Jan 1, 2005
-
A Successfully Service Tested Hard Iron With Superior Abrasion And Corrosion Resistance Is Available For The Mineral Processing Industry.By G. A. Calboreanu
One way of cost reduction is attained when using materials with improved erosion ? corrosion resistance. For many years hard irons successfully answered the Mining Operation needs however application
Jan 1, 2012
-
Advances In Electrostatic Separation ? IntroductionBy F. S. Knoll
Electrostatic separation is one of the most misunderstood physical processes used to beneficiate minerals. Nonetheless, millions of tons of titanium ores, iron ores and other minerals are processed ev
Jan 1, 1984
-
Caterpillar Mining Prepares for Recovery with Technology and PartnershipsBy William Gleason
"With desert temperatures climbing high at Caterpillar’s Tinaja Hills Demonstration and Learning Center near Tucson, AZ in September, a group of editors were given a reprieve from the sun and stepped
Jan 11, 2017
-
SIU-Sim: A Novel Coal Preparation Plant SimulatorCoal preparation plant simulators are used to study flowsheet alternatives and determine product quality and quantity that can be produced under various operating conditions for individual circuits. S
Jan 1, 2008