Considerations Regarding the Registration of Professional EngineersThe US Constitution provides for regulation by the states for protecting the public's safety, health, and welfare. Hence, in the eyes of the law of all states today, this is the sole justificatio
Jan 2, 1984
-
OFR-11(2)-82 Recontouring Of Steep-Slope Abandoned Contour Mines - Volume II - AppendicesBy Daniel I. Carey
Current and potential dragline reclamation usage was evaluated for the U.S. coalfields based on data gathered and analyzed during field surveys, literature reviews and contacts with manufacturers. It
Jan 1, 1981
-
Capping and Kriging Grades with Long-Tailed DistributionsBy M. Maleki
Variogram analysis and kriging lack robustness in the presence of outliers and data with long-tailed distributions, which often arises when estimating grades in precious metal deposits. The capping te
Jan 1, 2014
-
OFR-84(6)-76 A Master Environmental Control And Mine System Design Simulator For Underground Coal Mining - Volume VI - Production Subsystem ? I. IntroductionBy C. B. Manula
Simulation continues to hold the spotlight among the Operations Research applications in the operational side of mining. One reason for this is the need to solve the many waiting line and storage prob
Jan 1, 1974
-
The Lithium Industry - Challenges For The Future - IntroductionBy I. A. Kunasz
This paper is not intended to review and re-state general information on lithium, but rather to analyze the paradigm that has caused such a rapid rise in lithium production and the development of new
Jan 1, 2011
-
Evaluation of the Effects of Length on Strength of Slender Pillars in Limestone Mines Using Numerical ModelingBy Dennis R. Dolinar, Gabriel S. Esterhuizen
In this National Institute for Occupational Safety and Health (NIOSH) investigation, numerical modeling is used to evaluate the degree the pillar strength is increased with a rectangular pillar over a
-
Experimental investigation of the oxidation and consolidation of sulphide aggregates and the application to underground muck-piles Lockerby Mine, Sudbury, OntarioBy S. Nikolic, O. O. Kehinde-Philllps, O. T. Djamgouz, D. H. Rousell
"A bulk mining method is employed at the Lockerby mine resulting in the formation of large muck-piles. If these muckpiles remain in the stopes for some time they may agglomerate to the extent that the
Jan 1, 1984
-
The Price Is Right?Planning Large Water Tunnel Contracts In New YorkBy Christian Maguire
Tunnel contracts in New York have in recent years had few bidders with the bids received being much higher than anticipated. Since 9/11, security has become a key issue in planning key infrastructure
-
Survey of World Energy ResourcesBy M. King Hubbert
"The present large-scale use of energy and power by the human species represents a unique event in the billions of years of geologic history. Furthermore, in magnitude, most of the development has occ
Jan 1, 1973
-
Extraction And Recovery Of Radium, Uranium And Vanadium From Carnotite. - Introduction.By Charles L. Parsons
Early in 1912, from information received by the Bureau of Mines, it became evident that quantities of valuable radium-bearing ore from Colorado were being exported for manufacture in foreign countries
Jan 1, 1915
-
Unusual Solutions To Difficult Earth Retention And Underpinning Projects ? SummaryBy Larry Rayburn
Design of cost effective engineered solutions to complex problems requires the team efforts of the owner, the designer and the specialty construction contractor. The basic ingredients of success requi
Jan 1, 1991
-
Factors Influencing Base Metal Recovery From Waste Reverberatory Furnace Slags In A50 KVA Laboratory DC Plasma Arc FurnaceBy W. Banda
Paper written on project work carried out in partial fulfilment of Phd. (Process Engineering) degree* The recovery of cobalt and copper from waste slag was studied in a plasma DC-arc furnace in red
Jan 1, 2004
-
Unplanned dilution and ore loss prediction in longhole stoping mines via multiple regression and artificial neural network analysesBy H. Jang, Y. Kawamura
Unplanned dilution and ore loss directly influence not only the productivity of underground stopes, but also the profitability of the entire mining process. Stope dilution is a result of complex inter
Jan 1, 2015
-
IC 8311 A Thermal-Recovery Project And Two Waterflood Projects In Carter, Garvin, And Stephens Counties, Okla., 1966 (1fc5c005-c229-4b23-aa01-bbc50c92368e)By Kenneth H. Johnston
This publication describes a thermal-recovery project and two waterflood projects in Carter, Garvin, and Stephens Counties, Okla., that will be visited during the 1966 annual tour by the Bureau of Min
Jan 1, 1966
-
OFR-96-83 A Study Of Explosion-Proof EnclosuresBy P. A. Cox
The purpose of the initial research performed under this contract was to determine the margins of safety in explosion-proof (XP) enclosures, which were designed and certified according to the current
Jan 1, 1982
-
How to Achieve Operational Reliability in the Natural Resources and Petroleum IndustriesBy Emilio Giuseppe Sarno Severi
Mining and Petroleum Similar Industries ?Asset Intensive ?Exposed to market volatility ?Highly Risky Operations ?Scarcity of Experienced and Trained resources ?Operating in diverse countries wi
Nov 1, 2011
-
IC 8311 A Thermal-Recovery Project And Two Waterflood Projects In Carter, Garvin, And Stephens Counties, Okla., 1966By Kenneth H. Johnston
This publication describes a thermal-recovery project and two waterflood projects in Carter, Garvin, and Stephens Counties, Okla., that will be visited during the 1966 annual tour by the Bureau of Min
Jan 1, 1966
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)"The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to
Jan 1, 2007
-
Optimization of the paste backfill plant at Louvicourt mineBy J. Cayouette
In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through
Jan 1, 2003