    Robust image segmentation technique for rock fragmentation analysis

    By G. K. Mann

    Fragmentation analysis of blast or crushed rock material is a time-consuming and costly process. During the last two decades, the mining industry has been investigating image-based analysis systems as

    Jan 1, 2006

  • CIM
    Fine Grinding Investigations at Lake Shore Mines

    By The Staff

    THE object of the work was to increase the capacity of the plant and, if possible, to reduce costs of the actual unit grinding while doing so. The accompanying assays of an infra-sizer analysis of the

    Jan 1, 1940

  • CIM
    The Sampling System of Courier 300 Analyzer

    By Tapio Leskinen

    "l. IntroductionA reliable sampling system is the basis for an on-stream analyzer. This was realized in Outokumpu company when the development work of the Courier 300 On-Stream X-ray analysis system w

    Jan 1, 1976

  • CIM
    The Importance of Water Utilization for Maximizing Grinding Circuit Classification System Efficiency

    By Robert E. McIvor

    "The Functional Performance Equation for ball milling circuits allows us to isolate the circuit classification system efficiency (CSE) from the mill’s grinding performance. The factors which affect ci

    Jan 1, 2009

  • CIM
    Steam Genera ting and Power Plants, Company, Nova Scotia Light Limited

    By A. R. Harrington

    BEFORE discussing some of the technical aspects of the steam generating plants of Nova Scotia Light and Power Company, Limited, it might be of interest to go back through history and see the developme

    Jan 1, 1958

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    A study of copper smelting reverberatory furnace design and performance and methods available for increasing throughput

    By M. A. T. Cocquerel, M. G. Burcher, J. G. Eacott

    "This paper is based on work carried out to examine the feasibility of increasing the smelting rate of two oil-fired calcine-charged reverberatory furnaces . Various constraints prevented physical enl

    Jan 1, 1980

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • CIM
    Embedding Sustainability into Environmental and Social Impact Assessments

    By Louise Pearce

    ?Environmental and social impact assessments (ESIAs) are: ??process-driven and scientific processes ??The process entails a number of steps and procedures which result in obtaining a licenceto ope

    May 1, 2011

  • CIM
    The use of near surface materials in gold exploration Kirkland Lake area, Ontario

    By V. N. Rampton, C. F. Gleeson

    "Exploration results over three overburden drilling anomalies defined by the Ontario Geological Survey in 1981 in the Kirkland Lake area, Ontario are presented. The anomalies come from lowland areas w

    Jan 1, 1987

  • CIM
    Concepts for Remote Mineral Projects

    By L. J. Vincze

    The high cost of constructing mineral processing plants in remote locations warrants a close examination of the alternatives available for reducing the amount of on-site construction work. Among the a

    Jan 1, 1980

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part I Surface and Plant Operations

    By Euler De Souza

    The authors conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview potential hazards associated with backfill practice

    May 1, 2009

  • CIM
    The transition of mining methods at Anderson Lake Mine

    By Seppo Haapamaki

    "Since it started production in 1970, Anderson Lake Mine has experienced several radical changes in mining methods as a result of the physical characteristics of the ore zone along with the need for i

    Jan 1, 1988

  • CIM
    Results and Significance of Drilling Operations in the Athabaska Bituminous Sands

    By G. S. Hume

    Introduction Core drilling of the bituminous sands of northern Alberta has been carried on by the Mines and Geology Branch, Department of Mines and Resources, under the supervision of the Director,

    Jan 1, 1947

  • CIM
    Integration of gyratory crusher liner wear and operational performance for better crusher management

    By P. P. Rosario, D. M. Maijer

    The primary crusher is a key component in the comminution process applied in open pit mines. A collaborative research project between the University of British Columbia and Highland Valley Copper (HVC

    Jan 1, 2006

  • CIM
    Using 3D Computer Simulation to Improve Construction Project Planning

    By Patrick Cloutier

    Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i

    Aug 1, 2013

  • CIM
    Evaluation of the Efficiency of Several Airborne Electromagnetic Systems: Exploration Implications

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, K. Fountain

    "A comparison of data from INPUT, GEOTEM, and MEGATEM airborne electromagnetic (AEM) systems over the Aldermac deposit, Québec, Canada, was undertaken to evaluate the relative ef¬ficiency of these sys

    Jan 1, 2009

  • CIM
    Case Studies on Circuit Design Using Flotation Columns

    By Glenn S. Dobby, Glenn A. Kosick

    "Column flotation circuit engineering has matured to a good level of understanding regarding testing, scale-up and design. Some of the factors important to the process of implementing columns are addr

    Jan 1, 1995

  • CIM
    Treatment of Copper-Gold Ores

    By E. H. Smith

    "The El Indio mine treats a complex mixture of copper and gold/silver ores at its plant located in the high Andes in Chile. The plant utilizes conventional crushing, grinding and flotation to produce

    Jan 1, 1991

  • CIM
    Finite Element Evaluation of the Residual Stress Fields Obtained by Hole Expansion on 6061-T6 Aluminum Welds

    By K. C. Viveros, R. R. Ambriz, C. García, F. De Villèle, A. Talha, D. Jaramillo

    Cold hole expansion on base metal, weld metal and heat affected zone of 6061-T6 aluminum alloy welds was simulated by means of finite element method. Three dimensional compact test models with a previ

    Jan 1, 2014