Value Engineering Through Systematic Site Investigation and Design Optimization – A Case StudyBy Lu Yitan, Frances Badelow, Manish Tiwari
"Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r
Jan 1, 1900
-
Evaluating Bending Failure Of Floating Soil-cement (Sc) Columns Under Road Embankments Using 3d FeaBy Sailesh S. Author
The current design method for soil-cement (SC) columns improved soft clayey ground under the highway embankments assumes a slip circle failure surface shearing through the columns and the soils using
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Data Collected and Lessons Learned from Load Test Program for ACIP Piles Supporting Highway BridgesBy Reinaldo J. Villa, Joshua C. Adams
The I-395/SR-836/I-95 reconstruction project is an $818-million design-build construction effort that includes construction of viaduct, segmental and signature bridges in Miami leading into Miami Beac
Sep 8, 2021
-
Role Advanced Technology - Resolve Inherent Dichotomy In High Strain Dynamic TestingBy Achyut Kumar Allady, Praveen Arumughan
NCHRP Synthesis 418 (2011) entitled, “Developing Production Pile Driving Criteria from Test Pile Data” details the occurrence of dichotomy between pile Skin resistance and pile Tip resistance mobiliza
May 1, 2022
-
Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface ChallengesBy Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo
Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue
Jan 1, 2019
-
Acceptance Of Timber Piles Based On Equivalent Driving EnergyBy Chu E. Ho
This paper describes a case history involving the use of the Equivalent Driving Energy concept for evaluating timber piles that failed to achieve the termination criterion traditionally based on final
-
Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze
"As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th
Jan 1, 2016
-
Improvements to Commonly Used Cutoff Wall SpecificationsBy Michael Kynett, Francke Walberg, Richard Millet, Khaled Chowdhury, Mary Perlea
"Cutoff walls are the most common seepage improvement measure for levee flood control projects throughout California’s Central Valley. Cutoff walls are widely used because they can be implemented with
Jan 1, 2015
-
Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on TrestleBy Babak Mamaqani, Pirooz Barar
The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority
Jan 1, 2019
-
A Three-Stage Assessment Process To Predict Risk Levels Due To Subsurface ConstructionBy Julie Clarke
In 1939 Dr. Ralph Peck criticized the Civil Engineering community for taking a bifurcated approach to the prediction of building damage due to subsurface geo-technical works. Specifically, he observe
Jan 1, 2009
-
Bluestone Dam Safety Assurance Program: An OPA Runner UpBy Jeff Hopple
"Bluestone Dam in Hinton, W.Va., along the New River, is owned and operated by the U.S. Army Corps of Engineers (USACE). Completed in 1949, the dam is 165 ft (50 m) tall, 2,048 ft (624 m) wide, and en
Jan 1, 2014
-
Comparison of Load Test Results between ACIP Piles Installed in Sand in Pre-Drilled Holes versus Conventional InstallationBy Tracy Brettmann, Shailendra Endley, Jason Leary, Shashank Valluru
"Augered Cast-in-Place (ACIP) piles have long been used for deep foundation support in sands due to their high capacity and speed of installation. Very little information exists on the effects on capa
Jan 1, 2017
-
Northeast Boundary Tunnel – Mount Olivet Road Drop ShaftBy Jeremiah M. Jezerski, Russell H. Lutch
The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed
Oct 1, 2022
-
Active Soil Nail Wall Underpinning Solution For The Bruce Museum ProjectBy Martin B. Hudson, Andrew K. Cho, Rolff B. Knobel, Les R. Chernauskas, Jonathan L. Ernst
ABSTRACT The Bruce Museum, located in Greenwich, Connecticut, is home to an extensive display of art and natural history exhibitions. A large addition was designed to be constructed adjacent to the mu
Oct 1, 2022
-
Bentonite Self-Hardening Slurry Mix Variations and Field Implementation MethodsBy Christopher R. Harris
"Considerations are presented for developing and implementing self-hardening slurry mix designs to be utilized in barrier seepage walls. Slag-cement-cement-bentonite (SCCB) slurries are the primary fo
Jan 1, 2016
-
Countermeasures Against Soil Liquefaction At Galataport Project In Istanbul, TurkeyBy Carlandrea Albonico, Salvatore Miranda
The paper describes an innovative geotechnical engineering solution that has been provided within the scope of the Galataport Project, in Istanbul, Turkey. Among all interesting geotechnical works inc
Nov 1, 2022
-
PMF Remediation of Oxford DamBy Scott Dodds
"The Oxford Hydroelectric Station was a unique project that incorporated a variety of dam strengthening methods to stabilize the facility in order to meet the standards required by Federal Energy Regu
Jan 1, 2005
-
Design Of Ground Improvement By Inclined Dsm Columns For Railway Embankment (Türkiye)By Emre Turk, Suat Gullu, Candan Gokceoglu, Ahmet Sirri, Asli Can
In this study, the ground improvement application applied under the live railway bridge's approach embankments in Sivas, Türkiye was investigated as a case study. The soil profile is mainly composed o
Oct 1, 2022
-
Dyna Force Sensors for Monitoring of Tension/Compression Forces in Ground Anchors & PilesBy Shahid Islam, Lucian Bogdan
"The maintenance of infrastructures has been of particular concern to the engineering community. As the world’s infrastructure expands and existing infrastructure ages, monitoring and evaluation of th
Jan 1, 2017