Search Documents

  • SAIMM
    Mining with caved in bed, method used in the Jiu Valley—Safety and technical issues

    By L. Jurca, C. Gligor

    After 1990, a great process of re-organisation and economic reform has occurred in the Romanian mining sector and especially in the pitcoal mining in the Jiu Valley. This process has included both leg

    Jan 1, 2003

  • IOM3
    Dragline-bench instability risk management

    horizontal-type classifier prior to charging into a blastfurnace.

    Apr 1, 1995

  • AUSIMM
    The Design of Continuous Thickeners for Flocculated Materials

    By Goldney L. H

    The authors review the literature and discuss the application of methods to the design of thickeners for ilocculated metallurgical pulps. The use and evaluation of flocculents is described. Experiment

    Jan 1, 1959

  • CIM
    Stresses in Depth Around Elliptical and Ovaloidal Openings in an Infinite Elastic Medium

    By J. E. Udd, L. P. Geldart, B. B. Dhar

    "Solutions for the stress distributions around simulated underground openings have been limited to calculations of boundary stresses for simple openings in which the boundaries may be expressed in mat

    Jan 1, 1970

  • NIOSH
    IC 8390 Basic Coal Research In The United States

    Reports by researchers in government, industry, and universities of the United States are given for various projects on basic coal research concerning, the metamorphism, physical and chemical properti

    Jan 1, 1968

  • CIM
    Overview of Lake Shore Gold’s 2012 - 2013 Bell Creek Mill Expansion

    By D. B. Felsher

    "Lakeshore Gold’s Bell Creek Mill is located in Timmins, Ontario. The mill has been in operation since 2009 and has undergone several small expansions since then. In 2012 - 2013 the first major mill

    Jan 1, 2015

  • AUSIMM
    Presidential Address. Some Applications of Geology to Mining and Metallurgy

    Professor Skeats said: I wish at the ,outset to express my appreciation of the h0!-l0ur conferred on me by my election as President of this Institute for the ensuing year. The selection of a geologist

    Jan 1, 1924

  • AUSIMM
    A Case Study of the Zhilingtou Gold-Silver Deposit, Zhejiang, China

    By C Zhang, P Wang, S Yao

    The Zhilingtou Au-Ag deposit is situated in the eastern part of the complexly deformed and metamorphosed South China Caledonian Fold Belt. It consists of seven orebodies that are almost exclusively ho

    Jan 1, 1995

  • AIME
    Iron and Steel Division - Solubility of Nitrogen in Liquid Iron Alloys. 1. Thermodynamics

    By R. D. Pehke, J. F. Elliott

    The solubility of nitrogen in liquid pure iron has been measured as a function of pressure and temperature. Sieverts' Law is obeyed at all pressures up to 1 atm and the temperature coefficient of

    Jan 1, 1961

  • AUSIMM
    Interpretation of Flotation Data for the Design of Process Plants

    By G S. Lane, G D. Richmond, J Dioses

    This paper discusses the methods used in the design of flotation plants, including benchscale batch and locked cycle tests and pilot plant trials. Two case studies are presented, one for the Cadia Hil

    Jan 1, 2002

  • AUSIMM
    The Physical Basis of Non-Random Breakage in an Iron-Oxide Ore Hosted Copper Gold Ore

    The Physical Basis of Non-Random Breakage in an Iron-Oxide Ore Hosted Copper Gold Ore

    Sep 13, 2010

  • DFI
    Geotechnical Exploration Phase Drilled Shaft Load Testing

    By Walter E. Vanderpool

    Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and

    Jan 1, 2011

  • AIME
    Towards A Comprehensive Mathematical Model Of The Blast Furnace

    By M. Cross

    INTRODUCTION The results of the Japanese dissective investigations have [l-4] transformed our understanding of how the blast furnace operates. These studies revealed an internal structure of the fu

    Jan 1, 1984

  • SME
    Practical Methods Of Shallow Shaft Sinking

    By James J. Brady, Joginder S. Bhore, Robert B. Gordon, Jimmy W. Honeycutt

    The authors of this paper have a combined construction experience of 70 years. They have served as engineers and managers on projects throughout the United States and Canada. Approximately 50 shafts h

    Jan 1, 1985

  • CIM
    LIDAR Geotechnical Mapping for the Construction of Deep Underground Science and Engineering Laboratory at the Former Homestake Mine

    By Zbigniew J. Hladysz

    A Deep Underground Science and Engineering Laboratory (DUSEL) is being planned at the site of the former Homestake Gold Mine in Lead, South Dakota, under the sponsorship of the US National Science Fou

    May 1, 2011

  • DFI
    Seattle Shored Excavation - Design, Construction, Monitoring

    By David Winter

    The geotechnical design, construction, and monitoring aspects of a tied back excavation 85 feet deep in Seattle, Washington are presented. The excavation was completed in overconsolidated deposits of

    Jan 1, 1987

  • SME-ICGCM
    Applications Of New Technologies To The Technical Design And Monitoring Of Longwall Panels

    By Brad R. Blair

    This paper will review impacts on longwall design and ground stability assessment due to advances in mine automation and sensing technology. Several new approaches to the prediction and monitoring of

    Jan 1, 1996

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011

  • AUSIMM
    Pelletising Characteristics of the Magnetite Concentrate from Daye Iron Mine

    By Xu Z, Hu C

    An attempt has been made to investigate the performance of green pellet formation of the Daye magnetite concentrate from the weak-magnetic separation plant. The optimum conditions for the commercial

    Jan 1, 1999

  • SME
    Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)

    By D. X. Tang, G. Wilson, S. S. Peng

    Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o

    Jan 1, 2006