Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Using real options to value and manage a mine expansion decision at a multi-zone deposit

    By R. Poulin, M. R. Samis

    Real options valuation is an alternative net present value framework that is able to incorporate both management flexibility and dynamic project risks. In this paper, management is considering the dev

    Jan 1, 2006

  • CIM
    The impact of rotary lobe blower seal upgrades at INCO’s Copper Cliff Nickel Refinery

    By J. Costigan, C. Corless

    In 1997, damage as a result of Castrol R40 entering the INCO pressure carbonyl plant carrier gas stream was becoming increasingly severe. The oil in the gas stream was adversely affecting both equipme

    Jan 1, 2000

  • CIM
    Structure Drilling in Oil Exploration, Southern Alberta

    By G. M. Furnival

    A PROGRAMME of structure drilling was commenced in the Southern Alberta Plains in June, 1943, for the purpose of determining the geological structure of the underlying sediments. More than 270 holes h

    Jan 1, 1945

  • CIM
    Understanding Electrical Energy Use at Copper Smelters

    By Lauri Pesonen

    "Although electrical energy use at copper smelters is typically about 15-20% of operational costs, it is something which is not very often analyzed and discussed at a detail level in technical papers

    Jan 1, 2017

  • CIM
    Comments on "The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches," by D. Marcotte and A. Boucher (29826150-91f9-4471-af0d-9edee6fe0c32)

    By Michel Dagbert

    "In their paper, Marcotte and Boucher (2001) cast some new light on the old problem of 2D estimation of vein-type deposits with thickness and grade of intercepts. Using a theoretical approach, some ex

    Jan 1, 2001

  • CIM
    Developing a Diamond Deposit in Saskatchewan

    By Shawn Harvey

    HIGHLIGHTS of STAR DIAMOND PROJECT Initial underground bulk sample 4,048 ct / 25,253 tonnes: US$135/carat: 3,050 ct March 2005 $116 million financing: Newmont takes 9.9% SGF Prefeasibility study

    May 1, 2006

  • CIM
    Plant Layout and Logistics

    By Jeffrey T. McGinty, Frank M. Wheeler

    Plant layout is the arrangement of equipment, process areas, departments, infrastructure, and support facilities. Plant logistics is the flow of parts, people, resources, and information throughout th

    Jan 1, 2015

  • CIM
    Comments on "The Estimation of Mineralized Veins: A Comparative Study of Direct and Indirect Approaches," by D. Marcotte and A. Boucher

    By Michel Dagbert

    "In their paper, Marcotte and Boucher (2001) cast some new light on the old problem of 2D estimation of vein-type deposits with thickness and grade of intercepts. Using a theoretical approach, some ex

    Jan 1, 2001

  • CIM
    Ontario?s Experimental Plant for Resource Recovery

    By B. I. Boyko

    As part of the Ministry of the Environment's Resource Recovery Program, the Province of Ontario has constructed a $13 million "Experimental Plant for Resource Recovery" in Metropolitan Toronto. T

    Jan 1, 1978

  • CIM
    Plasma Smelting of Unconventional Ores and Mine Residues for the Recovery of Precious Metals

    By T. P. Johnson, A. Vathavooran

    "Conventional mining operations can produce a wide range of wastes containing gold and other precious metals but which are less suitable for processing by traditional methods. There are also types of

    Jan 1, 2017

  • CIM
    Tire-Rim Interactions and Predictions at High G Loading

    By T. G. Joseph, M. Bolster, M. Curley

    "High tirerim loading on haul trucks operating on rough ground frequently manifests as mechanical separations and rim base cracking caused by cyclic fatigue. This paper provides an understanding of th

    Jan 1, 2019

  • CIM
    A Study of Sodium Oxalate Growth on Industrial Gibbsite with in Situ Optical Microscopy

    Of the many organic impurities present in Bayer liquor, sodium oxalate is known to have one of the most detrimental effects on the Bayer process. Because of its limited solubility, it will co-precipit

    Jan 1, 2014

  • CIM
    Monitoring Lining Wear on Submerged Arc Furnaces

    By P. Schmidt, M. Hopf

    Water-cooled parts of submerged arc furnaces are potentially dangerous, especially if molten matte or slag contacts the water. Explosion hazards and metal run-outs generate high costs for production l

    Jan 1, 2015

  • CIM
    Effect of Electricity Mix and Ore Grade on the Carbon Footprint of Chilean Cathodic Copper

    By C. Peña, C. A. Zaror, M. Bustamante, M. Vega

    The goal of this paper is to present the carbon footprint of Chilean cathodic copper, as a function of the electricity generation mix, ore grade, and process efficiency. Ore grades and acid leach-solv

    Jan 1, 2011

  • CIM
    Geological Mapping, Structural Problems and the Magnetometer

    By W. Keith Buck

    Introduction During World War II years, the magnetometer was used by various field parties of the Geological Survey of Canada, specifically in the search for chromite, a strategic war mineral. Throug

    Jan 1, 1951

  • CIM
    Sherritt Gordon Mine

    By W. J. Farley

    "The Sherritt Gordon mine is 100 miles north of The Pas in northern Manitoba. Copper-zinc ore was discovered on the property in 1922. Production began in 1931 and continued to June, 1932, when operati

    Jan 1, 1954

  • CIM
    The Critical Path Method and its Application at Mcintyre Porcupine Mines Limited

    By P. O. Parfitt

    The Critical Path Method has proved its usefulness at Mcintyre Porcupine Mines Ltd. This paper illustrates the techniques of network construction and analysis, and the application of the method at the

    Jan 1, 1966

  • CIM
    Development of an Air Permeability Test Method and Application to Underground Mining

    By S. Klemmer

    Potential problems associated with groundwater inflows are a major concern to many Saskatchewan mining operations. Rock mass behaviour and stability have been linked to groundwater inflow potential. A

    Nov 1, 2011

  • CIM
    Effect of grain refinement on the tensile and fatigue crack growth properties of sand cast AM60 magnesium alloy

    By M. Mahfoud

    The effect of grain refinement on the tensile and fatigue crack propagation behavior of sand cast magnesium alloy AM60B has been investigated in the present study, C2Cl6 in the amount of 0,3% was used

    Jan 1, 2005

  • CIM
    The Value of Oil Emulsion Drilling Muds in Canada

    By John C. Luck Jr.

    "DEVELOPMENT of oil emulsion mud dates back to the early days of rotary drilling when oil was added to the drilling mud solely for the purpose of freeing stuck drill pipe. After the drill pipe was fre

    Jan 1, 1954