Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Rebuild of a Flash Smelting Furnace Using ExplosivesBy Scott G. Giltner, Terry Millar, Ben Bringhurst
"Kennecott Utah Copper (KUC) Smelter scheduled a rebuild of their flash smelting furnace forSeptember, 2014. KUC’s goal in this project was to reduce the rebuild time from 65 to 55 days by using explo
Jan 1, 2016
-
Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures (a3ef629c-b178-4045-bc88-d04c273fd2c0)By Ewan Selers, Gary Cavanough
Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech
Jan 1, 2016
-
Comparison of Structure Response to Hard and Soft Rock BlastingBy C. T. Aimone-Martin, V. L. Rosenhaim
The response of two structures to blast-induced ground vibrations were evaluated and compared in order to quantify the impact of different blasting operations, hard rock and soft rock blasting, upon t
Jan 1, 2015
-
A Blasting Efficiency Descriptor "Bed" (for surface blasting)By Evan Jannoulakis, Wilfrid Comeau
Using the Scaled Distance (SD) and the vector sum Peak Particle Velocity (PPVvs) from a single delay, preferably single blasthole, in a shot, a number is derived which has shown itself to be consisten
Jan 1, 1998
-
Factors Affecting Fumes Production of an Emulsion and ANFO/Emulsion BlendsBy Donald Hurd, James Rowland, Richard Mainiero
In previous conferences the authors have reported on toxic fumes generated by the detonation of ANFO. The research reported here extends the earlier work to include an emulsion blasting agent and ANFO
Jan 1, 2001
-
Risk Assessment Software Applied To Large Bomb Detonations Near StructuresBy Joshua Hoffman, Rob Farnfield, Catherine Johnson, Braden Lusk, Morgan Lane
IMESAFR (IME Safety Analysis for Risk) is a quantitative risk assessment software tool developed by the Institute of Makers of Explosives (IME) and A-P-T Research, Inc. It is used for managing risk in
Jan 1, 2014
-
Earth Motions Resulting from Large Distributed Chemical Explosive DetonationsBy D Maxwell Ellett
This report presents an evaluation of knowledge concerning a process used in predicting ground motion resulting from large scale conventional explosive detonations, The shots were set off in Arizona i
Jan 1, 1976
-
Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock ConditionsBy Luis Huaroc, Jorge Cardenas, José Salvador
One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents
Jan 26, 2026
-
Vibration Criteria for Surface Mine Blasting: Ten Years after Bureau of Mines R1 8507By David E. Siskind
In the early 1980's, the Bureau of Mines published four reports of structural response and damage from surface mine blasting, vibration monitoring, and analysis methods. These findings replaced simple
Jan 1, 1991
-
Improved Remediation Performance of a Contaminated Basalt Aquifer by Blast FracturingBy Adrian Moore, Bryan Goodwin, David Fales, David Lam
This paper describes the development of blasting protocols used to successfully create a 450m long blast fractured permeable trench in a basalt aquifer up to 20m thick, at a petrochemical facility in
Jan 1, 2011
-
Segregation Blasting Using Electronic Initiation at the Coeur Rochester Mine, NevadaBy Donald Wagstaff, D. Scott Scovire
The Coeur Rochester Mine is the largest primary silver surface mine in North America. Throughout its 17-year life, gold and silver grades leaving the tertiary crusher have typically been, on average,
Jan 1, 2004
-
Blasting Versus Non-blasting Related Sounds in a House Near Surface BlastingBy Braden Lusk
A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav
Jan 1, 2011
-
Productive Partnership – Advanced Blasting Technology at Newlands Coal MineBy Les Willan, Chris Batten, Matt Sparkes
In late 2008 Xstrata Newlands Coal Mine in Central Queensland and Orica Mining Services engaged in discussion to investigate methodologies to change their current mining practices and overcome the iss
Jan 1, 2010
-
Potential Impact of Blast Layout, Sequence and Detonator Timings on Air Overpressure from BlastingBy Shazad Hosein, Bill Birch, Catherine Johnson, Toby White, Liam Bermingham
Air overpressure (AOP) from blasting can give rise to a significant number of blasting complaints from residents living adjacent to blasting operations from mines, quarries or civil engineering projec
Jan 1, 2018
-
Utilising a Dual Belly Auger MPU to Manufacture Bulked Inhibited ExplosivesBy Jason Rock, Rob Thompson, Lee Julian
Reactive ground is ground that undergoes a spontaneous exothermic reaction after it comes into contact with nitrates. This is commonly caused by inert rock hosting sulphide minerals, such as pyrites t
-
Novel Non-Detonable Pumpable Mechanical Sensitizer and System for Emulsion Explosives for Improved SecurityBy Piet Halliday, Ellina Kharatyan
Conventionally, emulsion matrices (unsensitized) need to be sensitized to become detonable explosives. This is done either chemically or mechanically. Both methods have their advantages and disadvanta
Jan 1, 2015
-
Blast Optimization and Vibration Control at a Multi-Seam Coal Mine, BrazilBy Enrique Munaretti, Vitor Rosenhaim, Jair Carlos Koppe, Joao Francisco Feijo
The B3 mine is a multiple coal seam strip mining in operation in Rio Grande do Sul, the southernmost state in Brazil. A traditional truck & excavator operation is used to remove the overburden and sel
Jan 1, 2012
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020
-
Considerations in Pre-Split Blasting for Mines and QuarriesBy J Lyall Workman, Peter N. Calder
"Presplitting is a technique mines and quarries may use to produce high quality final pitwalls. Damage from backbreak can be minimized, thereby insuring the final pit walls standat the designed angle.
Jan 1, 1993
-
Implementation of Blast Vibration Frequency Control Technology at R & F Coal CompanyBy Doug Johnson
This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a
Jan 1, 1988