Ground Improvement Resulting From Installation Of Drilled Displacement PilesBy Timothy C. Siegel
Drilled displacement piles (also known as augered cast-in-place displacement piles or augured, pressure grouted displacement piles) are installed by the displacement of soil and subsequent placement o
Jan 1, 2007
-
Practice Of Arranging Drilling Piles In Subsiding GroundsBy Vladimir M. Korolev
The field studies conducted at the experimental-production sites allowed to develop the technology of arranging drilling piles in loess subsiding grounds over 25 m deep and over 250 mm in diameter, to
Jan 1, 2002
-
Depth Of Borings, Length Of Piles, Landslides, Erosion, And A Moose Hunt - A Case History Of A Comedy Of MistakesBy Bengt H. Fellenius
An upgrading and straightening of a highway included building a bridge across a small river. A routine site investigation was initiated to determine the conditions for designing the foundation of the
Jan 1, 1987
-
Current Pile Driving Practices In The United StatesBy Alan G. MacKinnon
The current piling practices in the U. S. have, to a great degree, been influenced by our founding fathers. When our constitution was written by the delegates from the original thirteen colonies, it w
Jan 1, 1987
-
Construction Of Large Scale Diaphragm Walling And Related Problems - Part One - The Building Of Diaphragm Walling - I. The General Situation Of The ProjectBy D. X. Xu
A pump station was constructed at the food of a steep mountain, very close to a riverside. To protect the pump station from being washed out, and to guarantee the stability of the steep hillside behin
Jan 1, 2010
-
Using Dynamic Pile Testing To Overcome Surprising Soil VariationsBy H. (Sam) Salem
A site investigation for a wide and tall hotel building, in the San Juan Bay area, Puerto Rico, indicated a soil profile of silty clay on sand, soft and loose enough to require piled foundations. The
Jan 1, 2008
-
Evaluation Of Pile Load Test ResultsBy Rasin Duzceer
In this paper, the results of pile load test on 24 piles from twelve sites are presented. The pile load tests were performed on 14 driven and 10 bored piles of varying diameters and lengths installed
Jan 1, 2002
-
Design Of Laterally Loaded Single Pile In Sand Near Slope - A Proposal For Subgrade Reaction FactorsBy Salim Mezazigh
Usually different methods for designing a single pile submitted to a lateral loading are available. They are based on theory of elasticity with the parameters E,v or subgrade reaction method using the
Jan 1, 2002
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
Effect of Free Standing Height on Rock Socketed Pile under Lateral LoadBy Prakash Annamalai Rangasamy, Muthukkumaran Kasinathan
"Infrastructure development like elevated expressways, metro train and flyover are required proper foundation system to carry heavy traffic loads/significant lateral load, especially in the presence o
Jan 1, 2015
-
Centrifuge Modeling Of Axial Failure Of Helical Piles In Cohesive SoilsBy Richard Schmidt, Lijun Deng, Mohamed Abdelaziz, Weidong Li
Helical piles are widely used as a foundation supporting a variety of different structures. Understanding the axial behaviour of helical piles is required to confirm the engineering design. Helical pi
-
Adapting Multiple Ground Improvement Techniques for Uniform Performance over Heterogeneous Natural and Modified OverburdenBy Michael J. Marasa
"Geotechnical engineering and construction primarily relies on the subsurface characteristics of the particular site; however, obtaining both accurate and precise information on those features is chal
Jan 1, 2017
-
Corroboration and Remediation Options"After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga
Jan 1, 2004
-
Session 27 "Grouted Cutoffs"By Trent Dreese
For critical velocities in gravel units we use Bush-Luckner, Sichardt, other empirical equations, and equations derived from laboratory experiments too. On the base of these, we compiled critical velo
Feb 10, 2003
-
Use Of Installation Effort To Evaluate And Design Drilled Displacement Piles In Fine-Grained SoilsBy W. Morgan NeSmith
A drilled displacement pile program was utilized for the expansion of an existing power plant in Cohasset MN adjacent to the Mississippi River. The drilled displacement (DD) pile is an innovative foun
Jan 1, 2008
-
DFI Model Piledriving Contractor ProposalWith respect to liability damages, claims and costs thereof relating to or ansmg out of contamination, special or non-special wastes, hazardous wastes or pollution in connection with the performance o
-
Doyle Drive – Extreme Pile InstallationBy Peter Faust
"The south access road to San Francisco’s Golden Gate Bridge, known as Doyle Drive or Presidio Parkway, needs to be replaced. Built in 1936, it is the primary highway and transit linkage through San F
Jan 1, 2012
-
Performance Of Toe-Grouted Large Bored Pile In Sand-Gravel Formation Of Chiang Mai City, Northern ThailandBy Narong Thasnanipan
Performance of diameter 1.5 m toe-grouted bored pile founded at depth 44 m in sand-gravel formation of Chiang Mai City is presented in this paper. Toe grouting was applied by using tube-a-manchette me
Jan 1, 2002
-
Corrosion Protection Of MicropilesBy Racquel Nottingham, Marc Mastrantuono
Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide
Oct 1, 2022
-
Installing And Testing Multi-bar High Capacity Rock TiedownsBy Andrew Pontecorvo, Steven Lowe, David Sposito
Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a