Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design and calibration of a climate resilient Type B (adapted) sediment basin at the Dugald River Mine in the north-west Queensland minerals province

    By A Harburg, A Dendys, G Green

    Dugald River Mine (DRM) is located approximately 85 km north-east of Mount Isa, and 65 km northwest of Cloncurry, in the north-west Queensland Minerals Province of Australia. DRM is an underground ope

    Aug 2, 2023

  • AUSIMM
    Characterisation of the Iron Bridge magnetite project

    By B Godel, E R. Ramanaidou, M Verrall

    Fortescue Metals Group Ltd Iron Bridge (IB) operation is a magnetite deposit located in the Pilbara region of Western Australia situated around 145 km south of Port Hedland. This Mesoarchean deposit b

    Sep 18, 2023

  • AUSIMM
    Systems thinking and its need in the workforce of tomorrow

    By D Brown, K Markovic

    The world is becoming an increasingly complex environment to operate within. Adoption and evolution of technology is occurring at a rapid pace and operating spaces are growing in interconnectedness an

    Sep 1, 2024

  • AUSIMM
    Use of fly-ash slurry in backfill grouting in coalmines

    By X Z. Sun, N Jiang, J H. Zhao, C X. Wang, L Y. Bai

    In backfill grouting for underground coalmines, the filling materials strengthen the caving rock and support the overlying strata to reduce surface subsidence. The broken roof strata fail and collapse

    Nov 29, 2022

  • AUSIMM
    Development of rock testing system with changeable stiffness and test research on failure characteristics of rock

    By Y H. Zhu, X X. Tang, Y C. Yin, M L. Xing

    Based on the stiffness theory, the stiffness difference and energy supply of surrounding rocks are important inducing factors for strain burst. However, due to the lack of multi-level low stiffness te

    Nov 29, 2022

  • AUSIMM
    Ground support rationalisation at Golden Grove

    By R Varden

    This paper summarises the process taken to simplify 35 ground support standards accounting for the multiple development profiles, dynamic geotechnical environment and the practical safety implications

    Mar 29, 2023

  • AUSIMM
    The Effect of Carbonate Alteration on Detrital Mass Strength and Implications for Geotechnical Slope Design

    By A Muhairini, M Eggers, J Smith, H Baxter

    Detailed geochemical analysis of cored and non-cored drill hole data was used to characterise and model the Cenozoic detrital valleys of several deposits within the southern Pilbara region, Western Au

    Jul 13, 2015

  • AUSIMM
    Water balance management 101

    By M Rafty, C Lane

    Managing water is a key aspect of mining, whether a site is in water surplus or water deficit. Water in tailings storage facilities (TSFs) needs to be managed carefully to maximise the density of the

    Jul 23, 2018

  • AUSIMM
    Whole of mine planning – Evolution Mount Rawdon case study

    By M L, G Maddocks, A Ferrier, ers, A Forbes

    Evolution’s Mount Rawdon Operation (MRO) produces gold and silver through open pit mining methods. The mining operations are scheduled to be completed in FY24 (Financial Year 2024), after which low-gr

    Aug 2, 2023

  • AUSIMM
    Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?

    By M Berry

    Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w

    Aug 18, 2014

  • AUSIMM
    Scoping of Feasibility Studies

    How often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I

    Jan 1, 1998

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Using a Schmidt hammer to estimate geotechnical properties of carbonate rocks in Israel

    By N Trabelsi, D Bakun-Mazor, Y Ben-Ari

    As part of a comprehensive project to develop a remote sensing tool for evaluating the mechanical properties of rocks, one must obtain a rapid indication of these properties using conventional field m

    Nov 29, 2022

  • AUSIMM
    Rehabilitation of Pasminco Broken Hill Mine North Operation

    By J Burgess, G Scanlan

    In 1993 after over 110 years of mining operations, production ceased at the Broken Hill North Mine. Following the cessation of operations a rehabilitation program was developed to satisfy the requirem

    Jan 1, 1998

  • AUSIMM
    A Comparison of Mineralogy Development in Haematite and Magnetite Pellets

    By M-E Boucher

    While the haematite concentrates produced in Eastern Canada and the magnetite concentrates that Australia will soon be producing are different feed materials, the pellets they produce have similar phy

    Jan 1, 2007

  • AUSIMM
    How Robust Are Your Asset Integrity Management Processes?

    By R Cannings, J Wallace, M McCamley

    The mining industry continues to have major disasters (Bingham Canyon, Pike River, Upper Big Branch, Mount Polley and Samarco), which often have a devastating effect on the enterprise, in terms of per

    Jun 22, 2016

  • AUSIMM
    Progress in the Knowledge of Granite Cutting with Diamond Wire

    By Manca PP, Lassandro R, Caranassios A, Massacci G, Ciccu R

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contributio

    Jan 1, 1992

  • AUSIMM
    Case studies for integrating rehabilitation planning with mine planning in strip mining

    By I Neilsen, A Walker, A Hooper

    Final landform planning in Deswik software was used to determine if integration into the mine plans could achieve better closure outcomes. Using the dump surface outputs from the Deswik Landform and H

    Jul 25, 2018

  • AUSIMM
    Advancing slam in underground mines – a unique marker-based approach for enhanced navigation and mapping

    By B P. Banerjee. S Raval, P M. Ranasinghe

    Simultaneous Localisation and Mapping (SLAM) is an important technology that enables autonomous robots to navigate independently and create detailed, real-time maps of their surroundings. This capabil

    Sep 1, 2024

  • AUSIMM
    Integration of real-time, online, individual cyclone measurement at Cerro Verde – challenges and lessons learned

    By A Castillo, K Wiese, L Panduro Robles

    For decades, organisations worldwide have been working to overcome challenges associated with new technology adoption while keeping up with rapid growth, development, and globalisation. In minerals pr

    Aug 24, 2022