Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    SUSOP«: Embedding Sustainable Development Principles into the Design and Operation of Resource Extraction and Processing Operations

    Though many mining and mineral processing companies have embraced the principles of sustainable development (SD), there is still a significant challenge of applying these in a practical sense, either

    Jun 1, 2010

  • AUSIMM
    A Comparison of Massive Sulphide Deposits Forming at the PACMANUS (Manus Basin, PNG) and Jade (Okinawa Trough, South China Sea) Seafloor Hydrothermal Fields

    By R A. Binns, S Murao

    The PACMANUS and Jade deposits are two active hydrothermal fields that are forming massive sulphide deposits at the Pacific rim margin. Both are associat

    Jan 1, 1995

  • AUSIMM
    Comparison of Environmental Discharges from Historic Coal and Gold Mines, Reefton, New Zealand

    By D Craw

    At Reefton, mesothermal gold deposits occur in the Ordovician Greenland Group basement and bituminous coal deposits occur in overlying Eocene Brunner Coal Measures. These different resource types occu

    Jan 1, 2003

  • AUSIMM
    Description of Lead Refinery

    The building is a lofty, well-ventilated one of hardwood frame, with galvanized-iron walls and roof, and consists of five spans running north and south, covering a total length of 236 ft. Each span is

    Jan 1, 1918

  • AUSIMM
    Three-Dimensional Hydromechanical Simulation for Large, Faulted Pit Slopes

    Owing to improvements in computer capacity, it is now possible to undertake fully coupled or partially coupled, three-dimensional (3D) hydromechanical Finite Element (FE) simulation of mines, includin

    May 1, 2010

  • AUSIMM
    Bench Stoping at Mount Isa Mines Limited Isa Lead Mine - Mount Isa, Queensland

    By J Robinson, D Herbert

    Bench stoping operations at the Isa Lead mine have been underway for over 11 years. They were implemented to address safety, productivity and mining cost concerns noted with cut and fill mining operat

    Jan 1, 1998

  • AUSIMM
    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Flotation Performance Improvement by Air Recovery Optimisation on Roughers and Scavengers

    Sep 13, 2010

  • AUSIMM
    Recovery Efficiency Study on Ilesha Placer Gold Ore by Flotation Using Locally-Sourced Frothers and Collectors

    Recovery Efficiency Study on Ilesha Placer Gold Ore by Flotation Using Locally-Sourced Frothers and Collectors

    Sep 13, 2010

  • AUSIMM
    The Effect of the Australian Carbon Trading Scheme on a Large Scale Open Pit Mining Operation

    The mining industry continues to be a major driver of the Australian economy generating over A$130 billion in export earnings in 2008/2009. However, the industry has been cited as a significant contri

    Dec 6, 2010

  • AUSIMM
    Automation for efficient separation with the Outotec SLon® vertically pulsating high gradient magnetic separator

    By I Sherrell, R Jain, P Jansson

    With the depleting iron reserves and difficult market conditions, precision in separation efficiency is of utmost importance. Classical local control options are predominant in the industry, but their

    Jul 24, 2017

  • AUSIMM
    The Golden Cross Mine Underground Development Experience and Practice

    The Golden Cross Mine will be the first underground gold mine in New Zealand to operate since 1952. The development plans, along with the conditions and circumstances presently found in the now ongoin

    Jan 1, 1991

  • AUSIMM
    Mobilisation of Antimony and Arsenic Around Mesothermal Stibnite Deposits and Environmental Implications

    By P M. Ashley

    Antimony (Sb) is an element similar to arsenic that forms anions in surface waters, rather than cations like other metals. Little is known about natural mobility of antimony in the environment. Howeve

    Jan 1, 2002

  • AUSIMM
    Styles of High-Sulphidation Gold, Silver and Copper Mineralisation in Porphyry and Epithermal Environments

    High-sulphidation (HS) gold, silver and/or copper deposits are generated in both the epithermal and the upper parts of the underlying porphyry environments over vertical intervals of up to 2 km. The H

    Jan 1, 1999

  • AUSIMM
    Conceptual Planning for the Expansion of Primary Steelmaking at New Zealand Steel Limited

    In November 1969, New Zealand Steel Ltd pioneered the commercial use of the SL/RN solid fuel direct reduction process to make sponge iron as a feed material for electric arc furnaces. Serious process

    Jan 1, 1980

  • AUSIMM
    PACMANUS: An Active Seafloor Hydrothermal Field on Siliceous Volcanic Rocks in the Eastern Manus Basin, Papua New Guinea

    By J M. Parr, P M. Herzig, J B. Gemmell, S D. Scott

    PACMANUS is an actively-forming seafloor analogue of volcanic-hosted massive sulfide orebodies, situated on the crest of an andesite-dacite-rhyodacite ridge overlying rifted older arc crust in a back-

    Jan 1, 1995

  • AUSIMM
    Recycling of Process Water in Sulfides Processing and Flotation Selectivity

    Recycling of Process Water in Sulfides Processing and Flotation Selectivity

    Sep 13, 2010

  • AUSIMM
    The Victoria Gold Deposit in the Mankayan Mineral District, Luzon, Philippines

    By A G. Cuison, B V. Andam

    Three well-known copper and gold deposits in northern Luzon, Philippines are located in the Mankayan Mineral District. These are the Lepanto Copper-Gold Deposit, the Far Southeast Porphyry Copper Depo

    Jan 1, 1999

  • AUSIMM
    A New Genetic Algorithm for Open Pit Design - The Two-Dimensional Case

    The design of a mine should aim to optimise the market value by maximising revenues whilst minimising costs. In open pit mining, the nature of the extraction technique translates this objective into t

    Dec 6, 2010

  • AUSIMM
    Use of Ferro-Wastes in Sinter Making

    By P S. Datta, V N. Misra

    Higher bed height up to 680 mm, including 30 mm hearth layer of sized return sinter and high suction below the grate bars up to 1400 mm WG have resulted in increasing the productivity to a level of 33

    Jan 1, 2002

  • AUSIMM
    Development of a Special Purpose Coupling for Jointing Polyurethane Lined, High Pressure Pipework

    The New Zealand Steel Ironsand Slurry Pipeline was successfully commissioned in February 1986. The project includes 18 km of high pressure, polyurethane lined buried pipe. McConnell Dowell Constructo

    Jan 1, 1986