Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Multiskilling at the Hellyer Concentrator

    By Campbell J

    After eighteen months of discussions with employees and their trade unions, multiskilling was introduced at the Hellyer concentrator in early 1989, coinciding with the plant commissioning. Multiskil

    Jan 1, 1991

  • AUSIMM
    The Condensation of Aluminum Chloride Vapour in a Stirred-Bed Condenser (ca8bfe5e-d26c-4002-8bbe-e3590283e808)

    Applications of chlorine metallurgy to the extraction of metals often result in the production of volatile metallic chlorides, most of which condense directly to a solid phase at 1 atm pressure. A sti

    Jan 1, 1971

  • AUSIMM
    Planning and Cost Criteria for Mining Infrastructure

    By Mahony BK

    This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans

    Jan 1, 1983

  • AUSIMM
    Blasting Rock to Suit Stringent Underground Fill Requirements

    Recent analysis of backfilling material has shown that a finer size distribution is preferable for stope filling. In order to increase crusher throughput and pit productivity, a reassessment of the

    Jan 1, 1995

  • AUSIMM
    Isotope Geochemistry of the Black Ridge Gold Deposit, Clermont, Central Queensland

    By Dobos SK

    The Black Ridge Gold Deposit is located in the northern part of the Clermont Goldfield, which is situated at the boundary of the Bowen Basin and Anakie Inlier, Queensland. The goldfield comprises a se

    Jan 1, 1990

  • AUSIMM
    Water Supply at the Warrego Mine, Tennant Creek, Northern Territory (533fe125-f87f-451f-a8a7-f8cc9efcc262)

    By Ride G

    The provision of a water supply is a major consideration in planning mining developments particularly in remote areas. The evaluation and development of adequate water supplies in and areas of Aust

    Jan 1, 1980

  • AUSIMM
    A Resume of the Results of Iron Ore Exploration in Western Australia

    The results of iron ore exploration in Western Australia between '1961 and 1964 are outlined, with particular.reference to the Hamersley Iron Province. Exploration during: these three years has

    Jan 1, 1964

  • AUSIMM
    Trends in Development Project Finance

    Financial markets are subject to constant change and project finance, as a product within these markets, adapts and will continue to adapt with those changes. A meaningful discussion of these adap

    Jan 1, 1983

  • AUSIMM
    Geotechnical Shaft Reconciliation at Oyu Tolgoi, Mongolia

    By A Purvee, M F. Lee, L J. Mollison

    Oyu Tolgoi is a large Cu-Au porphyry deposit in the south Gobi desert, Mongolia. The first of several deep, large-diameter, concrete-lined shafts, Shaft 1, is nearing completion. It will have a finish

    Jan 1, 2008

  • AUSIMM
    Geomechanics Considerating In Optimistc The Use Of Mine Fill Part B

    By Kurzeme M, Willoughby D. R

    Current research at the CSIRO, Division of Applied Geomechanics, into the mode of response of fill as a structural component has been based on model tests for prediction of behaviour and field obs

    Jan 1, 1973

  • AUSIMM
    An Introduction to a Revolutionary Low Density Bulk Explosive for Surface Blasting Operations

    By Hunsaker R. D

    The description, characteristics, advantages and application of a new bulk explosive for medium to large diameter dry blasthole conditions is described. A brief outline of the delivery system for th

    Jan 1, 1995

  • AUSIMM
    Apatite from Alkaline Complexes û Geological Aspects, Behaviour in Mineral Processing and Characterisation Techniques

    By M M. M LT Tassinari, A B. Braz, L M. SantÆAgostino, C Ulsen

    Several mineral resources have been recognised to alkaline igneous rocks. In general, these mineralisations present low P grades, so a complex concentration process is required to achieve commercial g

    Jan 1, 2008

  • AUSIMM
    Applications of Evolutionary Algorithms in Planning and Design of Mines

    By C W. Lu, Y F. Chen, M J. Lian, W W. Guo

    This paper proposes a set of new approaches for the optimisation of planning and designs in mines by means of evolutionary algorithms, which include the determination of ore grade, layout of developme

    Jan 1, 2003

  • AUSIMM
    Towards a Medium Behaviour Based Performance Modelfor Coal-Wahshing Dense Medium Cyclones

    By Lyman GJ, Davis JJ

    Models which have been presented in the literature consider only selected aspects of dense medium cyclone operation, are empirical in nature and generally relate only to severely limited ranges of

    Jan 1, 1987

  • AUSIMM
    An Investigation of Ammonium Nitrate Loss to Mine Discharge Water at Diavik Diamond Mines

    By G MacDonald, B Forsyth, D Corkery, T

    An investigation was carried out at Diavik Diamond Mines Inc (DDMI) to identify and quantify the mechanisms through which ammonium nitrate (AN) was entering the mine discharge water. The goal was to d

    Jan 1, 2007

  • AUSIMM
    A Practical Method of Approach to the Problems of Mineral Flotation

    Response of a mineral to anionic and cationic flotation reagentsvaries with the nature of the mineral and the particle size. A ruleis deduced for the selection of the correct type of reagent, which le

    Jan 1, 1963

  • AUSIMM
    Trading Water Access Entitlements in Queensland

    By A Stasi, B Brice

    Water is a limited and precious resource in Australia. Because of the increasing demand for water from all sectors of the economy and the variability in supply, efficient management of water resources

    Jan 1, 2006

  • AUSIMM
    Nuclear Magnetic Resonance Spectroscopy Studies of Mineral Surfaces ù Application in the Froth Flotation

    By O N. Antzutkin, A V. Ivanov, W Forsl

    Polycrystalline and surface complexes (at synthetic sphalerite, ZnS, and galena, PbS) of zinc(II) and lead(II) ions with eight different O,OÆ-dialkyldithiophosphate (Dtph) substances have been prepare

    Jan 1, 2005

  • AUSIMM
    The Geology and Gold Mineralisation of the Batman Deposit, Mt Todd Project, NT

    By Hein K. A A

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • AUSIMM
    Structure of the Integrated Mine Control System at Kemi Chrome Mine

    By Toivanen R-M, Leinonen O, Pekkarinen H

    This paper presents developments in designing an integrated mine control system at Kemi mine. The aim of this paper is to present the general structure of the system and to outline some features of

    Jan 1, 1998