Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    High Performance Throw Blasting With i-konTM Electronic Detonators in an Environmentally Sensitive Area at Stratford Coal, NSW, Australia

    By T Goswami, M Edmondson

    Henry Walker Eltin (HWE) are the mining contractors for Gloucester Coal at Stratford mine, which is in an environmentally sensitive area in the Avon Valley, NSW, Australia. Normal blasting at Stratfor

    Jan 1, 2003

  • AUSIMM
    Pneumatic Flotation: A Reliable Procedure for a Correct Plant Layout

    By Sobek S, Lotzien RM

    Although the conventional procedures for designing agitator flotation plants are well-known and reliable, little experience for designing modem pneumatic flotation plants has been gained up to now.

    Jan 1, 1993

  • AUSIMM
    Mine Ventilation at Renison Limited

    By Ross T. J

    Renison Limited operates an underground tin mine employing both cut and fill and open stope methods, at Renison Bell on the west coast of Tasmania. Mining in the region commenced in the 1890'

    Jan 1, 1988

  • AUSIMM
    Operating a Continous Haulage System at United Colliery

    By Boyling A

    United Collieries Pty Limited is an Australian mining company operating one underground coal mine, United Colliery at Warkworth in the Hunter Valley district of New South Wales. Centrally positioned,

    Jan 1, 1998

  • AUSIMM
    Data Collection and Management in Underground Engineering

    This paper presents a new idea in field data collection for geological and scientific data. The computer keyboard has been replaced by a barcode wand driving a spreadsheet style editor. To use the ful

    Jan 1, 1993

  • AUSIMM
    XRD and TEM Studies of Carbon Structure to Understand its Dissolution Performance During Ironmaking

    By Gao K, Wu C, Xia J, Burdett M

    X-ray diffraction (XRD) and transmission electron microscopy (TEM) techniques have been adopted in this study, to investigate the structure of carbonaceous materials such as graphite, brown coal cha

    Jan 1, 1996

  • AUSIMM
    Simulation of Water Quality in Underground Gold Mine Service Water Circuits

    By Wiechers HNS

    In China the hydrogeological type of solid mineral deposits can be divided into A. Mineral deposits with fissure water; B. Mineral deposits with pore water; and C. Mineral deposits with karst water.

    Jan 1, 1988

  • AUSIMM
    Strategies to Reduce Losses Arising From Poor Discrimination of Ore and Waste

    Most orebodies have one or more boundaries which are gradational, where the decision to stop mining is based on an economic cut-off. To maximise profit, this cut-off grade must be chosen correctly. It

    Jan 1, 1993

  • AUSIMM
    Some Considerations in Column Flotation Pilot Plant Testwork

    By Dunlop G. A, Cantrell R. A

    The metallurgical and engineering requirements that form the basis for planning column flotation Pilot Plant testwork are reviewed. Pilot plant operating issues are discussed and a basis for the test

    Jan 1, 1992

  • AUSIMM
    Al Assisted Coal Interpretation Techniques

    By Godresse M, Turczynski G. P J, Driver I. J, Low G, Ozawa N

    Geological evaluations of coal deposits have been traditionally undertaken in a somewhat manual manner. Information is collected downhole by chip sampling, coring and using downhole geophysical log

    Jan 1, 1995

  • AUSIMM
    Tick Hill Gold Mine - Development and Operation

    The Tick Hill Gold Mine is situated approximately 110 kilometres south of Mount Isa, and 14 kilometres north of the township of The Monument. It was discovered in October 1989 by Mount Isa Mines Explo

    Jan 1, 1993

  • AUSIMM
    Feasibility Study on Cemented Backfill in Longwall Coal Mine for Surface Subsidence Control

    By Caigen Wang, Wending Ma, Xiexin Mi

    The urgent need for the control of surface subsidence caused by longwall coal mining in densely populated areas of China has led to a feasibility study on the effectiveness of longwall goaf cemented b

    Jan 1, 1998

  • AUSIMM
    Managing Technical Risk at the Ridgeway Sublevel Caving Mine

    By G Power

    The successful implementation of sublevel caving (SLC) at Ridgeway Gold Mine (Ridgeway) requires the technical aspects of caving and flow behaviour to be understood. Cave propagation must be controlle

    Jan 1, 2003

  • AUSIMM
    A Potential Use of Oxygen and Carbon Isotope Zonations of Wall Rocks in Prospecting Skarn Pb-Zn Deposits at Kamioka, Central Japan

    By Matsuhisa Y, Sakurai W, Shimazaki H, Peiming H, Fukahori Y

    Oxygen and carbon isotope mapping of hydrothermally altered wall rocks was applied to the blind ore prospecting of skam Pb-Zn deposits in the Kamioka mining district, central Japan, where the wall ro

    Jan 1, 1995

  • AUSIMM
    Tracking and Quantifying Value - From æMine to Mill ÆImprovement

    By S Morrell, D Clark

    æMine to MillÆ improvement involves optimising the chain of rock breakage processes from the in situ rock in the mine to the output of the concentrator. A growing number of paper studies and case hist

    Jan 1, 2002

  • AUSIMM
    Rehabilitation Planning For The Yallourn East Field

    By Brown K, Francis D

    The Yallourn Open Cut Mine has recently commenced mining operations in the new East Field which will supply the 1450MW Yallourn W Power Station for the rest of its 30 year design life. The authors des

    Jan 1, 1992

  • AUSIMM
    The Manufacture of Seamless Steel Tubing in Australia

    The scope of this paper has been restricted to the manufacture in Australia of seamless steel tubing, as the subject of buttweld tubing has already been dealt with by A. N. Hamilton in a paper deliver

    Jan 1, 1947

  • AUSIMM
    Technical Note - The Effect of Various Types of Solid carbonaceous Reductants on the Rate of Fuming of Zinc from Lead Blast Furnace Slag at 1250¦C

    By Gordon A. R

    The effect of various types of solid carbonaceOlls reductants on the rate of fuming of zinc from lead blast furnace slag was investigated at I250°C.The results of the laboratory experiments indic

    Jan 1, 1992

  • AUSIMM
    Bucket Wheel Excavators for Latrobe Valley

    The paper describes the development leading to the bucket wheel excavator systems now used in the Latrobe Valley and refers in particular to the new S.E.C.V. dredgers Nos. 14 and 15 which will be

    Jan 1, 1982

  • AUSIMM
    Finding a Mine Within a Mine - The Mount Isa Lead/Zinc Case Study

    By M D. Rosengren, G Gregor, M F. Young

    Over the last 15 years the silver/lead/zinc ore treated at Mount Isa became increasingly complex and lower grade. Metal recoveries dropped dramatically, causing a serious decline in profitability. The

    Jan 1, 1998