Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Carol pellet quality - a decade in review

    By D. Pearcey, S. T. Vessey, V. Hegde, J. Staples

    "Pellet quality has taken on a new dimension during the last ten years. Quality in the seventies was generally defined as adherence to certain physical and chemical specifications. Today, the talk is

    Jan 1, 1991

  • CIM
    Blast Improvements at the EKATI Fox Pit

    By Dwayne D. Tannant

    The Fox Pit at EKATI Diamond Mine reached a depth of approximately 150 m as of September 2005. The pit is designed with 11 m wide benches excavated using a double benching technique leaving 30 m high

    May 1, 2006

  • CIM
    Modern Copper Smelting and Converting Technology Applications, Development, and Improvement in China Copper Industry

    By Suping Yao, Chuanyu Jiang

    In the last decade, the copper industry in China has witnessed a significant change. The capacity and production of refined copper has grown remarkably from 1.5 million tons in 2002 up to 5.88 million

    Jan 1, 2014

  • CIM
    Evaluation of strainburst potential associated with excavation damage zone due to excavation method

    By Bo-Hyun Kim

    Outline ? Strainburst criteria and hypotheses adapted for this study. ? Influence of excavation method on rock mass properties. ? Excavation disturbance factors vs. deformation modulus, etc. ? Es

    Oct 1, 2010

  • CIM
    Dry drilling in underground production

    By E. M. De Souza

    "A scientific testing program, sponsored by the Mining Industry Research Organization of Canada (MIROC), was undertaken on the surface and underground facilities of Inca's Crean Hill Mine to inve

    Jan 1, 1992

  • CIM
    Implementation of a Hybrid Brattice to Control Dust Dispersion in Underground Coal Mine Faces

    By J. C. Kurnia

    Presence of fine dust in air causes serious health hazard for mine operators resulting in such serious problems as coal workers? pneumoconiosis and silicosis. Major sources of dust appear of course al

    Aug 1, 2013

  • CIM
    The Du Pont Sequential Blasting System

    By D. O. Tansey

    This paper will describe the mechanisms involved in delay blasting and how they are applied with the use of D.S.B. It will examine the control of potential damage resulting from detonations, and show

    Jan 1, 1979

  • CIM
    Heavy water-the CANDU moderator

    By R. J. Twigg, S. D. Chang

    "The production of heavy water, the moderator in a CANDU reactor, is examined following a flow sheet of a typical Canadian plant. The process involves the extraction and concentration of deuterium fro

    Jan 1, 1983

  • CIM
    Stability Analysis of Rib Pillars in Mechanized and Drill and Blast Excavations using Numerical Modeling

    By Navid Bahrani

    Introduction ? Today?s economic market is motivating underground mining companies to increase development advance rates and enhance their NPVs. ? For example, block cave mining involves development

    Oct 1, 2010

  • CIM
    Centrifuge model studies for backfill design at Westmin Resources Limited, H.W. Mine

    By R. J. Mitchell

    "Centrifuge modelling of earth structures is a well-proven technique for evaluating the performance of prototype structures using physical models. The applications of this technique have increased dra

    Jan 1, 1987

  • CIM
    Adaptation of a friction hoist system to a drum hoist system

    By J. R. Pronovost, P. M. Tiley, D. W. Watts

    "In 1980, J.S. Redpath Limited were retained by Dickenson Mines Limited to increase hoisting capacity from 700 to 1000 tons per day. The hoisting capacity of the present skip-over-cage system could no

    Jan 1, 1982

  • CIM
    Adaptation of a friction hoist system to a drum hoist system (ClM Bullet in, November 1982)

    By J. R. Pronovost, P. M. Tiley, D. W. Watts

    "In 1980, J.S. Redpath Limited were retained by Dickenson Mines Limited to increase hoisting capacity from 700 to 1000 tons per day. The hoisting capacity of the present skip-over-cage system could no

    Jan 1, 1982

  • CIM
    Truck dispatching and simulation methods in open-pit operations

    By P. K. Chatterjee

    "The operations of a large-scale open-cut mine are simulated to produce a user-oriented interactive digital model. SIMULA is chosen as the programming language and a sophisticated data base system is

    Jan 1, 1981

  • CIM
    Pioneer Days of Electrolytic Copper Refining in Japan: From the First Copper Refinery up to the Present Day

    By Phillip J. Mackey, Susumu Okabe

    Copper mining and smelting has been carried out in Japan for over 13 centuries and in fact stretching back into antiquity. In 1889, the first electrolytic copper refinery in Japan based on Elkington’s

    Jan 1, 2019

  • CIM
    Computer-assisted geological interpretation and orebody modelling

    By A. C. Moerman, C. W. Pelley, K. R. Notley

    "The software package described in this paper facilitates the handling of diamond drilling information in the creation and maintenance of a geological information database. Once entered, the drilling

    Jan 1, 1988

  • CIM
    Quantitative Modeling of a Neutralization and Co-Precipitation Process with Ferrihydite for the Simultaneous Removal of As (V) and Hg(II)

    By S. Hobo, M. Yagisawa, T. Uchida, C. Tokoro, T. Kato

    In this study, quantitative modeling was carried out for the treatment of simulated waste water containing As(V), Zn(II) and Hg(II) as toxic elements, and Fe(III), Na(I) and sulfate as coaxing ions. T

    Jan 1, 2016

  • CIM
    The Hydraulic Construction of Mine Tailings Dams

    By B. Hoare, H. M. Hill

    "SYNOPSISTailings volumes, disposal systems, effects of dam failures, construction materials, and concentrator process water volumes are discussed. Earth dams and tailings dams are discussed in detail

    Jan 1, 1970

  • CIM
    Air Granulation of Copper Slags for Iron Silicate Production Part 2: Drawing Parallels from Air Granulation of PGM Converter Slag

    By M. Mahdi, L. So, A. MacMillan, D. Metcalfe, J. Woloshyn, D. Sauter, N. Uys, JP. Janse van Rensburg

    For city smelters, with limited real estate, efficient slag cleaning furnaces followed by water granulation to produce an iron silicate product is the preferred process approach. Water granulation, ho

    Jan 1, 2019

  • CIM
    Conversion of a crushing plant to a gold mill in a copper smelter

    By G. Macfarlane

    "In 1985, a crushing plant, located in the feed preparation area of Kidd Creek's copper smelter, was modified. The plant, which originally had treated only copper-bearing materials for the smelle

    Jan 1, 1988

  • CIM
    A Review of Flotation Collectors: from Fundamentals to Practice

    By Xianglin Yang, Hong Zhong, Jingjing Xiao, Guangyi Liu

    "The selective adsorption of a flotation collector to a mineral plays a crucial role in enhancing the hydrophobicity of targeted mineral particles for attaching air bubbles in pulp. The recent progres

    Jan 1, 2016