Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Live Track Railroad Tunnel Repair and Clearance Improvement in the United States

    By J Schrank

    Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking

    Sep 17, 2014

  • AUSIMM
    Modelling and Design of Block Caving at Bingham Canyon

    Open pit mining at Bingham Canyon commenced in 1904 and about two billion tonnes of ore have been extracted since then. There remain just under one billion tonnes of ore in the pit and this will be mi

    Jan 1, 2000

  • AUSIMM
    The Use of Rezoning Techniques to Model Historic Tailings Failures

    By D Reid

    Run-out analyses of tailings storage facilities are typically undertaken using methods based on rheological theory. These are reasonable techniques to model the behaviour of tailings that, through sig

    Jul 27, 2015

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    Integrated process modelling for the Kalgoorlie Nickel Smelter

    By G Sartor, A Rich, D Grimsey, R Forzatti, M White

    An in-depth process model was developed for the pyrometallurgical, off-gas systems and water balance of the Kalgoorlie Nickel Smelter. This model was used to assess plant capacity with changing concen

    Aug 21, 2024

  • AUSIMM
    Is Every Mine a Pilot?

    By G I. Lumley

    ‘Every mine is a pilot’ is an attitude which encourages the mining paradox of optimistic mine plans and equipment under performance; propped up by an environment lacking accountability. The premise th

    Jun 22, 2016

  • AUSIMM
    Setting for Success – Private Equity Exploration and Mining Project Buy-in to Listing and Divestment

    By A Keogh, P Allen, P Stoker

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Private equity (PE) firms are comparatively free of mandatory requirements for the level an

    Mar 18, 2015

  • AUSIMM
    A Managed Approach to Project Insurance

    Historically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th

    Jan 1, 2007

  • AUSIMM
    The Constructions of Sewage Tunnel by Tunnel Boring Machine with Slurry Transport System

    By Matsuo T, Uga Y

    The tunnelling work to construct a sewage trunk line designed by the Sewage Bureau of Kobe City along north side slope of Rokko mountain range incorporated an all ground condition type (broad spec

    Jan 1, 1987

  • AUSIMM
    The use of the Main Ramp as a Mine Exhaust at the Kencana Mine, Indonesia

    By D J. Brake

    Faced with the need to improve workplace conditions in both its development and production headings in its existing K1 orebody, as well as its new K Link and K2 orebodies, the Kencana mine in Indonesi

    Mar 21, 2011

  • AUSIMM
    Automatic Control of Semi-Autogenous Grinding at Los Bronces

    By Toro HCH, Von Borries GH

    A brief description of the semi-autogenous grinding (SAG;) facilities of Compania Minera Disputada de Las Condes is given. A data-logging and computer system was connected to the plant inter facing th

    Jan 1, 1985

  • AUSIMM
    A tailored solution to determine plant capacity using strategic analysis

    By J Nortier, J Dray

    There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi

    Jun 22, 2022

  • AUSIMM
    Optimising Mobile Equipment Resources in Massive Mining

    Mobile mining equipment presents only a small portion (ten per cent mining project costs but the selected technology will determine to a large extent the mining performance and mine profitability. The

    Jan 1, 2000

  • AUSIMM
    Improving drill productivity and delivering better geophysical data faster

    By T A. J Hopper, S Mukkisa, K-O Ott, D Palmer

    RIG Technologies has developed new technology that can successfully acquire high quality natural gamma ray (GR) and hole deviations, downhole while drilling, on reverse circulation drills. This techno

    Nov 8, 2021

  • AUSIMM
    Electronic Blast Initiation - A System for the New Millennium

    The information age has arrived. In every aspect of life, at the end of the second millennium, computers and information technology have made significant inroads. In mining there has been huge growth

    Jan 1, 1999

  • AUSIMM
    Geochemical Characteristics of Miocene-Pliocene Volcanism in the Hauraki Volcanic Region, North Island, New Zealand

    By R M. Briggs, I E. Smith, P M. Black, A B, R L. Brathwaite, J L. Mauk

    The Hauraki Volcanic Region of the North Island developed between 18 and 1.9 Ma. Initial andesitic volcanism from 18 to 12 Ma was followed by 12 to 1.9 Ma volcanic activity that included rhyolitic, da

    Jan 1, 2007

  • AUSIMM
    Application of High-Resolution X-ray Computed Tomography to Iron Ore Characterisation

    By L C. P J Fonteneau, B Godel, E R. Ramanaidou

    The Hamersley Province in Western Australia hosts large iron ore deposits. Each deposit displays various iron ore types that were defined on their metallurgical properties, especially in terms of poro

    Aug 12, 2013

  • AUSIMM
    Ventilation Design for Xstrata Copper's Ernest Henry Underground Project Prefeasibility Study

    The Ernest Henry Mine is an open pit copper-gold mining operation located in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current concentrator throughput of appr

    Jan 1, 2008

  • AUSIMM
    Automated Drilling Features for Improving Productivity and Reducing Costs in Underground Development

    By J Välivaara

    The mining industry will face numerous challenges over the next 10–15 years as new deposits are likely to be more remote and lower grade and existing deposits will be mined deeper. As a result, mines

    May 9, 2016

  • AUSIMM
    Full Cycle Tailings Management at Fosterville Gold Mine

    By L P. Gray

    "From paving the way in gaining approval for the first metalliferous in-pit tailings storage facility (TSF) in Victoria, to developing a deposition methodology to optimise the storage capacity and pro

    Oct 10, 2016