Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Settlement Of A Building After Cutting Off Pile Tips Due To Tunnelling

    By Richard A. Forth

    During the construction of the Island Line (ISL) in Hong Kong between 1982 and 1986 piled foundations of a building were encountered in a tunnel drive. As the tunnel alignment could not be changed wor

    Jan 1, 2002

  • DFI
    Bearing Capacity Of Pile By Curve-Fitting Method ? Synopsis

    By Z. Q. Zhou

    It is the first worke in design of pile foundation to determine the carring capacity of single pile, and a static loading on site is considered to be the lost derect and reliable way. All values P and

    Jan 1, 2010

  • DFI
    Reinforcement Project For The Shopping Centre "Grand Littoral" In Marseilles

    By J. -M. Rescoussier

    Due to Important settlements inducing major structural damages, the western part of the Grand Littoral shopping centre has been closed in 1997. The present paper describes the project of underpinnin

    Jan 1, 2002

  • DFI
    Old Sewer, Big Risks: Managing Risks During The Design And Construction Of A 21-Story Building Adjacent To A Critical 100-Year-Old Sewer Structure

    By Damian R. Siebert

    Risk-reduction measures implemented during the design and construction of a 21-story pile-supported building adjacent to a below-grade 100-year-old sewer structure were keys to a successful foundation

    Jan 1, 2011

  • DFI
    100-Day Document - Mandatory Discussion, Mediation And Arbitration Of Construction Disputes ? 1.0 Coverage

    1.1 The parties agree to submit all claims, disputes or controversies arising out of, or in relation to, the interpretation, application or enforcement of this agreement, including dispute resolution

    Jan 1, 1994

  • DFI
    Advantages And Limitation Of Integrity Tests For Large Diameter Bored Piles In Bangkok Subsoil

    By Narong Thasnanipan

    In Bangkok due to the prevailing condition of subsoil (existence of considerably weak stratum at top part) deep-seated large diameter bored piles of over 50 m depth with 0.8 -1.8m in diameter have bee

    Jan 1, 2004

  • DFI
    Statnamic Loading Tests On Different Pile Types - 1.0 Introduction

    By Patrick Bermingham

    This report presents the results of six STATNAMIC loading tests that were carried out on four different pile types at the CALTRANS 280 Test Site (Bridge No. 34-46) in conjunction with the Tension Pile

    Jan 1, 1993

  • DFI
    An Approximate Nonlinear Analysis Of Vertically Loaded Piled Rafts In Layered Soils

    By Seung-hoon Lee

    The use of piled raft foundations has been considered as an economical alternative to conventional piled foundations because a portion of the applied load is carried by the raft in the design of piled

    Jan 1, 2008

  • DFI
    New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End Bearing

    By J. Osterberg

    A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward

    Jan 1, 1989

  • DFI
    Incorporating Set-Up Into Reliability-Based Design Of Driven Piles In Sandy Soils

    By Luo Yang

    It has been known that after initial pile driving, pile capacity gain over time (set-up) could constitute a significant portion of the total pile capacity. In the past, there has been very little guid

    Jan 1, 2006

  • DFI
    Evaluating Efficiency of Geo5 in the Analysis of Pile Foundation

    By Elizabeth Varghese, Sanket Rawat, Prachuryya Kaushik, Ravi Kant Mittal

    "Geo5 Software is gaining popularity worldwide due to its expediency in analysis and design of pile foundation. The analysis is based on various theoretical, empirical and semi-empirical methods avail

    Jan 1, 2017

  • DFI
    Maturation of Risk Concepts in the Management of Infrastructure - Lessons from the US Army Corps of Engineers

    By Eric C. Halpin

    "1. Introduction and Backgrounda. In its fundamental form, risk is simply the likelihood of an adverse impact. Expanding on this theme, the Corps of Engineers has broadly defined risk associated with

    Jan 1, 2014

  • DFI
    Design And Construction Of The Rion Antirion Brdoge Foundations

    By Alain Pecker

    The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot

    Jan 1, 2005

  • DFI
    Deep Open Excavation In Chicago Downtown Area For Red Line And Blue Line Subway Connection At Block 37

    By Gordon Chen

    The Block 37 Chicago Transit Authority (CTA) Tunnel Construction Project was originally designed by STV to connect Blue Line subway in North Dearborn Street and Red Line subway in State Street in the

    Jan 1, 2009

  • DFI
    Characterization Of Loess For Deep Foundations

    By Robert L. Parsons

    This paper describes the results of a detailed analysis of a loess deposit at the deep foundations test site established by the Kansas Department of Transportation. Multiple CPT, SPT, and pressuremet

    Jan 1, 2009

  • DFI
    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Vibration-Free Driven Tubular-Piles

    By S. Doombos

    To convert the railway-bridge across the Oude Maas between Dordrecht and Zwijndrecht into a vertical lifting bridge, a drastic adaptation of the existing piers is necessary. Extra piles have to be pla

    Jan 1, 1989

  • DFI
    Mini-Pile Design And Construction Methods Change To Mitigate Soil Loss Through Glacial Till

    By Cassandra A. Wetzel

    Rock socketed mini-piles are a desirable foundation alternative when design capacity is more than 40 tons and there is limited access. In this case history mini-piles were designed to support between

  • DFI
    Deep Foundations In Karst - Lessons Learned From I-40 Corridor Widening In Knoxville, Tennessee

    By James L. Vinson

    Wilbur Smith Associates (WSA) has provided planning, engineering and construction oversight assistance to the Tennessee Department of Transportation (TDOT) for three construction projects intended to

    Jan 1, 2006

  • DFI
    Engineering Sustainability

    "What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som

    Jan 1, 2009