Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold MineBy R Steven
"Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra
Nov 15, 2016
-
Fine-Tuning Raise Bore Stability Assessments and RiskBy W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
Defining Residual Risk for Successful Mine Closure – a Geochemical PerspectiveBy T Baumgartl, B Noller, B Forsyth, J Park, M Edraki, P Pham
Understanding and quantifying residual risk is the key to the successful closure and rehabilitation of mines. An important aspect of residual risk is predicting the long-term chemistry of mine water a
Jun 28, 2016
-
Goafstream Sampling and the BarometerBy M Brady
"It has long been recognised that the barometer infl uences areas of underground coal mines that havebeen sealed off from the current, or active, mine workings but it appears litt le formal research h
Jun 1, 2012
-
Flotation Process Control Optimisation at Prominent HillBy J Lombardi
OZ Minerals' Prominent Hill copper-gold concentrator is located 130 kilometres south east of the town of Coober Pedy in the Gawler Craton of South Australia. The concentrator was built in 2008 an
Aug 8, 2011
-
Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case StudyBy B Smith, R Gelson
Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila
Jul 1, 2013
-
Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and OptimisationBy O Arafat, K M. Bartholomew
A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia
Sep 1, 2014
-
Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production SchedulingBy P Cesare, S Munro, D Wandel, R A. Bearman
Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t
Nov 24, 2014
-
The Geology of the Eloise Copper-Gold, Deposit, NW Queensland, AustraliaBy T. Baker
The Eloise Cu-Au deposit is 60 km SE of Cloncurry in NW Queensland and has a current indicated reserve of 3.2 Mt @ 5.8 per cent Cu, 1.5gA Au and I9g/t Ag. It is hosted by metasediments and metabasic
Jan 1, 1994
-
Quantitative Risk Assessment Tools to Assist with Waste Management and Placement GuidelinesBy S Lehane, S Pearce
The characterisation and assessment of waste rock has been the subject of considerable research, and many guidance documents have been published both internationally and within Australia. While these
Jul 27, 2015
-
Modular SAG mill discharge trommel for maintenance flexibility and performanceBy K Katov, S T. Ciutina, J D. Pyke
The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s
Aug 29, 2018
-
Gold Mining and Exploration in South America -- An OverviewGold mine production in South America was 247.3 tonnes in 1995 up from 156.4 tonnes ten years earlier in 1986. This represents a 58 per cent increase and amounted to 11 per cent of total world gold mi
Jan 1, 1997
-
Application of Mathematics in Underground Ore Mining in the German Democratic RepublicIn underground ore mining of copper ore, lead-zinc ore, tin ore and fluorspare in German Democratic Republic geological situation is characterized by ore deposits of small thickness and great varia
Jan 1, 1977
-
Regular Measurement Defines Upgrades on Scrubber ScreensBy R Wilson, S Luke, R Williams, B Freeburn
"In 2010, two McLanahan RSS14×50 scrubber screens were installed at Fortescue Metals Group’s (Fortescue) Christmas Creek site. By 2015, the trommel (screen) section had effectively reached the e
Oct 10, 2016
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
Productivity and safety improvements supported by MST’s ImPact System at Glencore’s Mount Isa Copper OperationsBy D Kent, J Bullock, M Wilkinson
Over the last few years at Glencore’s Mount Isa Copper Operations (MICO) mining conditions have become increasingly challenging through lower head grades and higher work indices. MICO has had great su
Oct 16, 2017
-
Underground Auxiliary Ventilation Monitoring and Diagnostic SystemBy S Viviers, G Ratner
Ventilation is part of all underground mine operations and is undertaken in order to introduce fresh, cool air to the workings and to remove stale, affected air. It is problematic to obtain efficient
Jul 1, 2013
-
Exploration advances – MinEx CRC’s missionBy D Giles, A C. Bailey
In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus
Nov 8, 2021
-
Real-time fluorine mineral sensor – taking research to prototypeBy J Moffatt, T Payten, N Spooner, L Teixeira, L A. Balzan, G Wilkie, G Tsiminis
Fluorine is a penalty element due to its reactive nature. In acidic environments many fluorine minerals dissolve to form hydrofluoric acid (HF), changing processing conditions. When smelted HF can be
Aug 24, 2022
-
Effectively Installing and Commissioning Flotation EquipmentBy B Murphy, J L. Heath
Installation of flotation equipment is a lengthy and intricate process involving conceptual design, detailed design and layout, equipment installation, equipment commissioning and handover prior to th
Sep 1, 2014