Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Processing of Refractory Sulphides at Mantos de Oro, ChileBy John G. Peacey, Leoncio Sevilla G., Ford. Kevan J. R., Erling Villalobos C.
"Kinross Gold Corporation’s Mantos de Oro (MDO) gold/silver mine in northern Chile currently processes 15,000 tpd of oxide ores through a mill, whole ore cyanide leach plant followed by a Merrill-Crow
Jan 1, 2009
-
Alkaline Pressure Oxidation Barrick Mercur ExperienceBy P. T. O'Kane
"INTRODUCTION Wright Engineers Limited is active and has extensive experience in the design of pressure oxidation plants for the treatment of refractory gold ore and concentrate. In addition to the Me
Jan 1, 1989
-
Flotation of carbon values from blast furnace flue dust using statistical designBy P. K. Naik, B. Das
Flotation studies were carried out to recover carbon values from blast furnace flue dust containing ~30.34% carbon, 4.6% volatile matter (VM), and 65.03% ash. The variables chosen for the experiments
Jan 1, 2005
-
Concentrator Operations at Whitehorse Copper Mines LimitedBy D. Linzey
"History of Whitehorse Copper BeltThe first discovery of copper on the Whitehorse Copper Belt is reported to have been made by miners on their way to the Klondike in 1897. By 1899 the district had bee
Jan 1, 1977
-
Pressure Leaching Tests on Aphrodite Refractory Gold ConcentrateThe primary (sulphide) resources at Aphrodite are refractory in nature, requiring an oxidation process stage to be introduced to facilitate extraction of the gold. The company is investigating the use
Jan 1, 2014
-
Applicability, Challenges and Recent Application Experience of WLAN and Ethernet as Integrated Mine Communication BackboneBy Christoph Mueller
Broad band mine communication traditionally is characterized mainly by individual solutions, which have in common their long development phases and their high cost for development, operation and servi
May 1, 2006
-
Managing Tailings Facilities for Continual ImprovementBy Elizabeth Gardiner
Tailings and water management facilities are integral components of mine and mill operations. They must be managed for the long term to ensure that safe and environmentally responsible stewardship is
May 1, 2003
-
Optimisation of Coke Breeze Addition in Iron Ore PelletsBy G. Paquet, E. Godin
"Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as
Jan 1, 1986
-
Straight Tube Corner Fill of Aluminum Alloys Tubes: Experiments and Fe AnalysisBy C. Hari Manoj Simha, J. Gholipour, M. J. Worswick
Due to the high pressures involved in the hydroforming process, friction and lubrication play an important role and can affect formability of the material. Tubes of A1Mg3.5Mn aluminum alloy, of 76.2 m
Jan 1, 2006
-
Improved Production Forecasting through Geometallurgical Modeling at Iron Ore Company of CanadaBy Dave Bulled, Jim Thompson, Tim Leriche, Mark Blake, Troy Wilkie
"A commitment to a core testing, plant modeling and reconciling technique has shown substantial economic benefits to IOC in terms of accurate production forecasting, smoother operation of the mill, im
Jan 1, 2009
-
Microcel Column Flotation Scale-Up and Plant PracticeBy Roe-Hoan Yoon
"Industrial flotation columns often suffer from low recoveries and high maintenance requirements because of poorly-designed air spargers. The MicrocelTM bubble generators were developed at Virginia Te
Jan 1, 1994
-
Hot Workability of Mg Alloys ? Insights from Al AlloysBy H. J. McQueen
The irregular history of Mg wrought products is briefly described. The temperature and strain rate dependence of microstructural evolution, flow stress and ductility of Mg alloys in hot working, are d
Jan 1, 2006
-
Circuit Modifications at Westmin Resources Myra Falls OperationsBy C. Veloo
"Westmin Resources operates a mine/mill complex at Myra Falls and produces copper and zinc concentrates with minor associations of gold, silver, and lead from a polymetallic, massive sulphide orebody.
Jan 1, 1992
-
The Management of the Development Process of the Structure of Large-Scale Production and Transportation SystemsBy Buse Florian
This paper presents the specific features of the large-scale production and transportation systems (LSPTS), describing the main notions and characteristics of the LSPTS elements. A methodologically un
Oct 1, 2009
-
Toppling failure — A proposed analytic solutionBy J. I. Mathis
"The failure that was utilized for developing this model was a double bench-scale failure, approximately 20 m in height, in the Misery pit at BHP Billiton’s EKATI mine site. The bench that failed was
Jan 1, 2004
-
A First Step towards Gas Dispersion Management: Manipulation of Gas Distribution in Flotation CircuitsBy James A. Finch, Jason S. Doucet, Cesar O. Gomez
"Exercising control over the physical environment of flotation as a step towards process optimization is the driving force for characterizing gas dispersion in flotation cells, a subject of considerab
Jan 1, 2006
-
The Gorgas, Alabama, Experiment in Underground Gasification of CoalBy Milton Fies
Introduction The first experiment in underground gasification of coal in the United States was conducted at Gorgas, Walker county, Alabama, under a co-operative arrangement between the U.S. Bureau
Jan 1, 1948
-
Column Flotation Experience at the Sarcheshmeh Copper MineBy S. Banisi, M Nesari, J. A. Finch, N. Nobari, H. Javani
"The flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. Mechanical flotation cells are used in all sta
Jan 1, 2000
-
The Economics of Coal CleaningBy G. A. Vissac
IN THE preliminary design of a coal washery, the most important factor to evaluate is the ash content of the final product. The ash content permissible may be imposed by market demands, but, in the
Jan 1, 1957
-
Red Dog Lead Regrind Circuit OptimizationBy Brigitte Lacouture, Yeen Shien Hwang, David Lin
"A baseline survey of the partially open lead regrind circuit at Red Dog Mine indicated poor regrind efficiencies for the three parallel 450 HP tower mills. Driven by the high energy cost and the pote
Jan 1, 2005