Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Mansueto Library: Drama below Ground and AboveBy Patrick J. Lydon, Gregory A. Terri
"The recently opened Mansueto Library at the University of Chicago campus was a 2012 OPA runner-up. The dramatic elliptical shaped dome of this structure tells only part of this structure’s story. The
Jan 1, 2013
-
Slurry Trench Design and Construction in Difficult ConditionsBy Peter Deming
"PART 2 OF 2 (CONTINUED FROM SUMMER 2006 EDITION) CONSTRUCTION ISSUES (cont’d) The Influence of Ground Conditions on Collapse Sand and gravel strata provide frictional resistance to support active ear
Jan 1, 2006
-
R C Harris Water Filtration Plant Expansion - Excavation Support Design, Installation and PerformanceBy Michael Cianchetti, Nadir Ansari, Matthew Janes
"PROJECT DESCRIPTIONThe R C Harris Filtration Plant underwent an expansion to install an underground sludge treatment capability consisting of a series of underground tanks within stepped excavations
Jan 1, 2007
-
Skin Friction In Shale: Results Of The Hwy. 81 Bridge, Yankton, SD Drilled Shaft Load TestBy Scott M. Mackiewicz
This project includes replacement of the historic vertical-lift span Meridian Bridge (U.S. Highway 81 over the Missouri River) that connects Yankton, South Dakota with rural Cedar County, Nebraska. T
Jan 1, 2008
-
The Practical Application Of Pile Reuse At Bow Bells House, City Of LondonBy Justin Phillips
The redevelopment of Bow Bells House in London has thrown up a number of challenges that will increasingly be faced by developers of congested sites. In the context of pile reuse this paper examin
Jan 1, 2008
-
Field Tests Of Soft Clay Stabilized By Stone Columns In Coastal Areas In China (325b7cc0-aff5-4a88-9f69-cd3dc2f57f1d)By Han Jie
The results of full scale plate load tests on stone columns on soft clay in coastal areas are presented in this paper. Four load tests were made, two of which were performed on the ground treated with
Jan 1, 1991
-
Lateral Load Testing Of Pile FoundationsBy Anne Lemnitzer
Full-Scale cyclic field testing was performed on a 3x3 pile group consisting of nine cast-in-drilled-hole (CIDH) reinforced concrete shafts and a comparable single-shaft in order to investigate group
Jan 1, 2010
-
Geotechnical Assessment Of The Manhattan Cruise Terminal Piers: Analysis Of Timber Piles In Soft Organic SiltsBy Rodrigue Karam
An assessment of the geotechnical conditions at the Manhattan Cruise Terminals (Piers 88, 90, 92 & 94) was conducted after excessive settlement and structural distress was reported at Pier 92. The pie
-
Assessment of Analysis Techniques for Multi-Plate Anchors in SandBy James P. Hambleton, Anastasia Nally
This work focuses on the numerical simulation of multi-plate anchor systems (e.g., helical anchors) in sand subjected to vertical loading. In assessing the stiffness and capacity of these multi-plate
Jan 1, 2019
-
Drilled Displacement Rigid Inclusions Support Port-Based Cement FacilityBy Morgan NeSmith
The Port of Palm Beach is a full-service landlord port in Riviera Beach, Florida. The port and its tenants process more than $14 billion in commodities. About 80% of these are exports, which makes the
Apr 1, 2023
-
Wick Drain Guide Specification (Method)"1.0 DESCRIPTIONThis work consists of furnishing all necessary labor, equipment, and materials to install prefabricated vertical (wick) drains in the ground in accordance with the Plans and as specifi
Jan 1, 2014
-
Construction-Induced Vibrations And Green Concrete: Literature Review And Case HistoryBy William M. Camp
Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s
Jan 1, 2010
-
Analysis and Behavior of Double Sheet Pile CofferdamBy Kamil Nuzha, Jianchao Li, Bashar S. Qubain
"The Philadelphia Water Department is rehabilitating Belmont Raw Water Basin. As part of this work, a 500-ft long, temporary cofferdam was designed to retain 35 ft of combined water and soil at the we
Jan 1, 2016
-
Toe Protection For H-Piles On Sloping Bedrock At Rainy River - SummaryBy Jon E. Bischoff
Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi
Jan 1, 1993
-
Mobilisation Of Skin Friction In Bored Piles In Hong Kong ? IntroductionBy R. A. Fraser
Large diameter (1.0 to 2.5m) bored piles have been widely used to support buildings and elevated roadways in Hong Kong. Most of these piles are founded on a hard bearing stratum such as granitic or vo
Jan 1, 2010
-
Permanent Soil Nail Earth Retention System, Stanley Hall Replacement Project, UC BerkeleyBy Pirooz Barar
The new Stanley Hall building will house the center for bio-engineering and technology research for the UC Berkeley campus. The structure is located at the northeast part of campus, adjacent to Donne
Jan 1, 2004
-
Piles Lateral Force CapacityBy Naim Noori Samie
Lateral force rsistance of piles is analytically investigated by dividing the pile length to 3 segments. The first segment (Zone I) models the load eccentricity with respect to the soil and the pile-d
Jan 1, 1996
-
St. Anthony Falls I-35W Bridge - Deep Foundation Monitoring Methods And Equipment For Bridge ConstructionBy Bryan C. Field
The proposed construction schedule for the St. Anthony Falls I-35W Bride challenged the abilities of the design-build teams to utilize the best and most efficient methods to meet Minnesota Department
Jan 1, 2009
-
Innovation In South East Asia - SynopsisBy Brian Littlechild
Whilst there is much innovative work being undertaken in South East Asia in the space allowed in this paper we have settled on describing in more detail the work that has been done with shaft grouting
Jan 1, 2000
-
S21-Berlin – Design And Underwater Construction Of A Covered Contrustion Pit Without Direct Accessibility From AboveBy Grischa Dette, Thomas Schröder, Holger Merski
For the construction of the tunnel for the new Berlin S21 light rail line, a construction pit had to be built below the crossing B 96 federal road. For this purpose, the construction pit M’ has been b
May 1, 2022