Technology for Mine Water Management General ReportThis session comprises six papers: One paper is specifically on advances in drilling techniques, a paper presents a classification for water inrush rich with corresponding guidelines for protection,
Jan 1, 1988
-
Electrolytic Zinc Plant Operations at Port PirieBy Martin JD, McNicol JH
The electrolytic zinc plant at Port Pirie South Australia, was designed and constructed to treat zinc oxide fume recovered by treatment of lead blast furnace slag in two fuming furnaces, The plant
Jan 1, 1975
-
Backfill for Bench Stoping OperationsBy K Kuganathan
This paper describes a new methodology that can be applied to compare several bench extraction strategies requiring backfill. The method is applicable at the planning or operational stages and can be
Jan 1, 1998
-
Co-Disposal of Coarse Coal Reject with Sand Mining Reject for the Control of Metal Concentration in Runoff WaterBy McQuade CV, Riley SJ
Acid mine drainage is an unavoidable consequence of some coal mining operations. Typically runoff pH is below 3.5 and at these pH levels heavy metals are mobilised. Leachate from coal reject dumps may
Jan 1, 1998
-
Charge Flow in Pulp LiftersEfficient performance of pulp lifters to discharge ground rock is critical to the effective performance of SAG and AG mills. The paper covers developments in the design of pulp lifters and associated
Jan 1, 2004
-
Fordertechnik Dewatering ScreensThis paper will discuss Fordertechnik dawatering screens and their application in process industries. Fordertechnik screens were designed for the dewatering of deslimed, wet fines materials encoun
Jan 1, 1984
-
Northland Halloysite ù Past, Present and FutureBy S Marsters
Imerys Tableware New Zealand Limited has mining rights to four deposits of halloysite, which are located about 203 km north of Auckland, New Zealand. These primary deposits were formed by the hydrothe
Jan 1, 2002
-
Continuous Improvement at a Large Open Pit OperationOne of the more recent developments within the mining industry has been the adoption of formal continuous improvement programs. A continuous improvement (CI) program was launched across Kalgoorlie Con
Jan 1, 2004
-
Benchmarking - Making Best Practice Common PracticeBy S Williams
The primary objective of most mining projects is to maximise the value delivered to the companyÆs shareholders. Achieving best practice performance and maintaining competitive advantage through low-co
Jan 1, 2009
-
Magnadets Theory and ApplicationBy Walker V
The 'MAGNADET' to provide a safe enhanced protection extraneous currents, electricity and radiodetonator was designed electric detonator with against the effects of current leakage, static f
Jan 1, 1985
-
The Behaviour of Cobalt During Nickel Smelting and ConvertingThis paper outlines the thermodynamic and mass balance principles which affect the distribution of cobalt between matte and slag during the pyrometallurgical treatment of nickel-copper sulphides and c
Jan 1, 1994
-
Secondary Grinding Circuit Optimisation for the Copper Concentrator of Mount Isa MinesBy M Magee, D Way
The Mount Isa Copper Concentrator was commissioned in 1973. In 1991, two autogenous grinding mills were installed replacing two stages of crushing, one stage of rod milling and one stage of primary ba
Jan 1, 2004
-
Telfer Train 1 Copper Flotation Circuit ReconfigurationBy A Crawford, P Manton
Telfer is a gold/copper operation, currently operating one open pit mine and one underground mine. The ore processing plant consists of two parallel trains involving semi-autogenous mill, ball mill an
Jan 1, 2009
-
The Use of Electronic Detonators as a Key to Reducing Overall Mining CostsDrill and blast operations account for 12 - 15 per cent of total mining costs. This paper looks at a comparison between electronic detonators and non-electric detonators, focusing on the cost benefits
Jan 1, 2008
-
Statistical Experimental Design Approach in Coal BriquettingBy S Pfaff, R Rajic
In the case when the number of independent variables is greater, a careful design for carrying out tests has to be made in order to obtain, with the smallest possible number of tests, as much as possi
Jan 1, 2003
-
Furnace Design for Modern, High-Intensity Pyrometallurgical ProcessesBy B, J Bianchini, N Voermann, C Crowe
Operational and economic imperatives in the metallurgical industry have led to numerous advancements in furnace design. Modern furnaces provide high production rates, high percentage online time, long
Jan 1, 2002
-
The PACMANUS Seafloor Sulfide Field, Eastern Manus Basin, Papua New GuineaBy J M. Parr, C J. Yeats
Discovered in 1991 by combined plume detection and bottom-tow photography (Binns and Scott, 1993) and for some years thereafter the highest tenor mineral occurrence known on the ocean floor, the PACMA
Jan 1, 2008
-
Ore Block Optimisation for Open Pit Grade ControlBy M B. McKevitt, W J. Shaw
The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blendi
Jan 1, 2009
-
Mine Planning Succeeds on a Dedicated MinicomputerBy McDonald E, Clifford PJ
A mine planning system comprises all elements necessary to carry out the full range of mine planning activities from exploration to operations control. The application of computers as part of a mi
Jan 1, 1983
-
State and Development Trends of EDP-Based Operation Monitoring and Remote Control in the Coal Mining Industry of the Federal Republic of GermanyBy Stuedel J
Starting from comprehensive programme systems for monitoring tasks of any kind, this paper follows the steps of the programme system hierarchy from top to bottom. The monitoring and control centres fo
Jan 1, 1985