Search Documents

  • DFI
  • AUSIMM
    Excavation by Tunnel Boring Machine in Headrace Tunnel of Small Cross Section

    By Hori M, Komatsu T

    In Japan, a small-diameter tunnel boring machine (TBM) of diameter 2.6 m applicable to a wide range of geology from hard rock to soft strata was developed with the purpose of reducing construction

    Jan 1, 1987

  • SME
    Virtual Reality Simulator For Training Miners To Install Rock Bolts Using Jackleg Drill

    By J. Warmbrodt, D. Apel, D. Nutakor, L. Grayson, M. Hilgers

    MinerSIM is an augmented reality system with integrated hypermedia that is suitable for training underground miners in the basics of using a jackleg drill to install rock bolts. While statistical evi

    Jan 1, 2007

  • CIM
    Applications for Magnetic Mill Linings at the Horne Concentrator of Noranda Mines Limited

    By P. W. Godbehere

    "INTRODUCTIONMagnetic mill linings have been developed from an invention by Mr. Bertil Brandt, the originator of the Skega rubber lining. The OREBED magnetic mill lining is a concept in which rubber c

    Jan 1, 1983

  • CIM
    Discrete Event Control and Dynamic Scheduling for Tele-Robotic Mining

    By Jamie King

    This paper describes the use of dynamic scheduling and discrete event control to provide coordinated control of multiple automated vehicles. In the past decade there have been significant advances in

    May 1, 2001

  • SME-ICGCM
    Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)

    By Daniel Su

    This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en

    Jan 1, 2009

  • SME
    Massive Tires Keep The Industry Rolling

    One of the biggest challenges for the mining industry is, quite literally, how to the keep the equipment rolling. There is a limited amount of companies that manufacture the 4.2-m- (14-ft-) tall, 5,

    Jan 1, 2008

  • SME
    Justifying API Bentonite Rheological Behavior Through Its Forming Size Fractions Mining, Metallurgy and Exploration (8673045d-721a-4112-8198-a3a9a24151ef)

    By A. A. El-Midany, R. M. Farag, A. M. Salem, S. E. El-Mofty

    Bentonite represents one of the main players in the stability of the drilling mud. Its particle size and particle size distribution affect the physical properties of the drilling mud especially the rh

  • DFI
    Special Foundation Systems - Paper 2.1 - The Merits Of Polymeric Fluids As Support Slurries

    By K. Englehardt

    J BERESFORD introduced the subject of the paper which is the use of polymeric slurries to support the sides of diaphragm wall and bored pile excavations during construction. In the opinion of the auth

    Jan 1, 1991

  • AUSIMM
    Flotation Practice at Mount Lyell

    THE flotation plant at Mount Lyell was erected, primarily, for the treatment of ore from the Lyell Comstock mine. These workings are situated over a mile in a direct line north of the North Mount Lyel

    Jan 1, 1920

  • IMMS
    Formation Of Fe-Mn Crusts Under Conditions Of Strong Upwelling At A Continental Margin: Rodriguez Seamount, Offshore Central California

    By James R. Hein

    Rodriguez Seamount, located 150 km off the central California coast at the base of the continental slope, was studied using the ROV Tiburon aboard MBARI?s R/V Western Flyer, October 13-16, 2003. Fe-Mn

    Jan 1, 2004

  • SME
    Design Aspects Of Underground Rescue Chambers

    By A. D. S. Gillies

    The use of refuge chambers for use in handling underground emergencies is an issue of topical relevance within the US mining industry. Chamber design is of importance to meet some new safety requireme

    Jan 1, 2012

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • CIM
    Mineral resource + engineering, economic and legal feasibility = ore reserve

    By M. Vallée

    Several reviews of mineral project performance in the past 35 years indicate a pattern of occasional, but recurrent, mining project failures due to shortcomings in geological information and estimatio

    Jan 1, 2000

  • AIME
    Blast-Furnace Practice

    By Chas. B. Dudley

    A Discussion of the papers of Mr. James Gayley, on "The Application of the Dry-Air Blast to the Manufacture of Iron," and of Mr. J. E. Johnson, Jr., on "The Physical Action of the Blast-Furnace," by M

    Sep 1, 1905

  • CIM
    802.11 Wireless Site Survey Methodologies in an Underground Mine Environment

    By Mark G. Lafontaine

    Underground 802.11 wireless communications has become widely adopted for automation and communication purposes but maximizing the wireless signal presents many obstacles given the harsh environment as

    May 1, 2013

  • NIOSH
    RI 5993 Purification Of Electrolytes For The Deposition Of High-Purity Nickel ? Summary

    By J. G. Donaldson

    Nickel containing less than 0.01 percent of total metallic impurities was produced at the Rolla Metallurgy Research Center of the Bureau of Mines by electrodeposition from purified electrolytes. The f

    Jan 1, 1962

  • SAIMM
    Hybrid finite-/discrete-element modelling of progressive failure in massive rock slopes

    By H. Willenberg, J. S. Coggan

    ABSTRACT: Although individually both continuum and discontinuum numerical analyses provide useful means to analyze rock slope stability problems, complex failures typically involve mechanisms related

    Jan 1, 2003

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • SME
    Disc Cutter Performance in Boulder-Laden Ground ? Introduction

    By D. S. Kieffer

    Ground characterized by hard boulders embedded in soft matrix represents one of the most challenging conditions for TBMs, as the cutterhead must cope with the non-optimal conditions of cutting hard bl

    Jan 1, 2008