Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Drilled Shaft Foundations For The KcICON Missouri River BridgeBy Paul J. Axtell
The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kcICON project. The cable-stayed bridge is currently under construction and will span the M
Jan 1, 2009
-
Specialized Slurry Wall Equipment - The Hydromill - SummaryBy Mario Mauro
The article illustrates the Hydromill technology, as applied in urban sites, and its advantages in terms of quality of the end product, mitigation of the construction impact, and optimization of the l
Jan 1, 1994
-
Longitudinal Splitting Of Precast Reinforced Concrete Piles During Driving ? SynopsisBy B. B. Broms
The high transverse tensile stresses that develop in precast concrete piles during driving have been investigated experimentally from pile load tests and theoretically using the finite element method
Jan 1, 2010
-
-
Rock Socketed Drilled Shafts in Electrical SubstationsBy Brock Wallis, Steve Davidow
The following text will present the concept of rock socketed drilled shafts used to support electrical substation structures, and discuss the cost and schedule risks that traditional design responses
Jan 1, 2018
-
Load Testing High Capacity Drilled Shafts - SummaryBy Jorj O. Osterberg
Until ten years ago, the largest load tests on drilled shafts (bored piles) were about 3,000 tons (27MN). These tests were made with kentledge (large weights, usually concrete blocks) stacked up as a
Jan 1, 2002
-
Understanding Soils Reports - Presented At A Structural Engineers Association Of Northern California Continuing Education Seminar On Foundations/Excavations, March 1984By Loring A. Wyllie
Preparation, understanding and use of soils reports must be a team effort to be fully effective. The soils engineer must know what is to be built and exactly where. The structural engineer and owner m
Jan 1, 1986
-
Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
-
Measured And Predicted Response Of Laterally Loaded Piles - SynopsisBy K. Mallikarjuna Rao
There are several methods available to estimate deflection and ultimate Capacity of laterally loaded piles. In this investigation an attempt has been made to verify the existing methods for prediction
Jan 1, 1996
-
Innovative Use Of Micropile Load Test Data For 18th Street Expressway BridgeBy Lance A. Roberts
Micropiles are commonly utilized for applications other than foundation retrofit. In bridges, for example, micropiles can serve as the permanent foundation elements or can be used in temporary suppor
Jan 1, 2009
-
Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury BridgeBy Frederick C. Rhyner
Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw
Jan 1, 2004
-
Construction Of A Continuous Flight Auger Secant Wall: Chattahoochee Water Treatment Plant, Atlanta, Georgia - Project DetailsBy Gordon King
The City of Atlanta Water Department required the construction of a two sludge tanks and a wet well at the existing Chattahoochee Water Treatment Plant. Western Summit won a design build contract to b
Jan 1, 2003
-
Risk Management Techniques to Avoid LitigationBy Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
FDOT Method of Independent Separation of Tip and Skin Capacities of Driven Concrete Pile with Embedded SensorsBy Sastry Putcha, Vamshi Vemula, Aneesh Goly, Kumar Allady
Current dynamic testing practice to obtain pile total capacity will not yield optimum capacity due to the strain incompatibility between the side and tip resistances during driving. Superposition of e
Jan 1, 2018
-
Biodegradable Hydraulic Fluid in the Deep Foundation Industry - SynopsisBy S. H. Miller
Biodegradable hydraulic fluids can save tens or hundreds of thousands of dollars in fines and clean up costs in the event of a hydraulic fluid leak or spill. When properly selected, applied, maintaine
Jan 1, 2000
-
Connecting Railway Lines In Vienna With Underground Structures - SynopsisBy Rüdiger Wunsch
The new high speed Vienna - St.Pölten line and the Lainzer tunnel are to be connected to the existing Western railway line in Vienna. This involves building an underground cut and cover branching tunn
Jan 1, 2000
-
Bending Strength Of Threaded Micropile ConnectionsBy Steven R. Musselman
The bending strength and flexural stiffness of a micropile at its threaded connection is less than its intact strength and may fail due to thread slippage or by fracture through the pin (reduced cross
Jan 1, 2007
-
Monitoring Settlements Of A Vacuum Tower Atlas Refining Co., Shrevesport, LaBy Antal Partos
ATLAS Processing Company Shrevesport, LA initiated a major plant expansion in 1980. SITE Engineers, Inc. provided engineering consultation regarding the foundation of the vacuum unit. Four test boring
Jan 1, 1992
-
World Financial Center Foundations, New YorkBy G. Tamaro
The World Financial Center is situated on a 60,000 square meter site at Battery Park City at the southern tip of Manhattan Island. The foundations for the buildings and the related infrastructure pose
Jan 1, 1989
-
New Tacoma Narrows Bridge Caissons (3b3023d3-bc2c-4a9b-8e78-d499291fb07f)By R. Bruce Patterson
The New Tacoma Narrows Bridge is a classic suspension bridge founded on concrete caissons. Caisson construction was complicated by the proximity of the existing bridge piers, only sixty feet away. H
Jan 1, 2004