Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals provinceBy A Harburg, A Dendys, G Green
Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope
Aug 2, 2023
-
Characterisation of the Iron Bridge magnetite projectBy B Godel, E R. Ramanaidou, M Verrall
Fortescue Metals Group Ltd Iron Bridge (IB) operation is a magnetite deposit located in the Pilbara region of Western Australia situated around 145 km south of Port Hedland. This Mesoarchean deposit b
Sep 18, 2023
-
Systems thinking and its need in the workforce of tomorrowBy D Brown, K Markovic
The world is becoming an increasingly complex environment to operate within. Adoption and evolution of technology is occurring at a rapid pace and operating spaces are growing in interconnectedness an
Sep 1, 2024
-
Use of fly-ash slurry in backfill grouting in coalminesBy X Z. Sun, N Jiang, J H. Zhao, C X. Wang, L Y. Bai
In backfill grouting for underground coalmines, the filling materials strengthen the caving rock and support the overlying strata to reduce surface subsidence. The broken roof strata fail and collapse
Nov 29, 2022
-
Development of rock testing system with changeable stiffness and test research on failure characteristics of rockBy Y H. Zhu, X X. Tang, Y C. Yin, M L. Xing
Based on the stiffness theory, the stiffness difference and energy supply of surrounding rocks are important inducing factors for strain burst. However, due to the lack of multi-level low stiffness te
Nov 29, 2022
-
Ground support rationalisation at Golden GroveBy R Varden
This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications
Mar 29, 2023
-
The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope DesignBy A Muhairini, M Eggers, J Smith, H Baxter
Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au
Jul 13, 2015
-
Water balance management 101By M Rafty, C Lane
Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the
Jul 23, 2018
-
Whole of mine planning – Evolution Mount Rawdon case studyBy M L, G Maddocks, A Ferrier, ers, A Forbes
Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr
Aug 2, 2023
-
Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?By M Berry
Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w
Aug 18, 2014
-
Scoping of Feasibility StudiesHow often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I
Jan 1, 1998
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Using a Schmidt hammer to estimate geotechnical properties of carbonate rocks in IsraelBy N Trabelsi, D Bakun-Mazor, Y Ben-Ari
As part of a comprehensive project to develop a remote sensing tool for evaluating the mechanical properties of rocks, one must obtain a rapid indication of these properties using conventional field m
Nov 29, 2022
-
Rehabilitation of Pasminco Broken Hill Mine North OperationBy J Burgess, G Scanlan
In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem
Jan 1, 1998
-
A Comparison of Mineralogy Development in Haematite and Magnetite PelletsBy M-E Boucher
While the haematite concentrates produced in Eastern Canada and the magnetite concentrates that Australia will soon be producing are different feed materials, the pellets they produce have similar phy
Jan 1, 2007
-
How Robust Are Your Asset Integrity Management Processes?By R Cannings, J Wallace, M McCamley
The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per
Jun 22, 2016
-
Progress in the Knowledge of Granite Cutting with Diamond WireBy Manca PP, Lassandro R, Caranassios A, Massacci G, Ciccu R
The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contributio
Jan 1, 1992
-
Case studies for integrating rehabilitation planning with mine planning in strip miningBy I Neilsen, A Walker, A Hooper
Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H
Jul 25, 2018
-
Advancing slam in underground mines – a unique marker-based approach for enhanced navigation and mappingBy B P. Banerjee. S Raval, P M. Ranasinghe
Simultaneous Localisation and Mapping (SLAM) is an important technology that enables autonomous robots to navigate independently and create detailed, real-time maps of their surroundings. This capabil
Sep 1, 2024
-
Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learnedBy A Castillo, K Wiese, L Panduro Robles
For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr
Aug 24, 2022